We Built a Sauna from an Old Shipping Container

Design & DIY
11 followers
73 Video Views·Mar 5, 2026
We once buried two containers underground... Now it's time to breathe life into them! In this episode, we build a real hobbit house right in the ground. Mysterious? Perhaps. But the video will make it all clear 😉
Watch until the end and get inspired!
Not so long ago, we released the final episode about the Hobbit house.
Let's enjoy these shots once again.
Yes, this is the finale about the facade and the landscaping of the surrounding area,
after which many questions arose.
What's inside?
And over the next episodes, we'll answer those questions.
First of all, I suggest we start by figuring out the layout.
Let me remind you that the foundation consists of two shipping containers buried underground
and schematically it looks like this.
Since we finished the facade in the summer and fall,
we'll be working on the interior during the winter.
The first large room is the relaxation room.
Next to it is the entrance to the shower and beyond that, the steam room.
And since we're building a Hobbit house,
all the interior finishing will be inspired by the trilogy as well.
In the end, we came up with a design and honestly,
I thought it would be impossible to bring it to life.
So, the project has been approved and we're getting started on making it a reality.
And here's a little spoiler.
This project was filmed over the past four months and we've gathered a lot of footage,
which we've split into two episodes.
The next second episode will be released in a couple of days.
Enjoy watching.
Throughout the video, you'll often see shots with the facade still unfinished,
since many of the works were done in parallel.
Please don't pay attention to that.
As you remember, in the 3D model we have separate rooms,
but in reality, we have one large container without any partitions.
And to turn the virtual 3D model into something tangible,
OSB boards and wooden beams work perfectly.
We cut them to size and build the walls and floor of the future steam room.
The next step is to lay insulation in the foundation.
I think it's hard not to notice that the beams lying on the floor have a steep slope.
Yes, that's necessary in order to level the floor.
Since the container is installed at a slight angle,
and unfortunately it's no longer possible to fix that,
but it's much easier to trim the beams, so that's what we did.
As a result, we laid the insulation,
We decided to make the main partition out of metal, or rather its frame.
This frame will also serve as reinforcement and support for the roof,
onto which we poured a couple of tons of soil.
And on the walls, we're installing a wooden lathing,
which we'll insulate and cover later, but more on that in due course.
In the project, we have a lot of lighting, and it's zoned.
You need to take care of this before the insulation.
That's why we're laying the wiring and other utilities now.
Right at this stage, next we build the frame before covering everything up.
And while the guys are building the future steam room,
I'm not wasting any time either, and am ordering everything we need.
I don't know, maybe it's already a bit of professional bias,
but in such cases I always turn to companies I follow on YouTube.
And this case is no exception.
I've been subscribed to the Banyam YouTube channel for a long time,
and I really enjoy watching their work.
So I didn't think twice, and reached out to their store, Banyam.ru.
I described our space and requirements to the manager,
and immediately received a list of the necessary equipment.
It's no coincidence, they have 5 stars on every platform.
We add everything we need to the cart, and wait for delivery.
As you can see, how about the delivery?
They've got that covered too,
and we're happy as we carry the first pieces of the future bathhouse.
I think our regular viewers know that we have an unconventional approach,
and often come up with something new.
And this steam room is no exception.
In fact, we spent a long time thinking about what we could invent here,
when it seems like everything has already been invented.
But after we decided to make a bas-relief,
and add an insert of Himalayan salt blocks,
the solution came to us naturally.
As you can see, we've ordered more than just one salt brick.
And to get ahead of myself a bit,
yes, we are going to mill a bas-relief out of salt.
And as far as I know, no one has done this before.
But let's take it step by step.
Since we've received everything we need for the bathhouse,
we're working on installing it all.
The first thing we need to do is build the chimney and the ventilation.
To do this, we remove a small layer of sand from the roof of the container.
This is where the pipes will be located.
After we've decided on the installation spot and prepared it,
we cut an opening and install the first pipe.
This is a regular ventilation pipe that will come out of the shower room.
While the weather is still good,
we decided to keep going and install the chimney pipe.
But to do this, we need to figure out where the stove will be located.
So, we're unpacking it now.
In the end, we chose this beauty.
Promethal Atmosphere M with a stone basket.
This is an ultra-compact sauna stove model.
Its casing is made in the form of a stainless steel mesh
and is completely filled with natural stones,
providing rapid heating of the steam room.
Yes, it's small but very reliable.
And considering that our room is also small,
it's the perfect choice, which we confidently recommend.
It's just perfect for small private steam rooms
and will serve its owner for many years.
The next step is installing the stove.
What's the idea here?
The firebox itself will be located in the relaxation room
while the main part of the stove will be in the steam room,
following the standard layout.
