An experienced DIYer takes on his first house build: a luxury A-frame cabin in the Idaho mountains, with over $500,000 at stake. Watch the full build from start to finish as Alex from Mr. Build It transforms a steep plot into a 2,000-square-foot mountain home.
Over nine months, Alex coordinates professional crews and tackles major jobs himself to control costs. Follow the construction from the foundations and timber framing to the roofing, insulation, decks, kitchen, and custom interior finishes.
But this is far more demanding than another DIY project. A crane cannot make the critical lift, a 5,000-pound ridge beam tests the crew’s ingenuity, and incorrectly sized roof panels leave the build racing against winter. Every setback brings another problem to solve—and more money on the line.
Discover what it takes to go from renovating homes to managing an entire house build, all the way to the finished cabin.
Alex is risking over half a million dollars to build
an A-frame cabin on a steep Idaho mountainside.
As a first-time general contractor,
he takes on major jobs himself to control costs
and turn raw ground into a potentially life-changing return.
It all starts in the Idaho mountains,
where part of the hillside has to be carved away
for a massive foundation pit
on a half-acre plot Alex bought for $80,000.
This is only the first investment,
as his goal is to build a high-value property
and cash out big by selling it for the strongest return possible.
And with the foundation set, the build can finally begin.
Getting tons of building
materials into the mountains is both
a logistical challenge and an added cost.
But Alex is committed to a clear vision, building an A-frame cabin,
a design where steep rooflines form the walls
and create its signature triangular shape.
It delivers the iconic mountain look he wants,
but that geometry will make almost every stage
of the build more complicated.
As the cabin floor takes shape, Alex is entering unfamiliar territory.
Known as Mr. Build-It,
he has spent years renovating homes and tackling ambitious DIY
projects. But building an entire house from the ground up
is beyond anything he has done before.
Here's a couple of reasons why I'm not building it myself.
Look how intricate this is.
This is art, almost. There's no way I
could pull that off with my skill set.
Number two, this is requiring a crew. It's just me.
And even if I get an extra set of hands, I still can't pull this off.
And number three, I'm trying to help the guys.
And they, like, say no, because I'm basically a liability.
Alex has taken on the role of general contractor,
the person responsible for coordinating the trades,
schedules, and different stages of construction.
Then take on as much of the remaining work as he can himself
to keep labor costs down.
And that role becomes very real
with the arrival of the cabin's ridge beam.
This 5,000-pound engineered timber will form
the structural spine of the A-frame
and lock the two sides together at the peak.
Holy smokes.
This is what $15,000 looks like right here.
60 feet, 36 inches wide, 8 3 quarters thick.
My heart is pounding, man.
The plan was simple.
Bring in a crane and lift the beam to the top of the cabin.
But on this terrain, nothing is ever that simple.
Cannot reach this far up the hillside.
I thought they're going to bring their biggest crane.
I thought there's only one crane, but they just sent me a crane.
He's going to try to weigh it to see what it weighs, and then he'll
kind of crunch his own math to see what the risk factor here is.
I really thought today was going to work.
Forced to work from 50 feet away,
the crane operator recalculates the lift. As the boom extends,
the load gains leverage and the crane's lifting capacity drops.
Alex's plan
has failed,
but his crew is not
ready to give up.
They believe the telehandler might still give them
a way to make the lift.
But first, the 5,000-pound beam has to be dragged into position.
They will attempt to lift the beam into place using the telehandler,
a risky, cowboy-style solution.
The genie can pick up the weight,
but its lifting capacity drops as the boom extends.
One failed strap or sudden drop could send
5,000 pounds crashing through the structure.
They are almost there,
but the boom is maxed out.
If the forklift had an extra foot in it, it would be golden.
With no more reach available,
the crew begins swinging the suspended beam like a pendulum,
trying to clear the peaks one at a time.
The beam has
cleared the peaks,
but it
is still sitting
off-center.
We've got to move it over a little bit.
The crew now has to guide it into its final position.
One wrong movement could send it slipping off the frame.
Filting.
No, no, no, no, no, no, no!
We've got to use a strap.
Because if that tilts, it collapses everything.
After one last close call,
the beam finally settles
into place.
I swear, that thing was tilted
as soon as he came up there.
And if that thing tilts, this sucker crashes
and breaks everything that's been done.
Everything.
With a mix of ingenuity and luck,
the crew quickly moves forward with framing.
To anchor the beam, they install wooden pillars and 32-foot rafters,
revealing the architectural magic of the A-frame.
