Construction of Phase 2 of my Lionel Trains O27 gauge layout to unfold. After completing the drop-leaf access panel a few weeks ago, the final benchwork has been built and the track has been laid. But are the trains ready to run yet?
**As an Amazon Associate and a member of other affiliate networks, We may receive commissions on qualifying sales generated from the links on this channel.***
Toy Train Tips And Tricks is a channel devoted to the operation, repair, history, and collecting of classic 3-rail O and O27 gauge trains made by Lionel, Marx, K-Line, Menards, and other manufacturers.
The benchwork is built, the tracks are laid, but will the trains run?
Let's find out on this episode of Toy Train Tips and Tricks.
And hello again, this is Mike with another episode of Toy Train Tips and Tricks.
And so, in a previous episode I showed how to put in the drop leaf.
In this episode, it's the moment of truth.
We are going to try to run trains on the new section of the layout on phase two.
At least on the outside main, the eastbound main.
The inside is going to wait, and I'll talk about why that's waiting.
It's all part of the plan.
So first, let's wrap up a few questions from the drop leaf episode.
The two biggest questions I received were...
One, how do you power the drop leaf section because it goes up and down?
The answer to that is pretty simple.
You run feeder wires to the tracks from the hinged side of the layout.
So from this permanent side, you just run your wires across here, tie in.
No wires on this side because of course this flops out of the way.
Now for this, I have some temporary lock-ons put in
before I go in and drop my reel feeders and go into the control panel.
So this is just, again, to get the trains up and running.
Some quick feeder wires from some lock-ons running around.
The other question that a lot of folks had was...
How can I wire the drop leaf so that if it is down
we can prevent trains from falling into the Grand Canyon and going boom?
And the easiest way to do that is...
Since we have these barrel bolts here, I would recommend...
I'm not going to do it with this because my transformer is going to be like right here next to it.
And if I can't look from here to here and see that it's down, I've got bigger problems than this.
So the easiest way...
Use these barrel bolts and run the common...
The ground side of your circuit of the track through these.
You can insulate a few pieces of track on either side
and run it so that if this bolt is not in place and locked
it won't complete the circuit to the common and feed the track through there.
So basically put one side of the common on the latch and one side on the catch.
I guess that would be.
And if it's not in place and bolted, you don't have a complete circuit.
There's no power and the trains die.
So, I'm going to step back out of the way.
And first of all, let's see if we can actually run a train across here under its own power.
And yes, it doesn't hurt to have a little bit of spiritual intervention while we're trying this.
So, one... make sure that it actually runs.
And secondly, that it doesn't fall into the Grand Canyon.
So, here's my guinea pig train here and let's see what happens.
Here we go...
Up and around on phase one.
Let's see if it makes a complete loop.
And success!
We are now running trains on the outside loop of phase two.
So, let's take a look at some of the other features of this section of the layout.
In addition to the advantage of giving me more than twice
the running room as what I had with just phase one...
The other great addition to phase two is this.
This is my four-track staging yard.
Two tracks feeding into the outside main and two tracks that feed into the inside main...
Which will go right here.
These are super extra long.
I can fit like 17 cars on the longest one.
More than is actually going to be able to run on the layout most of the time.
But it's always best to have too much room than not enough.
On a previous layout, I went with a double-ended yard.
And what I found was that the turnouts at each end took up so much real estate
that I really didn't have enough yard to work with.
The big advantage of this for me...
This is not going to be a switching yard.
This is what we call a staging yard or some call a fiddle yard...
Which is where I kind of, as a pun, get my name.
I call this Stradivarius.
It's just a fancy fiddle.
Stradivarius. Get it?
Anyway...
So, I will have trains pre-staged on here so that...
When I want to swap out the coal train for the passenger train...
For the auto rack train...
For the grain train...
I'm not constantly putting cars on the layout...
Taking them off the layout...
Putting them in boxes...
Taking them out of boxes...
I'm just putting a train in one track...
Pulling another train out of the other track...
And away I go.
So, that is the biggest advantage.
Now, in order to pull this off, I did have to make some compromises.
There's always compromises with real estate.
Originally, I had four additional feet on that end of the layout.
That I had to pull back in order to make room for the furnace and the water heater.
My HVAC guy said it's too close.
We can't get in there and maintain it if anything goes wrong.
Had to cut back four feet.
So, in order to make that happen, that made these tracks a lot steeper than I wanted them to be.
However, since again I'm just staging trains here and the power is going to be up here...
My engines aren't going to have to pull the train all the way up this grade.
They're just going to have to have enough power to start it.
And get a couple of inches up the grade onto the turnouts and then everything's flat from there.
Then, because of how severely steep it is, I also had to move the turnouts back this way.
And in order to level things out so that there's not a big drop coming right out of a turnout...
Which would be a derailment problem...
I had to shim things up.
Which, in some parts of it, actually makes the grade more severe.
