We always dreamed of building a home far away from the city, deep in the untamed beauty of the wilderness. In this video series, we take you on our incredible journey of constructing our dream log house and log cabin entirely from scratch and off-grid.
Watch as we tackle every DIY challenge: from clearing the rugged land and hand-peeling massive spruce logs to raising the walls and woodworking in the middle of nature. You’ll see the reality of building in harsh weather, overcoming remote living obstacles, and the steep learning curve of this massive timber framing project—all while working together as a family.
This isn't just about construction or home remodeling; it’s a story of perseverance, learning to live off the land, and building a lasting legacy. Join us from the very first foundation post and framing to placing the final ridge beam in this complete step-by-step tutorial.
AI Generated·May contain errors
In this video, you'll see a story unfolding in the heart of Alaska.
The Miller family is building more than just a cabin. They're building a new way of life.
Joas and Priscilla, together with their five children, are embracing the challenge of
constructing their home themselves. After digging the foundation and pouring the concrete slab,
insulated concrete forms are stacked like blocks. Rebar is placed both vertically and horizontally
Once everything is in position, concrete is poured into the hollow cores,
creating a solid, well-insulated foundation. After preparing the foundation, PEX tubing is
being installed for radiant in-floor heating, carefully spacing it in multiple zones.
With the concrete slab dry and solid, they begin assembling the wall framing,
outlining the interior spaces. Once the layout is set, wooden beams are placed along the top
of the foundation walls, forming the base of the flooring system. The porch build begins by
setting concrete columns in the ground to support the deck. Floor joists are then added on top,
creating the main structure of the porch floor. Once the porch deck structure is in place,
the log building continues with the classic mortise and tenon method. Each log is carefully
prepared, with mortises cut into the ends of the logs to fit into the matching tenons
of the adjacent logs. The Miller family's Alaskan cabin build is a true labor of love and teamwork.
Joas leads the project with his wife Priscilla and their five children, especially the twins,
actively helping every step of the way, while friends offer their support and expertise.
Joas is burning the exterior sides of the logs using a technique known as charring.
This process involves applying heat to the wood, which distills out water vapor and volatile
organic compounds, cingus, from the logs. The charring creates a protective layer on the surface,
enhancing the wood's resistance to weathering, pests, and decay. The roofing beams are assembled,
followed by a spray application of polyol coating. Then, OSB panels are mounted and topped with
insulation material to seal and protect the roof. To install the internal partition wall frames,
precise cuts are made into the logs. The main cuts are guided by a laser level to ensure perfect
alignment and are done with a chainsaw. These rough cuts are then carefully refined using a
handheld cutter for an accurate fit. Once the spaces are prepped, the individual wall frames,
already pre-assembled, are lifted into place. Each frame is positioned according to the layout plan,
aligning precisely with the cuts made in the log walls. They are carefully aligned with both the
floor and ceiling, then secured using a combination of strong construction, adhesive, and heavy duty
screws. All window frames must be measured, cut, and aligned properly. Work continues inside with
installing the top plate for an interior wall. A temporary block is secured to the ceiling,
allowing the top plate to be attached. Yoas prepares the mounting base for the light fixture
by cutting it from a deck board and drilling a hole for a secure fit. Applying the third coat
of stain to the logs enhances the durability and gives a finished look. With winter fast approaching,
the Miller family begins installing the metal roof. Joas and the twins are working with sheets
of forest green metal roofing, cutting precise openings for the sun tunnel and vents. The team
is installing PEX piping for both water supply and radiant floor heating in the cabin. The team
installs window bucks using angle iron and foam gaskets to allow for log settlement while keeping
the frame secure. After sanding around the openings, they assemble and screw the bucks in place,
sealing them with insulation. Triple pane windows are installed with proper spacing for spray foam,
ensuring an airtight fit. A few windows had to be reinstalled due to upside down stickers,
but the process is completed with fiberglass insulation planned to fill remaining gaps
above the windows. Joas and Ethan are laying out the base for their fireplace, which will sit
centered beneath the chimney pipe. Joas starts creating an archway for the top part of an
interior wall, enhancing the space with a touch of character. Ethan assists his father in installing
the entrance and side doors, carefully fitting each one to ensure a secure and proper seal.
They align the doors and adjust the frames for a perfect fit, adding a beautiful finished look to
the cabin's entryways. The twins are sanding the logs inside using either hand sanders or an electric
one. Once the surface is smooth, Joas applies four coats of crystal urethane to the logs that
makes them glossy and protects the wood. The boys put in a lot of effort on this project.
It's beautiful to see how close-knit this family is, with each one supporting the other. The gaps
up top are intentional, allowing for settling as the house will gradually settle over time.
The lower level of the house includes a hall, two bedrooms, a storage room, boiler, and a heating
room. All gaps between the logs are sealed with construction foam to ensure insulation and prevent
drafts. The twins begin painting the cabin's interior about 7,000 square feet in total.
