How Did Engineers Build a Massive Tunnel and Install a Hydroelectric System Inside the Alps?

Hightech Road Bridge
22 followers
Deep 600 meters beneath the solid rock of the Alps,
thousands of workers are racing against time to complete a massive
pumped storage hydroelectric mega project,
LIMERN. They have to work continuously in three shifts
every day in an enclosed low light and heavily dusty environment. The biggest
challenge is having to constantly reinforce the rock walls
to withstand immense geological pressure,
deal with the risk of cave-ins from all sides,
and find a way to transport machines weighing hundreds of tons
to an altitude of thousands of meters in a terrain with
absolutely no roads. So how did the engineers do it? Let's find out in detail
right now. But before getting into the video,
don't forget to hit the like button and share this video to spread it to more
viewers. And now, let's get started. The core
purpose of this massive complex is to create a natural battery to
regulate the power grid. The operating principle is based on
circulating water between two reservoirs, Lake LIMERN in the valley
below and Lake Mütze, located at an altitude
of 2,474 meters. When electricity demand is low, the
system pumps water back up to the top of the mountain.
When electricity is urgently needed, the water stream will be discharged
steeply downwards, generating a power output of up to 1,000
megawatts. However, the most difficult problem is
how to connect these two lakes. With vertical cliff terrain and freezing
temperatures in winter, laying pipes on the surface is
impossible. The only solution is to drill right
through the core of the mountain. To do this, the volume of work is
absolutely enormous. The workers must drill, blast, and clear
out about 800,000 cubic meters of hard rock from
the mountain. This massive empty space is exactly
where they will build the entire underground tunnel network,
including two vertical pressure shafts and a vast
central cavern to house the power plant. To create the massive underground space
inside the mountain, the tunneling work is divided into two
separate categories, requiring engineers to apply specialized
construction methods. The first category is the cavern, the
central cavern housing the power plant, which is the
size of a 15-story building, 150 meters long,
30 meters wide, and 53 meters high. Here they applied the controlled delayed
blasting technique combined with the NATM tunneling principle.
The process takes place in a closed loop. First, jumbo multi-boom tunneling
machines enter the tunnel face, drilling dozens of
deep holes into the rock face, according to a computer-guided layout.
Explosives and delay detonators are loaded into them.
When activated, the explosive clusters detonate
milliseconds apart. This technique helps break the rock mass
exactly to the design profile, while simultaneously
neutralizing the shock waves to prevent fracturing the mountain structure.
As soon as the ventilation system sucks out the smoke and dust,
excavators and bulldozers immediately move in to clear
thousands of tons of rock and soil. At the same time, a continuous
reinforcement process is activated so the rock face
is not left exposed. Engineers quickly inspect and treat the surface,
welded wire mesh is immediately attached to the tunnel wall,
closely followed by robotic arms spraying a high-pressure
concrete layer, shotcrete, covering the entire structure.
Finally, thousands of steel rock bolts are drilled deep through the concrete
layer and right into the geological stratum.
This outer shell compresses the geological faults,
utilizing the very stress of the surrounding rock to turn the mountain
into a massive self-supporting arch structure.
The second category is the construction of two pressure water tunnels
connecting Lake Mütze down to the plant. With a steep incline of 40 degrees,
the conventional blasting method cannot suffice.
The solution devised is using a specialized 140 meter long
TBM tunnel boring machine. This machine operates on a bottom-up
reverse excavation mechanism. The massive cutter head with ultra-hard
alloy disks continuously crushes the rock face.
The thousands of tons of debris generated are not transported by trucks,
but discharged directly down a hopper system by gravity
and taken out by a conveyor belt at the base of the tunnel.
As the TBM advances, the tunnel walls are immediately reinforced
with high-strength H-beam steel rings, preparing for the pressure-bearing steel
lining step. Throughout the construction process of
both these categories, the greatest risk always lurking is the
high-pressure groundwater system. At depths of hundreds of meters,
water continuously erupts from geological faults.
If left uncontrolled, they can break the sprayed concrete structure
and submerge the entire construction site. The conventional method is to drill
probe holes and pump high-pressure cement grout
deep into the rock face to seal the underground veins.