The walls and the roof are one and the same.
Alex has hired a framing crew to get
the structure standing in four weeks,
with a $35,000 investment in labor alone.
To lock the rafters into a rigid shell,
the open frame is covered in OSB panels.
But the skeleton isn't locked in yet.
The massive beam was initially left long,
and now, trimming the excess forces one last dangerous task.
When a thing falls, it has to not hit the building.
With framing complete,
the cabin is ready for its first major test.
So according to this building permit, I have passed
my footing inspection, my foundation stem wall inspection,
and today, ladies and gentlemen, we pass our shear inspection.
This inspection confirms the frame is properly braced,
clearing the build to move into the plumbing rough-in.
Unlike a conventional house, the A-frame's slanted
walls barely leave hidden space for pipes and drains.
As the plumbing crew adapts the routing to the unusual geometry,
Alex shifts his attention outside
and wraps the house in a weather-resistant membrane,
a protective layer designed to keep moisture away from the structure.
But every window opening breaks that barrier,
leaving vulnerable edges where water could seep in.
To protect these weak points, he uses flashing tape,
a waterproof adhesive membrane.
It has to be applied carefully, because even a small gap in the seal
could eventually lead to water damage and costly repairs.
With winter closing in,
the race is on to finish wrapping
the cabin
and get the doors installed.
Come on, way too big.
This is 38 and this is 30.
As a general contractor,
Alex is learning that the job often comes down to being a glorified
problem solver. When something goes wrong,
he has to step in quickly and fix it himself.
His supervision is essential. What the hell?
Why is it on the ground? Why is that deck on the ground?
We're supposed to lift her or something?
I appreciate the help with it, but the thing is the plans show that
it goes off here, comes out,
and attaches with hangers on the bottom of this.
The deck was framed on the ground,
instead of level with the door openings.
It has to be raised before the sliding glass doors can go in.
Alex brings in professionals for the installation.
These heavy sliders are difficult to handle and need precise alignment.
Even a small error could bind the tracks or damage the glass.
He chose to invest in premium black-trimmed Pella glass
to maximize the views and boost the property's final value.
Altogether, the investment in doors
and windows adds up to $35,000.
With the deck now corrected,
he heads back outside to finish it himself.
For the surface, Alex chooses
Trex composite decking.
Unlike traditional lumber,
it resists rot and moisture and requires far less maintenance.
An advantage in Idaho's rough climate.
Alex knows the deck is worth the effort.
Three out of four American buyers consider one essential,
and a well-built outdoor space can return every dollar invested.
But as he finishes the deck, the weather is already turning,
and the cabin remains exposed.
The roofing crew finally arrives and starts weatherproofing the roof.
An ice barrier goes along the bottom edge,
while a moisture barrier covers the rest.
But as they begin laying the cladding,
the crew discovers a major problem.
The panels were cut to the wrong measurements.
Ah, dude, not that great. The guys are pulling panels up right now,
and they're saying the panels are a foot short.
All right, so we're gonna be another couple of weeks out on this, huh?
Murphy's law, anything can't go wrong will go wrong.
The final cladding will have to wait for new panels.
But with winter closing in, Alex must shift to the remaining groundwork
before frozen ground makes digging impossible.
First, they have to carve out a pit 15 feet long
and more than 5 feet deep to bury the 1,100-gallon septic tank.
But the real challenge is building
a 50-ton retaining wall strong enough to hold the hillside in place
and prevent the slope from ever pushing into the cabin.
The wall will be split into two tiers using precast concrete blocks
that interlock together.
At 94 pounds each, machinery handles the heavy lifting,
but every piece still has to be placed and aligned manually.
Every two rows, they add extra support,
drain rock to help lock the blocks together,
and a mesh to anchor the wall into the hillside.
This retaining wall does more than just hold back the mountain.
It turns 1,100 square feet into valuable outdoor space,
ground that Alex himself will later shape with a staircase,
a massive deck, and a patio walkway.
But after weeks of racing the weather, winter is finally here.
The wall is now buried in ice and snow,
but the finishing caps are still missing.
Alex must improvise.
He builds his own torch to melt the ice off
and place the decorative caps, the finishing pieces that
cover the top of the wall.
After two weeks of construction, the retaining wall
is finally complete, another major investment of $40,000.
It's super cold, foggy, as you can see,
which doesn't help warm up.
But these guys are getting clever.
Check out what they're doing.
Staying warm.
After weeks of waiting,
the replacement cladding panels are finally here.