First, a tinted primer is applied to match the final color-weathered white ensuring better
coverage. Avalon joins in to help with the detailed hand painting around the windows,
where rollers can't reach. Joas is in the master bathroom preparing the walls for tiling.
He seals the gaps with mesh tape, applies mortar, and finishes with a waterproof coating for full
protection before tiling. The boys help their father level the floor with well-mixed mortar.
They secure the hardy boards in place with mortar and screws, working together to prepare a solid
base for tiling. Once the gaps are filled, the base is ready and they begin tiling. Each tile is set
with precision and pressed firmly into the mortar to create a strong, even surface. Spacers are used
throughout to maintain consistent gaps and ensure perfect alignment. Tiling improves the appearance
of surfaces and makes them easier to clean and maintain. Tiles are usually made of ceramic,
porcelain, or stone. They are commonly used in bathrooms, kitchens, and entryways. Floor tiles
are thicker and stronger, and choosing slip-resistant ones is important for safety.
Wall tiles are lighter and used where less strength is needed. After finishing the tiling,
it's time for grouting. Joas uses natural gray single-component grout that matches the tiles
perfectly. The twins and Joas begin staining the trims inside, but because of the large amount of
work, they take the trims outside to stain them using an electric spraying machine. However,
the freezing temperature causes the surface of the trims to ice over, preventing the stain
from drying. So they bring the trims back inside the house and leave them to dry for 24 hours.
Justin is painting the outer rims of the upstairs lights brown, while the ones that will be installed
downstairs will remain white. They are going to install a total of 54 lights. The switches are
now wired and also have a dimming function, allowing the lights to be adjusted to different
brightness levels. The entrance lights are wired as well, with a single switch controlling all
six lights at once. They are prepping the fireplace for stone installation. Realizing
that if the rocks go straight up, a wall switch would end up recessed behind them,
Joas builds out border frames to keep the switches flush with the final surface. They then attach
metal lath around the base and wall, cover it with mortar, and wait for them to dry. The next day,
they begin applying rocks to the sides and the entire surface of the fireplace. Each stone is
placed carefully to create a natural and cohesive look. Since some of the rocks vary slightly in
height and thickness, they need to adjust the depth of the mortar behind each piece.
This means building up the mud in certain areas to ensure the surface stays even,
and the rocks sit flush with one another. After that, Joas mounted the windowsill using both
adhesive and screws to ensure a strong, secure fit. He carefully positioned the sill in place,
making sure it was level and properly aligned with the window frame. This combination not only
provided a solid installation, but also helped prevent any future shifting or gaps. Now they are
working on decorative barn board triangles for the living room trusses. They start brainstorming
a design idea for one of the triangle panels. The shape reminds them of a mountain, so they
plan to turn it into a mountain scene using barn board. The top will be finished with white boards
to look like snow, and a strip of blue will represent a river or creek. Green barn board
will be used at the base to represent trees, and gray or brown ones will serve as rocks and dirt.
They're curious to see how the scene turns out, excited to try something creative and unique.
It's time to complete the decorative finishing works. The inner sides of the window frames are
covered with carefully cut and fitted decorative trim, adding depth and a polished appearance to
each window. This final touch enhances the aesthetic and architectural details of the interior,
creating a harmonious and inviting atmosphere throughout the home.
All the doors have been installed, and the hinges and handles are mounted. Trims are also used to
cover all the gaps between the walls and beams, giving the space a clean and finished look. Each
piece is carefully measured and fitted to ensure a seamless connection, hiding any uneven edges or
construction joints. The trims blend beautifully with the rest of the woodwork, tying together the
walls, ceilings, and beams into a unified design. Joes marks and cuts the step slots into the first
stringer of the staircase using a miter saw, with the boys helping him throughout the entire process.
The second stringer is made the same way, carefully matched to the first for consistency.
To keep the structure strong, they add wooden braces between the stringers, reinforcing both
sides and enhancing stability. Once the frame is solid, they fit the treads and risers, then anchor
the entire staircase to the upper floor. Since both sides of the stairs run along walls, no handrail
is needed. The next important step is floor moisture mitigation. First, the vacuum floor is cleaned
with acetone, and then HydroBlocka™ moisture barrier is applied. Joes decides to take one extra
precaution by applying caulking along the edge, just in case any moisture tries to come in from
the outside. With that done, he and his boys begin installing the LVP flooring. They work together
to carefully lay each plank, making sure the seams are tight. Wyatt, the youngest son of the Millers,
is attaching the handle to the door, while his older brother helps Joes install the closet doors.
It's a hands-on effort, with each of them contributing to the final touches of the home.
The inside edges of the door frames are finished with neatly cut decorative trim.
