Longtime viewers will know that I have been constructing Phase 2 of my O and O27 gauge model train layout. Here is the final piece of benchwork - a drop-leaf hatch to allow access to the center of the layout with a duck-under. Enjoy!
**As an Amazon Associate and a member of other affiliate networks, We may receive commissions on qualifying sales generated from the links on this channel.***
Toy Train Tips And Tricks is a channel devoted to the operation, repair, history, and collecting of classic 3-rail O and O27 gauge trains made by Lionel, Marx, K-Line, Menards, and other manufacturers.
And hello again! This is Mike with another episode of Toy Train Tips and Tricks and I'm
standing here next to the layout today because it is time, it is finally time, to complete
the last bit of bench work for the new phase two of my layout. So phase one, the stuff that you've
seen on all of the videos so far, is over on this side. Phase two with the new staging yard
and elevated lines is over on this side. And what we have to do with this project is we are going
to close the gap. Now I could just put wood across and a table across just like normal,
but my back is not what it was when I was in my 20s and ducking underneath this to get to the
middle of the layout. That's just not going to happen. So for bridging the gap we have a couple
of options. We could do a lift up section but I have a rather low basement ceiling to deal with
so that's not the best idea. I could do a hinged folding out section like a door
but I want to have a three-foot aisleway and with the double track we're talking probably 12 to 18
inches. By the time we add that to my aisleway it's getting a little bit narrow. So that's not
really a good option here either. So that leaves us with option number three, a drop leaf section
and that's what I'm going to do here. Now I had a drop leaf on a previous layout. It worked very
well but I'm going to tweak the idea a little bit with this one. Now the one thing I did right with
the previous drop leaf was that I was smart enough I built all of the bench work all at the same time
including the section that went across and so all I had to do was cut the two sides and everything
fit perfectly and it was ready to go. Well this time I have been building in sections and so
phase one was completed about three years ago and I was slowly adding the back side of phase two.
Just recently completed this top side of phase two and since I have been using the floor as a constant
it's a concrete floor and it's not perfectly level. I'm actually off it's about half an inch.
It may look different on the camera but I actually measured it's about a half inch higher
on this side than on this side. So I'm going to have to do a little bit of finagling in order to
make this fit. The first step, the very important step, is to make sure that each side, this side
and this side, from left to right, left to right, are level. So you have to do any shimming or anything
with that. Make sure that this side is level. Make sure that this side is level with itself.
If it's not level across this way, which this isn't, like I said it's off about half an inch,
that's okay. We can fix that in the lift out section with a little bit of a grade.
The next key to the drop leaf design is going to be this piano hinge. Now you might think if I just
put my board here and attached it with my hinge that everything would be a-okay. But physics doesn't
exactly work like that. And so we have to play around with the geometry a little bit. And if
you'll notice on draw bridges, for example, there's always a fulcrum point that is either significantly
above or below the bridge to do the swinging. And that helps with the geometry to accommodate
for depth. So what I mean by that is when I have my board across, instead of attaching the hinge here
or even here, it's going to come down a little bit with the board here. And the hinge will actually
be here. And that is going to help the geometry as it comes up and slides into place. So the piano
hinge is the first important tool. Then to keep everything in place and to keep it in alignment
when it is in place, barrel bolts. So these are going to go in here and lock everything in place
so that the track is perfectly aligned every time it is up. So we don't have to worry about any
sagging. We don't have to worry about any left or right. And these are also strong enough to support
all of the weight of the drop leaf itself. So let's get started. First, I clamped a 2x3 board
of the desired length to the existing bench work on each side of the gap. Note that I clamped them,
no screws yet. Then I checked them each for level. In my scrap pile, I found a leftover
board from my previous layout that happened to be exactly the right width for this project.
I just needed to cut it to length to fit my gap. After marking the spot, I cut the board with my
circular saw and checked the fit. The next task was to attach the piano hinge. We just test to make
sure that we have clearance here on the hinge. Now if it's slightly askew, don't worry about that.