Some places, not so much.
But, anyway, I 3D printed a bunch of shims.
1-1-1-1-1-1-1-1-1-1-1 inch blocks big enough to put two ties on.
And so, I have a whole combination of those.
So, between those combinations, I can shim just about any height that I need to.
And so, these are shimmed to...
One, to reduce the severity of the changes from one piece of track to the other.
And also to level things out going into the turnouts.
The importance going from one piece to another so that your couplers don't uncouple and so that locomotives
The pilots don't hit the track now again
That's not as big a problem because the locomotives are going to be at this end where things are more level than down here
But still the smoother the transition the fewer problems you're going to have
So while this steep upgrade does limit
What I can do as far as engines and how many cars put behind them
It does have the advantage since this is a single ended yard
When my trains are done, and I'm putting them into the staging yard
They're going to have to back in
Now we know with our truck mounted couplers that backing is not the best thing to do with our three rail trains
In this case the grade gravity is going to help once the rear of the train starts on this downgrade
It's going to start pulling the snack out from coupler to coupler to coupler
So instead of pushing hard against each and every coupler of the train
where the cars will have a tendency to ride up and over the rail and derail as
The locomotive is pushing back gravity is pulling down at the same time. So the locomotive in
Actuality with physics is only pushing up a couple of cars at a time and the farther down the grade to get the fewer cars
That's actually pushing
So this is actually an advantage
For going into the yard
It's a disadvantage for going out with two motors either two single motor powered locomotives for diesels
a good die cast steamer or
You know a good double engine locomotive any of those will be able to pull enough train out and up
For the size of the layout smaller steamers are going to be able to pull that many cars
Anyway, so it's not really limiting them
They're still going to be limited to five or six cars regardless of how steep this grade is
The other reason that this grade is so severe is not only did I have to clear the track up here?
But also the support structure since this is such a large span
I wanted to make sure that this was good and sturdy so I still have my one by threes under here
So my clearance became from here to here not from here to here
So I have a greater distance that I have to go under in order for clearance
And actually these are all for low enough that a Menards triple auto rack
Will clear and with that being the tallest car on my roster
I'm good clearance wise from top to bottom. I also needed to make this very nice and sturdy because
Eventually phase three there's going to be another level on top of this and so I needed a good foundation
Okay, so we're going to pull this train out of the staging yard. These tracks are dead right now
I haven't run any jumpers back here and
Also, because my jumper is on this side and not this side. It's probably going to die in the switch
We'll see but we're going to pull it out and get it out onto the main from here
Almost
Now the problem is
This is supposed to be the eastbound main which means train should be going
That way and this came out of the yard going that way. So what do I have to do to turn it around?
Well, we go back to phase one in that area and we use the double crossovers as a reverse loop
And that is going to turn the train around and get it facing in the correct direction
All right now I have some confidence that this is going to work let's put this pitley train array and let's get some real stuff running
Long freight train. What do you say 20 cars?
20 cars sounds good
for more
What comes next? Well, obviously we still have to do the inside loop
but before I do that
I want to make sure that all of my wiring and all of my track work on this section is
As good as can be I'm going to run it. I'm going to test it make sure that it is as bulletproof as possible
Before putting up the inside loop, which will be here because that will limit access
To the middle section should I need to do any work?
then
Same thing inside loop outside loop all of phase two
Make sure that all of my wiring is good. All of my track work is good and then eventually
Phase three you can see the pillars here. This is where the final layer is going to go on
Top, but that's not going to be for a while
The downside of waiting is that I really can't get into scenery on most parts of the layout
Until phase three is put in and the reason for that is that the track work for phase three will be an integral part of
The scenery so some other things that I'm doing just to make sure things are bulletproof is on my yard tracks
And also you might have noticed them on the bridge. I've added these D railers that I 3d printed
These are available on Thingiverse. These are cool. You do a pair for each
D-rail and there's regular version and there's also some that are marks friendly and actually that's what I'm using
The Lionel can line MTH Menards. They run through them just fine
It just has to do with the depth of the flanges also with the yard notice that the turnouts are all at that end
That's so that they will be exposed and I won't have to deal with any turnout maintenance
Hidden underneath the mountain while I have lots of turnouts and while I have lots of hidden trackage
there will be no turnouts that are hidden on this layout and
That experience says the piece of track that is hidden is always going to be the most problem Murphy's Law
so I hope you enjoy this little peek into the layout construction and where we've
Finally gotten the construction going on phase two running more trains. And of course that's going to create more photo opportunities and not just
Limit myself to these stuff over on this side
I've got some new photo angles to work with once I get some wiring in doing a little bit more painting and yes
I can do some minor scenery before phase three as well
So now that I have a much bigger main line
I will definitely be keeping those trains running keeping those longer trains running and I hope you do too
And we'll catch you next time with more toy train tips and tricks