The transitions between the doorways and the LVP flooring have also been completed, creating a
smooth and consistent flow throughout the space. Floor-to-wall intersections are completed with
base trim planks, delivering a neat professional finish. Joes starts the tiling process in the
bathroom by applying mortar and setting the tiles from the bottom up, using spacers to ensure proper
alignment. He also installs a niche for the shampoo shelf, ensuring it is level. Meanwhile, boys are
preparing stones for the fireplace. For small bathrooms, light-colored tiles are recommended
to enhance the sense of space. Accent tiles, such as a bold design along a wall or in a specific area,
can add character. Once the mortar has dried, spacers are removed and grout is applied to fill
the joints. White, light gray, and soft beige tiles are preferred as they reflect light,
contributing to a more open and expansive feel in the space. The stone wall is being assembled
using Eldorado stone in the shadow rock profile. Due to the irregular shapes and varying sizes of
the stones, installation requires careful placement. After completing the stonework,
a muriatic acid wash is applied to clean the surface, followed by a thorough water rinse to
neutralize any residue. The installation continues with the placement of the wood stove and the
chimney system, completing another major step in the project. This room is being set up as a storage
space for Priscilla, where she will keep food, vegetables, and canned goods. Yoas is building
shelves to maximize the available space and ensure there's ample room for everything. He installs
horizontal ledgers along the walls for each level, then fastens cut boards in place. It's also worth
noting that the temperature in this room remains consistently low throughout the year, making it
What makes this project truly special is the way the entire family works together,
each person bringing their own hands and heart to the effort. From the early stages, the children
pitch in with enthusiasm and growing skills. It's amazing to watch a family work together as a team.
They begin assembling a cabinet, testing to see if they can figure it out on their own.
Soon they make steady progress. Avalon and Justin manage to finish assembling what becomes
the kitchen island. Even Wyatt and little Chloe are helping. Some parts are missing, but they
make do with what they have, and everything turns out just right. The kitchen space is wide and
filled with natural light. It's the perfect choice for a lively family home. Priscilla truly needs the
extra room as she prepares delicious meals for her big family, especially when Avalon and Chloe join
her, eager to help. Joas is going to make a concrete countertop that is a perfect finishing
touch to the kitchen's warm, rustic charm. He and the twins did a perfect job on every step.
It all starts with a frame made from plywood, with boards defining the edges. Rebar is added
for strength. The concrete mix is poured and left to cure for several days. Avalon is helping with
sanding. The smooth surface offers a unique, industrial feel. It is not only durable, but also shows
modern elegance. All the appliances are in the stove, fridge, and washing machine, and Priscilla
looks genuinely happy with her new kitchen space. She is applying the final coating to the wooden
countertop of the island cabinet. Joas is installing a sun tunnel, a type of skylight that uses a
reflective tube to capture and channel natural light. To add some decoration to the concrete
countertop, Joas paints random spots while Priscilla gently spreads them. Then it is applied
with the final coating. In the end, the countertop looks unique, handmade, and custom-designed with a
personal flair. Classic white brick-shaped tiles laid in a traditional subway pattern add timeless
charm to the space, making it feel more open and airy. Their clean, crisp lines bring a sense of
order and brightness, while the dark grout adds contrast and definition. Together, they give the
kitchen a fresh, polished look that ties everything together. The wooden shelves are an ideal
combination of design and functionality, adding both warmth and practical storage to the space.
All the finishing touches are complete in the kitchen, and it looks perfect, with everything
seamlessly matching in color, design, and functionality. Now it's time to work on the
concrete countertop for the bathroom cabinets. The method is the same as before, while two frames are
created for the sink installation later. Joas and the boys are adding design elements, experimenting
with both patterned and free-form styles, and creating spontaneous and unique touches.
After removing the sink frames, decorative paintings are incorporated, and once everything
is in place, the countertop is covered with a protective coating and polished to a smooth, glossy
finish. The concrete flat panels are now ready for the bathroom countertop, which will help protect
the beams from moisture. The bathroom is now fully equipped, with all the appliances successfully
installed. The family has done an amazing job, working together as a team and supporting each
other throughout the process. Joas and Priscilla lead with patience and intention, guiding their
kids not just in how to build, but in why it matters. Every wall raised and every room completed
carries the marks of their effort and love. The first floor welcomes you with a spacious,
open layout, where the heart of the home, the living room with an open kitchen, is filled
with warmth and natural light. The cozy master bedroom offers a peaceful retreat for Joas and
Priscilla, a quiet space to rest. The room is thoughtfully designed, featuring an inbuilt
wardrobe and a private master bathroom. In the basement, there is a spacious entertainment
and relaxation area, where the kids can unwind, play, and simply be themselves. Additionally,
there are storage and technical rooms. Down the hall, you'll find the bedrooms for the twins and
Wyatt, as well as a shared room for Avalon and Chloe. The Miller family has poured their hearts,
hands, and countless hours into creating a true haven nestled in the breathtaking beauty of Alaska.
If you loved this project, be sure to subscribe to our channel
and stay tuned for more exciting videos coming soon.