However, at the Limmern project, the pressure and flow rate of the groundwater
are so strong that it easily breaks apart and
washes away the conventional cement grout layer
before it can set. To solve this problem,
engineers were forced to add specialized polymer-based compounds
to the pumping grout mixture. When in contact with water,
this polymer chemical creates an instant reaction,
expanding its volume manifold and hardening
almost immediately in just a few seconds. This chemical glue layer forms a perfect
plug, completely sealing all leaking cracks,
isolating groundwater from the construction area.
Another interesting point about this project is that all
800,000 cubic meters of excavated rock from the underground tunnel system are
maximally utilized. Instead of being transported away for
disposal, they are brought directly into the high-capacity crushing plant system
to be used as the core material for pouring concrete
to build the Mütze Megadam at the top of the mountain.
Returning to the underground system, after the drilling and excavation work
is finished, the entirety of the two water tunnels
will be lined with steel pipes to withstand the massive hydrodynamic
pressure from the 600 meter high water column.
Hundreds of super heavy steel pipe sections, each weighing 30 to 40 tons,
are slowly lowered by a cable winch system down along the 40 degree inclined
tunnel. After being welded into place, the gap
between the steel pipe shell and the rock face will be backfilled
with concrete. This technique helps lock the pipeline
tightly, forcing the natural rock mass to share
the pressure with the steel shell. At the same time, inside the central
cavern, another massive construction site is
taking place to prepare for the mechanical
installation phase. Looking at the actual construction
footage, we will see thousands of workers weaving
giant steel cage systems and continuously pouring solid concrete
blocks. In reality, the giant cavern after
excavation is just an empty space. To have room to place the four pump
turbine units, the engineers had to build an entire
multi-story reinforced concrete plant structure
right inside the mountain. This massive volume of rebar and concrete serves two
utterly important duties. First, it creates the mold to encase the
steel spiral casings, where the high pressure water stream will
rush in. Second, and most importantly, it acts as a
super dense foundation block. This concrete foundation is tasked with
anchoring the entire mechanical system, weighing thousands of tons, and absorbing
all the horrific vibrations when the turbines spin at high speeds.
Only when these concrete foundation blocks have set
and reached sufficient load-bearing strength can the final core phase begin,
transporting and assembling the massive machines into position.
But how to transport these super heavy and oversized machines
deep into the mountain when the construction area
has absolutely no access roads? To solve this problem,
the engineers established a combined logistics system,
utilizing a giant outdoor aerial cableway
traversing the slopes of the Alps, connecting with an underground funicular
railway system with a payload of over 200 tons
piercing straight into the heart of the mountain.
Every single giant component, such as spiral casings or transformers,
is loaded onto this system and inches meter by meter
into the central cavern. Once the challenge of transporting the ultra
heavy equipment was solved, engineers immediately began the assembly
process. Inside the central cavern, the four
hydroelectric units were assembled from the bottom up
using an overhead gantry crane system. Located at the lowest level are the
massive spiral casings. These are welded directly to the pen
stocks and completely encased in concrete to bear the load.
Directly above this, the crane system lowers the turbine runner
and installs the vertical driveshaft. With the turbine section complete,
they face the ultimate technical challenge, assembling the generator unit.
The crane must lift the massive rotor weighing over 330 tons
and slowly lower it inside the stationary stator ring.
The clearance between these two components is measured in mere
millimeters, requiring absolute precision to avoid
damaging the magnetic structure. Finally, the generated electricity is
stepped up to 380 kilovolts by transformers to be integrated into
the national power grid. Once the entire system is ready, the
water valves are opened. The tremendous kinetic energy of the
rushing water can push the plant's capacity to 1,000 megawatts,
equivalent to a large-scale nuclear reactor.
Unlike thermal power plants that take hours to start up,
Limmern can reach this maximum capacity from a standstill
in under three minutes. The facility acts as a rapid response
backup power center, ready to instantly discharge electricity
to compensate the European grid whenever wind
or solar energy generation drops. The Linth-Limmern hydroelectric plant is
a practical engineering solution for energy storage. This massive
underground facility provides mandatory stability for the power grid,
especially as renewable energy sources become more common.
Which construction phase of this project impressed you the most?
Leave a comment below. Do not forget to like,
subscribe, and turn on notifications to watch more analytical videos
on engineering megaprojects. Thank you for watching
and see you next time!