That will be fixed as we go. One other thing I remembered as I was assembling this, the included
screws are pretty underwhelming. And I remember when I did this on my previous layout, I ended up
replacing these with longer wood screws. But once this is in, you can always do that later. Just replace
one screw at a time with some more robust hardware. So now I'm going to attach this
to my hinge section and make sure that everything fits. The hinge worked well, but the fit was a
little off the end with my oscillating tool. When I was satisfied with the fit, I screwed the
remaining support piece on the open end. Then I clamped the leaf in place and installed the barrel
bolts. And it worked! Next, I added a coat of Rust-Oleum Camouflage Deep Forest Green paint
to the gate so that it would match the rest of the layout. And while the paint was drying,
I made a few modifications. One, I added an extra support underneath to keep the piece from sagging
in the middle. And I also took that opportunity as a time to replace the little screws that came
with the hinge with these nice one inch wood screws. Now, after the paint has dried and these
changes, we're ready to lay some track. I'd like to pause a moment and ask that if you're enjoying
the video so far, please like it, share it, and subscribe to the channel so that YouTube knows
that you like this type of content. And you may even consider supporting the channel financially
through a membership. Membership have access to exclusive video content, early access to videos
when available, plus extra messages, photos, shout outs, and more. Thank you to members for helping
to keep the trains running and the videos rolling. And regardless of whether you are a member, a
regular viewer, thank you for your support. Now, back to the video. I just had a little camera
malfunction here. So to recap, I just used a shim to counterbalance any slight differences
in the height here that were caused by my barrel bolts on the other side.
And I started off easy, making sure that I had a gap right here where the gap is going to be,
screwed in this section good and tight, screwed in this section good and tight,
and then continuing across. I know I'm going to have some custom cuts, and here is one. As you
see here, I'm going to have to have a custom fit section here and here. So let's work on that. I
got lucky and in my scrap box found a straight section that had been custom cut for a previous
layout, and it fit perfectly to offset the pieces in relationship to the gap. I also salvaged an
extra metal tie and insulator from the scrap box. I inserted this extra tie near the gap to help
support the rails. By the way, many of my track sections appear to be rusty. In fact, they were
painted for added realism on a previous layout. The inside track is markedly the same, but with
a couple of plot twists. One, while I was laying everything out, I realized by moving where I had
originally planned to put this turnout, it actually makes the entrance and exit to the yard
that much easier. So moving the turnout close to the edge, it does give me a straight edge here to
work with, but as you see, I had to move my barrel bolt to out here. No big deal here on this side,
but the real plot twist is on the other side, and this is one that I knew about. This is an issue
that I knew I was going to encounter, because remember I had lost four feet on this side of
the layout, so things being compressed. In order to align with the existing phase one main, I have
to put the curve right here where my joint is for my drop section. So this is a little tougher. Now,
I did successfully pull this off on the other layout, so I know how to make it happen, but
basically I'm going to have to be very, very secure here. I'm going to have to add some shims to either
side and secure the track down with those, and actually remove this tie, because the cut will
actually go right through the middle where this tie is, and when the leaf goes down, it actually
will work just fine. So to remove the metal ties, just take a flat screwdriver and drive it on the
back side between the tie and the rail. Usually, this one's being difficult, you can usually force
those pins, there we go, apart. After shimming the rails, I secured the rails down on either side of
the gap with Gorilla Clear Grip Contact Adhesive. The product is about the same consistency as
silicone caulk, and so while I was waiting for the adhesive to dry, I went ahead and added the tracks
on either side and connected them all up. So now everything's dry and secure, we are ready to cut.
So I'm going to take my Dremel, and I'm going to use the biggest blade I can find, and I need to
cut here, and I need to cut here on the curve. This is the tricky one. Now I like to, in this
situation, instead of cutting vertically, I like to cut it at an angle. As the lift comes up,
the bottom rail will slide underneath the top rail, and the rolling stock just seems to prefer
rolling through the joints that way. And I'll do the opposite on this side. And so, after a bit of
shimming and filing down of my cut, it doesn't look great, but it does work. So let's find out
if it works. Now, in the name of full disclosure, when I cut the angles on this side, I cut them
backwards, but it's okay. I just then went back with a vertical cut. It made the gap bigger than
I wanted it to be, but o-gauge flanges and o-gauge wheels forgive a multitude of sins, including
my stupidity. So let's check it out. We drop the two barrel bolts, and down it goes.
Whoops, caught my microphone cord. And so I can walk through without any trouble, and I can lift
it back up, attach the barrel bolts, and it works. Ta-da! So that is how I built my drop gate for
phase two of the layout. And so, in a few weeks, there'll be a video talking about the staging yard
over here, which is a complete mess right now because of all the other work that I've been doing.
But this is how I can access the new center area of the extended layout with my big fat belly.
So, as always, I hope you enjoyed the video. Keep the trains running,
and we'll catch you next time with more toy train tips and tricks.