To do this, we cut a through hole and fit the stove in place.
After we've decided on the stove's location,
we move on to installing the chimney.
Our chimney is not a simple one either.
It's one of the best options on the market.
The Ferrum GS series.
This is a complex multi-component chimney.
The insulated elements are designed to vent flue gases
through unheated straight sections of the chimney.
The inner liner is made of stainless steel, 0.5 mm thick.
The insulation is made of basalt wool.
This helps minimize condensation
and promotes a rapid heating of the chimney channel,
allowing the system to reach operating mode quickly.
Cold-formed socket connections with perfect geometry and gas tightness.
Laser butt welding ensures a thin and durable seam.
This significantly increases the service life.
Operating temperature up to 450 degrees.
We tried it on, and now we're heading outside to do the same installation.
But for that, we need to remove a bit more soil.
After an hour of work, the site is ready,
the hole is cut, and we can install the chimney.
First, we check if everything fits and connects properly.
And as you can see, are there any problems with that?
No.
That means we can secure the result.
First, we reinforce the metal.
To do this, we welded a metal ring and constructed it.
Here are these vertical supports,
which we decided to reinforce even further since the pipe is very tall.
And that definitely won't hurt.
And since we're already on the roof with the welding equipment,
we take the opportunity to work on two more ventilation pipes.
Here we're doing something similar.
A metal frame structure which we additionally insulate for extra protection,
since this is the highest point and the ground in this area could potentially freeze up to it.
We perform exactly the same procedure with the neighboring pipe.
We seal everything thoroughly and install a sealing collar for complete air tightness.
After all the pipes were finished and installed,
we set about thoroughly insulating the joint between the two containers.
In the end, we decided to play it safe and create a couple of layers of protection.
We talked about this in more detail in the previous episode.
And now, let's recall what the roof looks like at the moment.
But unfortunately, inside the steam room, things still don't look as nice as they do outside.
Let's go back there.
And now we're heading one level down to finally build the frame and cover the walls.
After we finished with the wooden battens, we decided to reinforce them with a metal frame.
Now our task is to finish the opening where the stove will be installed.
As a result, we welded a frame along the container wall to create a rigid structure.
And then we made something like a metal tunnel where the stove will be installed.
And now everything is clear and easy to see.
We're doing our first test to see if there's a draft.
There is a draft, which means we can move on.
Next, we have the delivery of Cement Bonded Particle Boards, CBPB.
So, what are these and why do we need so many of these boards?
CBPB stands for Cement Bonded Particle Board, which is a sheet building material like this.
It is made from a mixture of cement, wood shavings and mineral additives,
all bound together with water.
So essentially, we have a board with the strength of cement,
the eco-friendliness and ease of working with wood,
and at the same time, it is highly moisture resistant, fire resistant and durable.
CBPB is mainly used for interior and exterior finishing,
as well as for permanent formwork, as a base for floors or roofs,
or for creating partitions and structures.
And in fact, that's exactly how we used it in the previous episode when we covered the facade.
And in this episode, we'll use it for interior finishing.
We cut it to size, brought it into the future steam room and started fitting it on site.
The next step is to apply construction adhesive
and carefully lay the board onto the OSB base, securing it with screws.
Then we now do the same thing with the second sheet.
Finally, we install a small pedestal, which is exactly where the stove will be placed.
The next step is to make a border, since this will be a steam room.
And obviously, water will be spilled here.
Plus, cleaning is much easier with this kind of edge.
So we installed strips of CBPB, filled the inside with foam
and thoroughly primed the entire structure.
Next, we take waterproofing material and coat all the joints, then reinforce them.
I'm sure this won't be unnecessary.
The next day, once the primer and waterproofing had dried well, everything was ready for tiling.
Let's watch how that's done.
Here, everything follows the standard procedure.
A bucket of adhesive, one trowel and two steady hands.
And then comes a process you could watch forever.
In fact, generally speaking, with experience, tiling is a relatively quick process,
as long as the tiles are laid without fitting or cutting.
But sooner or later, you still have to pick up the angle grinder
and then the process doesn't go as fast as you'd like.
But we only need to carefully trim just a couple of tiles
and also cut a square-shaped hole in one of them, to neatly frame the drain.
And after just a few passes with the angle grinder,
we have the missing pieces and can wrap up this process.
The next day, once the adhesive had dried, we started the insulation work.
As you might have guessed, we bought this insulation and all the other components from Banyam.
Having worked with them, we definitely give them a big thumbs up
and can confidently recommend them.
First of all, everything you need is available on one website.
You won't have to search for and order components from different stores.
Secondly, they are true professionals at what they do.
And thirdly, everything is fast and precise.
So if you're thinking about building a sauna, Banyam is the place to go.
