AI GeneratedThis video provides a comprehensive progress update on various High-Speed Rail (HSR) grade separations and infrastructure projects across Fresno. Key highlights include significant concrete pouring at Church Avenue, the demolition of the H Street bridge, paving completions at Belmont Avenue, and the installation of deck panels at Shaw Avenue.
Hey everybody, I am finally back here in the city of Fresno and expect more videos to come
just before the month ends and we begin here with the typical Fresno flyover, starting
at the Jensen Trench where this is a weekday when I filmed, prior than a weekend which
I usually do.
You can see concrete being poured for the last portion of the retaining walls just on
the northern portion of the trench before it goes up to grade level again.
But there's a lot of stuff happening at Church Avenue in particular.
What a wild month it has been here at this structure.
You can see the abutment wall on the second substructure, the far eastern one, has been
fully poured with the formwork being removed and the first abutment wall for that second
substructure, the western one, finally after months of waiting, they are finally finishing
up and a couple days ago for my members, I actually showed them tying the rebar cage
prior to them putting the panels up which you see in this video.
And also the columns needed for the second substructure is finally underway with foundation
work beginning.
This is really good news as this was halted for some time due to the fire that occurred
here in March or February of this year, but seeing them ramping up again is great.
But it's not just there.
The first substructure, you can see all of the deck panels are installed, finally, and
also the vent cap needed to connect the set of girders and columns together has been fully
poured.
A lot of stuff happening here at this structure and I cannot wait to see this done, probably
by Q1 of next year.
As for downtown Fresno next to Ventura Street, there is not much going on besides the drainage
work that I mentioned in my last video back in June which is still ongoing, I'm not
too sure how long it'll take for them to complete so they can polish up the guideway,
but only time will tell and we'll find out eventually.
One thing I want to know if someone can tell me in the comments, is HSR responsible for
the new striping that goes on between the new grade separations on G Street?
As you can see for example on Ventura, it's with the suicide lane and two lanes on each
side plus bike lanes, I'm not too sure if they're supposed to connect it all the
way through the three bridges they will have here in downtown for G Street, so if someone
can tell me in the comments why or who's responsible for that, that'd be really
nice to know.
The final grade separation in downtown Fresno has had a lot of demolition occur for specifically
the H Street bridge that once stood here separating both Fresno Street and H Street and it will
be an at-grade crossing with traffic lights in the future.
This will be the first thing they work on once the utilities have been relocated, so
they're not going to have it all closed and then open everything at once, they're
going to do it in stages just like Tulare Street and Ventura where they for example
finished the G Street bridge and then opened that to traffic while they were still building
the underpass itself.
You can see most of the H Street bridge is completely demolished now, it was some parts
still remaining last month, most of it's all gone so they can finish the utility work
and the relocation and demolition of the vault that they have for utilities, as you can see
that little box right there where it once stood.
You guys have probably saw on the news there's been fires here and two people I think passed
away here, homeless people that were staying in that vault, so it'll be really nice and
much safer here so people wouldn't have to stay in there anymore.
As for the Fresno Street grade separation that once stood here itself, you can see the
retaining walls right next to Union Pacific are being demolished which is really good
to see.
It'll be a huge makeover, I'll put a photo here on the screen of the render that they
showed me back during the community meeting in April just a couple weeks before they broke
ground.
You can see a lot of also more utility relocations here just near F Street, so only time will
tell once this all is done, I really hope it is by June as that will be very fast compared
to all the other grade separations they have done in the city and I can't wait to see this
all complete.
Belmont, Belmont, Belmont, they are finally locking in on this grade separation.
It has been open for the past year but part of it was not finished.
For example, the cul-de-sac to end the old circle that used to be here was not fully
paved, all the paving on Belmont itself was not done, and all these sidewalks weren't
even poured when they opened it to traffic which was very odd.
But they are finally locking in, you probably just saw there at the bottom where the roundabout
once stood, they're finally paving the terminating point of the cul-de-sac as well as the new
sidewalks and new paving to connect all of it together.
It has been a long time in the making, I don't know what took them so long, it's been months,
they were supposed to get it done by March I remember but I guess that was pushed back
for some odd reason.
What is really good news, as you can see right there, they are finally working on the trench
underneath Belmont Avenue with the new overcrossing.
Really good to see, I've been waiting for this for so long, and it's not just there,
just right next to Belmont Avenue, all of these side streets that have been demolished
to allow them to relocate Belmont to the north while they kept the underpass open, is finally
having active work again.
You can see the new cul-de-sac they're building next to the affordable housing the city of
Fresno completed a couple years ago, the new sidewalks, the new driveway that are going
to connect to that business district right there.
Really good stuff to see, but it's not just over there, there's even more happening here
on this workday.
You can see active excavation for the Fresno Trench just north of Belmont Avenue so they
can prep the guideway prior to them pouring concrete for the retaining walls as well as
the ramp to go even more below grade level.
Very good to see.
After waiting and waiting for them to finally relocate Golden State Boulevard to the west,
and it took them so long because there was a power line in the way, but they decided
okay, we'll open it and then we'll relocate it afterwards, which they did, but now that
it's fully relocated and everything is ready to go, the last set of column prep for McKinley
Avenue is underway.
I'm so happy to see this.
No work did not fully pause, which is great, you can see embankment work is still occurring
which was happening before they relocated GSB, and also the noise proofing retaining
wall just on the last set of columns for cars that will go below McKinley Avenue.
You can see now the drilling for those last set of columns right there, sake it drilling
as well as a crane holding up that portion before they pour the foundations.
I cannot wait to see this done, this will be a major makeover in this part of the city
and it'll be really cool to see when it's done by the end of the year.
Lots and lots of stuff has happened here at Shaw Avenue, and you're probably thinking
well, what's different?
For example, a lot of the deck panels needed for two sets of the girder spans needed for
this structure specifically for the Golden State Boulevard portion and the HSR right
of way are now installed and in place.
You're probably wondering, what about Union Pacific, the freight line that's just to the
east?
Well, since I last filmed here, I was on the Shaw Avenue bypass, which is for traffic currently
before they opened this over crossing, and no light is bleeding through anymore on that
portion.
And to confirm this even further, I actually checked satellite imagery from a couple days
ago all the way from space, and there is a new color change just like the other parts
of this structure, basically confirming all the deck panels have been installed in just
like a couple weeks.
This is really cool stuff and it really shows they're really trying to ramp this thing up.
But it's not just the embankments, as you can see a lot of people there as well on the
eastern side for MSC, you can also see brand new asphalt maybe for Golden State Boulevard.
This part was not done, which I'm not too sure why, but seeing them ramping it up is
really good to see.
However, the bypass is still in the way, but once Shaw Avenue is open, they can connect
the old thing and I bet you they are not slowing down in terms of this realignment.
Here we are at the final grade separation just north of Shaw Avenue here at the Herndon
Avenue under crossing site, where not much has happened here.
I'm not too sure what's the holdup, there's not even that many workers here as well.
I really hope this doesn't get pushed back as this is a very important under crossing
needed to connect to the future St. Joaquin River Viaduct via MSC Embankment.
But we have to keep a real close eye on this since I'm sure probably in the next month
or so it'll ramp up even further.
And on that note, I hope you guys enjoyed this video, expect more to come soon, hopefully
I can get another video of CB23 by the end of July, and on that note, I'll catch you
guys in the next one.