It is a late install, but the cabin needs this roof now more than ever.
With snow already piling up,
the permanent cladding is essential to keep the weather out.
After a $14,000 investment,
the cabin is finally sealed.
Now comes the challenge
of turning 2,000 square feet into a working home.
Alex starts with the electrical layout,
mapping the wiring room by room with the electrician.
Are you doing anything special over here in your mudroom space?
Just gonna have some hangers,
maybe a bench with drawers underneath for shoes and stuff like that.
The mudroom will create a transition between outside and inside,
keeping coats, gear, and wet boots contained.
And the kitchen will be a bright Scandinavian
space centered on a large island.
With quartz counters and custom details, Alex plans to build himself.
Dining room is the most complicated part, right?
Because when you don't have the cabinets,
you kind of don't know what you need.
Correct.
By working alongside every trade
and taking responsibility for the decisions that will shape the build,
Alex is steadily growing
into the true general contractor his project demands.
There's no way to get...
And this build now demands a major insulation job.
Alex has never sprayed
polyurethane foam before.
But he tackles the job himself to keep costs under control.
The closed-cell foam seals gaps and air leaks,
while also acting as a vapor barrier.
He then adds fiberglass bats, thick blankets that provide
the main insulation across the larger cavities.
With the insulation successfully installed,
the walls are now ready for the drywall.
But delivering the drywall material brings back an old problem.
A crane on the road, struggling to reach the cabin.
I think they're having balance issues.
It's either ice or mud.
I don't know which one's worse at this moment.
The frozen ground has turned into mud,
and the crane's support legs are sinking.
And with this crane now at 50 feet of reach,
the warning signs feel too familiar.
The building is 50 feet.
Way more than I could lift from that distance.
I'm left with a $1,000 bill for a job that can't get finished.
I have to extend the crane too far,
so for me right now it's kind of dangerous.
But Alex is not losing another crane battle,
so he braces the crane's support legs with
concrete blocks and timber to give it a solid base.
It works, and the crane can now
just reach the cabin,
barely enough for the crew to unload the drywall by hand.
Unlike the insulation, Alex leaves the drywall to the pros.
In just one week, they hang, tape, and smooth the entire cabin,
keeping the build on schedule to move into flooring.
He chooses a waterproof laminate,
tough enough for mountain life and easy enough to install.
With the interior taking shape
and the sun finally back,
the build shifts outside, starting with the siding.
To keep costs down, Alex takes on the job himself,
using Western Red Cedar, a fitting choice for Idaho.
This material naturally resists decay and,
with proper care, can last for decades.
But to reach that durability,
the cedar still needs stain to protect it from the weather.
The seams are caulked first,
then a semi-transparent stain goes across the cabin.
But it can pool or run, leaving streaks and dark patches.
This is the most critical part spraying the stain.
It sprays easy, but it's really watery.
So it's going to start dripping on you.
It's going to cure unevenly.
So by back rolling, it's going to push our stain deep
into the little fibers for it to have even a better seal.
For something that looks so simple,
The cedar exterior has taken three weeks of meticulous work,
with more than 1,000 square feet carefully spaced,
fastened, and stained.
This new skin transforms the cabin into a warm,
modern mountain retreat.
After a $12,000 investment, sticking with the same hands-on approach,
Alex tries his luck operating the excavator himself,
digging the footings for a larger deck on the cabin's main viewside.
Stretching 30 feet across the main facade,
the deck will add 300 square feet of outdoor living space,
turning the mountain view from something framed by glass
into a place
to actually
experience it.
All of this work feeds the same investment strategy.
Turn the cabin into a more valuable
property before it goes up for sale.
A composite deck like
this can represent around $22,000 in resale value,
giving him every reason to keep improving
the raw ground around the house.
So Alex turns to the steep hillside leading up to the deck.
But using the excavator here would destroy the slope,
forcing the new access steps to be dug by hand.
We gotta make sure the sucker is leveled.
This is your base. This is your foundation.
If this is out of whack, the rest of our steps will be out of whack.
With the base leveled,
he builds U-shaped steps from pressure-treated lumber.
Far cheaper than concrete and a natural fit for the cabin's look.
Each frame overlaps the one below
and is pinned to the ground with rebar,
locking the staircase together and stopping it from sliding.
I hate how murderers
in movies are portrayed.
Digging holes. And they can do it in like, I don't know, 10 minutes.
That's what I hate about Hollywood, man.
They lie to us about using shovels.
Using crushed aggregate inside the steps is a simple, durable solution.
