To celebrate our 50th anniversary, we moved and raised a 3.5 ton piece of Purbeck limestone using theorised prehistoric techniques, and it's now standing tall and proud in our Stone Age farm. 35 crew from the Royal Navy flagship HMS Queen Elizabeth joined Butser staff and volunteers to move this rock 100 ft using a wooden sled and rope, before tippin
AI Generated·May contain errors
Video Summary
AI GeneratedTo celebrate its 50th anniversary and the Festival of Archaeology, Butser conducts an experimental archaeology project to move and erect a 3.5-tonne monolith. The event explores the immense human effort and logistical challenges involved in transporting prehistoric stones, mirroring the journeys of ancient monuments like Stonehenge.
The day has finally arrived.
It's one of, for me, the biggest days on our calendar
because we are celebrating our 50th anniversary
by moving and erecting a giant monolith.
This week is also the Festival of Archaeology
and the theme of this year's festival is journeys.
So the moving of this stone really reflects the massive journeys
that these stones made thousands of years ago
but also marks the journey that Butser has made over the last 50 years.
If it comes off the rails, what could potentially happen
is that it comes and it just moves the roller
rather than getting on the roller.
And I think we need to get rid of the kinks.
And the two, that looks very fast, doesn't it?
The movement of these stones have fascinated people for hundreds of years.
There's really no evidence for how these things were moved.
We know that they were moved because geochemistry of the stones
shows that they originated in one place.
So, for example, the blue stones at Stonehenge originated in Pembrokeshire
and so the question is how on earth did they arrive in Wiltshire?
Now we've tried it on rollers with 14 people, easy peasy,
but we've got a lot more people.
If we're on rollers, the worry is that it would just get out of control.
You know, a big yank on the rope, 40, 50 people on it,
it shoots off, it's three and a half tonnes,
it's not going to stop very quickly,
even though we've got some brake ropes on the back.
But Therese would really like to just take it off the rollers,
or pull it off the rollers,
and it skids along the ground on the sledge.
And I just want to know what people's thoughts are.
All the stuff that I've read on it, and you sent me some stuff as well,
and I've read some other stuff,
is that it's easier to move it on rollers,
but it's less controllable.
That's the overriding message that I got.
And so I think we've got to go with how we feel safest.
There have been lots of experiments in the past,
and some of the earliest ones were conducted in the 1950s
by a guy called Richard Atkinson,
and he tried to move a replica bluestone from Stonehenge,
and had varying success.
So people have tried things like rollers,
greased slipways, ball bearings,
all sorts of contraptions,
and still we really have no idea how it was actually done.
This is a bit of the unknown,
is that we hit the log with the skids.
If the sled stops here,
the front of the stone would probably be across the front there.
No, no, no.
If the sled stopped here,
the front of the stone would be back here.
Because you've nearly got to slide the stone off,
and the hope is that as you slide it and it gets to this point,
it tips into the hole.
For whatever reason, we have got the calculation,
there's no calculation, that we've got it wrong,
and it tips around too far back into here,
then half of it ends up smashing down that front,
and then we don't sit in our hole properly.
Where was the tipping point of that stone?
I don't know.
That's the tricky thing,
and I think that's in the other examples that have been tried,
they've often these replicas that they make
so they can calculate exactly the centre of gravity,
but we've got a rough cut stone,
so it's much more difficult.
It's going to be fine, guys, it really is.
It's going to be great, looking forward to it.
It's time tomorrow, we'll have a stone.
I know.
We've come from HMS Queen Elizabeth.
We'd like to find opportunities to get engaged with community projects,
and it seemed like a good opportunity to come along here
to celebrate Butser's 50th anniversary.
I think some of them are a bit apprehensive,
but they'll all lean in and give their best,
so I have no doubt.
Doesn't look like there's free puns.
Maybe we'll take turns with it.
Look, not to me it doesn't.
My question is, are we carrying it with the lady on?
Don't give them ideas.
What if it falls off those rollers?
What are you going to do then?
Anyway, it's free enough, Tom, we can lift it.
You reckon?
Yeah, no problem.
I want to know how we're going to get round the corners as well.
We're not, we're going straight through that bush.
Kiss those bushes goodbye, because they're dead.
Right, everybody.
Anybody that's involved in the moving of this stone,
can you come a little bit closer for us, please?
We're heading over towards that hole over there.
I've marked some yellow lines,
so we can try and centralise the rock,
keeping the dead centre, following these lines,
and the sled eventually hits that log.
You guys ready?
OK, you've got three, two, one, pull!
OK, let's stop there.
It's not a quick yank,
I just want to start leaning into the rope,
start bringing up the power.
OK, guys, what I'm going to do is see how that works
by giving it another pull,
but we're going to go on the ground regardless now.
One, two, three, pull!
OK, let's get some more power on there.
Three, two, one, pull!
Keep it going, guys, watch your footing.
OK, let's get some leaning on the go, I think.
On three, then.
Three, two, one, pull!
So anybody with any good ideas
to get this shunted over that way a little bit more?
Only pull this rope, OK.
OK, sounds like a good idea.
We can get a dozen people down this side.
We're only going to pull the one rope
to see if we can line this up a bit more.
You guys ready?
We've literally got about two foot to pull.
How are you guys feeling?
OK, three, two, one, let's pull!
Let's pull!
Come on.
Pull!
Up to the log.
OK, this won't go any further.
The idea now is to get this rock off that sled
and into that hole.
We're going to just wet this wood.
Three, two, one, and a pull!
Three, two, one, keep going!
Yeah!
Next stage.
What we've done where we've overshot a bit
is that that needs to be dug out, doesn't it?
Guys, we need a few hands just to bring the A-frame down.
We've got the main pulling rope
that's going to come over an A-frame.
Richard is just bringing it over now.
That kind of brings the lift downwards,
down to the stone,
rather than doing it that way,
which is going to be difficult.
It's going to be down.
It's going to then come up upright.
We're going to need four people
to help us stand this A-frame up
so the rope comes down directly onto the stone.
So when we pull, it comes upright.
That's the plan.
Ready?
One, two, three.
Just make sure you give them some slack.
Give them some slack.
We want to be gentle.
If we overshoot,
it's going to come flying back towards you guys
and you're going to need to take the strain from me
to make sure it doesn't go right over.
Okay, guys.
On three, two, one, pull.
Stop, stop, stop, stop.
You guys are going to go into the paddock
over that fence.
You guys are going to come over onto this
and be putting it in the runway here.
Guys, are you ready?
Three, two, one, a big pull.
Keep the tension up, keep the tension up.
Let's do this, guys.
Three, two, one, pull.
Pull, pull, pull, pull, pull, pull, pull.
More people down here.
We need to pack properly,
we need to get stanchions in,
we need to get uprights to the rock.
Those logs behind you,
let's get them into the rock.
We want to be putting stuff in like this.
Yeah.
Yeah, I think that's looking pretty,
that's pretty good actually.
I'm happy with that.
It really is testament to the significant
people power that people had in the past
when they came together to do these jobs.
This is a three and a half tonne stone.
Big sarsen stones at Stonehenge
are between 20 and 40 tonnes,
which I can't even fathom in my head.
So the number of people and the effort
and the organisation that must have
gone onto them is just incredible
and this kind of experiment really
makes you appreciate that even more.
I am absolutely knackered.
It's finally there.
My heart has been racing about
a thousand miles an hour,
but I feel so, so happy, relieved
and that was just an immense achievement
for our 50th anniversary.
It's brilliant.