Once the insulation is evenly laid inside the wall, you can start covering it up.
For this, we take the cement-bonded particle board we've come to love and fasten it to the frame.
Then we try fitting the stove again
and realize that it's easier to decorate the wall before installing it.
So that's exactly what we'll do.
But first, primer.
What's the idea here?
We decided to clad the corner of the wall where the stove will stand with natural stone.
To make sure it holds securely, we mark out and attach a metal mesh.
I know that many skilled craftsmen are watching us
as well as those who are just thinking about starting to make things with their own hands.
And especially for you, we've developed this kit.
This is a kit for creating your very first resin and wood project.
Everything here is thought out in advance
and it's suitable for both professionals and complete beginners.
By ordering this kit, you'll have no trouble making a table like this yourself,
which by the way, makes a great New Year's gift.
And if you've never worked with wood and resin before, that's not a problem.
The kit comes with a detailed video tutorial that will help you create something this beautiful,
even if you've never worked with wood and resin before.
So, we've thought of everything and included it all.
The necessary mold for the formwork, the edge and of course the ready-made table base
are all included right now.
By following the link in the description, you can contact a manager,
choose a unique blank from the catalogue,
and start your journey in this craft for just 19,000 roubles.
The number of these kits is limited and there won't be any more.
This is a one-time offer, so hurry up.
The link is in the description.
The next step outside, we decided to model our wall in order to lay out the arrangement.
So, we're going to cover the corner behind the stove with natural stone.
We bought these beautiful pieces.
The process isn't the fastest, it's long and painstaking,
with a lot of fitting and selection.
But it will look great, which is why we chose stone.
Next comes the long monotonous process of fitting and shaping the decor.
On the OSB board, we drew clear outlines of the wall and marked the spot where the stove will join.
Now we need to do a dry run of cladding the OSB sheet
and only then number the pieces and transfer this layout into the steam room.
As a result, just the fitting and dry laying took a whole day,
constantly rearranging and trimming the stones.
The next day, when we were completely satisfied with the arrangement,
it needed to be transferred into the steam room.
But before bringing dirty dusty stones into a clean room, we decided to wash them thoroughly.
But the actual laying took us much more time.
The thing is, you can't lay such large and heavy stones all at once like you would with tiles.
It's all because of their weight and size.
First, you need to glue the first layer and then wait for it to set.
And so step by step.
In some places, we added supports in the form of screws,
but in any case, before laying the next layer, these screws need to be removed.
All in all, it's not an easy process at all, but it's worth it.
Just look at how beautiful it turns out.
Actually, I really don't like it.
Artificial materials, and if we need stone, we always try to use real stone, not a substitute.
But jumping ahead, I'll say that in the next room, we still had to go against our principles.
The thing is, there will be a shower room next to the steam room.
And, as planned, we want to make it with huge stone walls.
And create the feeling that the room is carved out of a rock.
And that's where we'll be making a stone imitation.
But on that in the next episode.
In this episode, we're working on the steam room.
But that's not all.
It will take another two days just to finish the joints between the stones.
I suggest we don't waste your time on that.
Just take my word for it.
After finishing the joints between the stones,
all that's left is to tidy up the joints between the tiles.
This part is much simpler.
First, thoroughly clean out any debris and dust.
Next, prepare the grout and methodically fill each joint one by one.
And now, finally, we can install the stove for good and not move it anymore.
This is done quickly and easily,
since we had already fitted everything precisely and tried it a couple of times.
Before finally securing the pipe,
you need to install the protective screen.
We cut out the opening and installed it in its proper place.
So we bought stones for our stove, for the sauna.
But there's one small detail.
They need to be washed.
And since we washed the stones for the wall that we glued on with a hose,
it took a long time.
And in the end, the quality wasn't what we wanted.
We bought this washer from the company Elitech.
It looks very solid.
You can tell it's from a professional line.
Everything is sturdy and high quality with good fittings.
And it's quite heavy too.
So now we're going to test it.
But for some reason, I really believe in it.
And what was new for us is that the set comes with these kinds of nozzles.
Each one has the spray angle written on it.
And just by changing these nozzles, you can improve or put on, for example,
this one, which is just for rinsing something off.
It's a really cool and really interesting thing.
And this washer is another discovery.
It's been half a year since then, and we can confidently say that this is an excellent device.
For its price, there are simply no equivalents to this washer.
We highly recommend it.
In just 20 minutes, we washed all the stones, and the next step is to place them in the stove.
The next step is to insulate the ceiling and walls,
since we've already finished installing all the utilities and set up the chimney outlet.
Here, the same non-combustible insulation is used,
but a spray-on insulation was applied directly to the metal wall of the container.
This is done to prevent the formation of a dew point,
and then the required thickness is achieved with the insulation you see on the screen.