It packs firm underfoot while still allowing water to drain.
But even compacted gravel can wash downhill over time.
So three coats of mulch glue help hold the stones in place.
In just three days, Alex finishes the outdoor steps,
clearing the way for the final exterior job.
His goal is to turn 500 square feet of uneven ground
into a clean, low-maintenance patio walkway.
A compacted layer of road mix comes first,
creating a firm base that will keep the pavers from sinking
and shifting over time.
Next comes a layer of fine sand.
Using pipes as screed guides, he levels it into a smooth, stable base.
Once ready, the concrete pavers go in.
Instead of casting them,
Alex bought them prefabricated to save time and reduce winter cracking.
With every paver in place,
crushed aggregate is swept into the gaps to lock everything together.
A garden box adds the final touch.
By building the outdoor steps and walkway himself,
Alex spends only about $3,000, a major saving on the project.
With the exterior finally complete, Alex switches gears
and heads back to his home workshop to begin the interior,
starting with the mudroom lockers.
Built from plywood panels,
they are shaped to match the A-frame's slanted geometry.
Building them himself gives Alex
a custom fit for a fraction of the cost.
As the heavy construction winds down,
he is now leaning fully into his strengths as a DIY builder,
taking on as much of the remaining work as possible.
The lockers will keep boots, coats,
and gear contained in one place,
helping the mudroom stop dirt
from spreading through the cabin's interior.
Back at the cabin, the lockers are ready to go in.
But instead of a standard butcher block,
he upgrades the bench to a $500 live-edge walnut slab,
adding a premium custom detail
that will improve the cabin's resale appeal.
With the mudroom finished,
another delivery begins moving into the cabin.
This shipment signals the start
of the biggest interior project, the kitchen.
The hard part's done. We got all the cabinets in safely,
didn't damage anything. Awesome.
Now comes the fun part-ish, putting it all together.
Building the cabinets himself could have taken the rest of the year,
so Alex has them custom made.
For him, the kitchen is the jewel of the cabin.
He intends to keep it light, open, and welcoming.
Every inch is pre-planned to make the most of the space,
with cabinets reaching the 9-foot ceiling line
and an island lined up with the window.
But the white quartz countertops are the kitchen's standout feature.
And with the island slab weighing up to 500 pounds,
it takes 3 people just to get it into place.
For the backsplash,
a white picket mosaic adds more texture than a standard subway tile.
The final details go into place,
including rose gold knobs and champagne gold fixtures.
These choices are deliberate.
They warm up the space and bring a subtle vintage touch
to the clean Scandinavian kitchen.
For a first time install,
Alex nails it.
And by doing the work himself,
the kitchen brings one final major investment
of almost $24,000 to the project.
The build is down to its final stretch, the bathrooms.
By now, Alex has learned how to make
the A-Frame's limitations work best in his favor.
He starts downstairs with a clean, spa-like space featuring
white quartz, large tiles, and a stand-up shower.
With one bathroom complete,
he tackles the second
with the same hands-on approach,
handling the waterproofing, tile, and custom finishes himself.
It pays off.
Both bathrooms cost about $6,300 in materials,
roughly half the contractor quote for just one.
But upstairs, the steep walls
create one last challenge.
Alex works around them with custom glass by the bathtub
and a smaller mirror tucked beneath the slope.
After months of setbacks,
hands-on work, and problem-solving,
the cabin is finally complete.
Nine months earlier, Alex had a dream.
To transform an $80,000 half-acre plot in Idaho
into a luxurious A-frame cabin.
His first time building a house from the ground up.
Then came the reality of it.
Narrow roads, unpredictable weather,
delivery mistakes, and a race against the winter.
But somewhere between all those setbacks,
Alex's role changed.
He stopped simply knowing how to build
and started learning how to run the build.
Amigos, bien!
He managed trades, chased materials,
caught errors, and stepped in whenever he could.
And because his goal was always to sell the cabin,
every saving meant more room for a return.
Still, the numbers climbed fast.
Nearly $158,000 has gone into the land and site,
$176,000 into the structure and exterior,
$81,000 into the interior build-out,
and another $19,000 into decks and landscaping.
Well, after nine months and $527,000 later, we're finally finished.
All in, the final investment in the A-frame lands at $527,000.
$1,000.
Alex has proven he can take an entire build
from bare ground to the front door.
And after everything the project threw at him, one lesson has stuck.
Every problem, no matter how big or how small, always has a solution.
Now only one question remains.
Will the final sale make it all worth it?