We lay it out and secure it with cord.
Since this is a steam room, we need to achieve 100% vapor barrier.
For this, we use this thick foil, which we cut to size and immediately cover the ceiling with it.
Finally, we seal the joints and staple marks with foil tape, and the ceiling is done.
But before covering the walls, we decided to also install a decorative layer on the ceiling.
We open our project and realize that for this purpose, we need trimmed thermo-treated boards.
And of course, we have those on hand.
Right now, we're at our production facility and warehouse,
where we actually prepare materials for our projects.
As a result, we selected all the material for the entire steam room at once.
And of course, there will be something exclusive here as well.
For the bench project, we could have glued two slabs of wood together,
but instead, we have this absolute beauty right here,
which is almost 200 millimeters thick.
This was actually our drying experiment.
We decided to dry and thermo-treat a slab of this thickness.
And now at last, its time has come.
It fits the bench absolutely perfectly, just as it was always meant to do.
A few hours later, based on the project, we selected the necessary materials,
loaded them into the car, and headed out to the farmstead.
Now our task is to cover the ceiling with wood.
To do this, the first step is to build another batten,
and then we'll attach the decorative thermo-treated boards to it.
To quickly and precisely cut the boards to size, we take a quick and precise saw.
As you may have noticed, at the farmstead,
we've mostly switched to Elitec tools here and can confidently recommend them.
Right now, our task is to cover the entire ceiling and only then move on to the walls.
And that's exactly the order it should be done in.
After installing all the decorative elements, you'll understand why it has to be this way.
Once we've finished covering the ceiling, we can move on to the walls.
But first, insulation.
Here, we're once again using spray-on insulation.
And this is the only right solution if we're talking about insulating a shipping container.
And let me remind you, it's the containers themselves that make up our Hobbit house.
If you insulate these walls using the traditional method,
meaning laying insulation sheets, there will inevitably be gaps.
And that's where condensation, or the dew point, will form.
But tightly adhering spray-on insulation solves this problem.
So that's exactly what we do.
But considering that our containers are buried underground,
the insulation requirements for them are a bit lower,
since there won't be sub-zero temperatures on the other side of the wall.
We've finished working with our insulation.
We tried out about four different manufacturers.
You can actually tell just by looking at the color.
However, we were still curious,
especially since we have a significant amount of insulation work ahead for the rest of the containers.
It was extremely important for us to clearly understand exactly what is what.
Now, we're waiting for all of this to dry completely.
We trim off the excess and start installing the foil, just like we did on the ceiling.
And we also need to do the same with the walls.
After that, we do exactly the same work as we did with the ceiling.
First, we cut the foil to size and methodically cover the walls sheet by sheet,
sealing the seams with metal tape.
In the end, we need to create a so-called thermos,
and only the wires powering the lighting should stick out of it.
We took care of that in advance.
And now, after half a day of work, everything is ready.
The next step is to build another framework.
In the end, this is what we will use to attach all the decorative panels and shelves.
It's all very straightforward here.
We use pine beams, which we attach vertically and evenly spaced from each other.
So, since we have the framework, it means we can attach something to it.
And the first, you could say, fundamental piece of the puzzle is the shelves.
As you remember at the warehouse, we picked out a lot of material,
and among it was this huge blank.
After calibrating it, the next step is to cut it to size.
As a result from this one huge slab,
we need to make corner shelves for the steam room,
which means marking it out and cutting it in half.
Also, one side that will be against the wall needs to be cut straight,
while the other, opposite side, will leave with its natural edge.
That's how the shelves will look.
By the way, it's a funny name.
I googled it, and I realized that the name actually comes from the word floor,
since these structures are typically placed above the floor level,
and are specifically meant for people to comfortably sit while enjoying the bath house.
So we've brought our little ones.
They are heavy.
Seriously heavy.
And now we need to somehow carry all this stuff over there.
Getting it through this door isn't a problem,
but further on, there will be some challenges.
As you might have guessed, this is the first of two episodes for this project,
and unfortunately, the toughest challenges were waiting for us in the second part.
But at that moment, we had no idea about that yet,
and it seemed like the hardest part would be just delivering these little ones.
But as they say, the eyes are afraid, but the hands do the work.
And that approach worked this time as well.
In the end, after an hour, these giant shelves were installed
and we had our first test of the steam room.
We decided to fire up the stove to carefully burn off the transport oil.
Our stove is made of sturdy cast iron,
and it's coated with this protective oil to prevent corrosion and similar issues.
So, during the very first firing,
this oil layer burns off and gives off noticeable fumes.
Be sure to check your subscription and the notification bell,
as in a couple of days, the second and final episode will be released.
Thank you for watching and may your axe stay sharp.
