So we've got a problem and it's not up here. It's down here. It's actually down here on the floor.
See all our floors are out of level. Most of the problem is actually at each external wall.
So down the south face, the north face, but here I can get my hand under here. We've measured it
and there's about 25 mil drop here. There's about 15 at the front. The front door's okay and
obviously at the fireplace is still level because that's all brick. So what we've got to do is get
working underneath the house. Not sure if you can see on camera but a good 15-20 mil drop down here.
Both that way and this way. Big dip. That's actually, it's dropping a bit but there's also a big bow.
This is one of the big problem stumps. So we'll explain more when we get outside and under the house.
This is one of those jobs that I didn't want to actually do myself. It's not that hard to
re-stump a house but it is a super awkward job. A lot of crawling around in the dirt, digging holes,
pulling out the old stumps, trying to somehow get wet concrete back under the house and into the
holes, propping it up with jacks. So I'm actually going to go to the shops and buy a lot of car jacks
this weekend and then next week we're going to get along this front edge of the house because that's
the biggest problem. We actually found one of the stumps, it's not even in the ground at all. So not
a job I wanted to tackle but a job that we kind of have to tackle before we start messing around with
new cabinets in the kitchen or a new laundry. Fun times. The biggest challenge with re-stumping a
house is usually getting good access. The worst thing is crawling around underneath the house,
digging holes, pulling dirt out. We're actually very lucky here, we've got quite good access at
the front side of this house. We've got about a meter clearance and we've actually removed a lot
of the cladding to give us even better access. So at the moment we are checking all of our current
levels, working out which ones need to come up, none of them need to come down. So I think my
battery died yesterday but we hit a bit of a snag where we couldn't lift from where we were trying
to lift. So I had to do a bunnings run which takes three hours around here. So we've got a couple of
LVLs that we're going to use to span across a couple of the bearers and then we're just going to
put multiple jacks in so we can lift it up because we've got to get it as close to where the holes
are as possible. So that's the job today, make sure it's super stable, bigger base plates, LVLs, span a
couple of bearers, lift it up in one section, try and knock out this first little quarter of the front
section of the house because it's kind of the heaviest bit and the most important. Part of
getting good access is also removing this down pipe. We have actually found that it's completely
full of water because it looks like it's a charged system. So side project number 367, cut
this down pipe out, pull it out, get access to the post and see what we're dealing with. Well there's
your problem. 40, you reckon 40 years of dripping? Easy, it's just been leaking the whole time. It's
dumb to even have a fitting on it. Should I pop it? How big a mess are we gonna make? It has to come
out to do this post. This is like the job of um start, starting new jobs. He said if you feel it
from here, it's full to the top which means that whole part length of pipe's full as well. So we're
gonna design a whole new down pipe system. It's dripping so much, that's so wet. So the only reason
it wasn't dripping this much is because it had soil up against it. Oh man, all right, another side
project. So I may have dealt with a bit of water around here before and best practice is to make
sure we've got somewhere for it to go. So we're quickly jumping on the Kubota, digging a big
trench so all of the water doesn't end up under the house. Did you see how dry it got when we got
like two feet out? Like from here it's dry, like that's powder. Well it's powder compared to this
and we notice all the way along here, it's just wet around every stump. It's like being the driest
stem we've had. Do you want to do the honours? Yeah, let's see the demo.
Oh we might not have dug a big enough trench.
It's gonna fill up. Jesus. I'm gonna have to dig it out though. Wow, that's a lot of water. Well
that's better than that going under the house. How are we gonna have to trench it? I don't have
a pump or anything. That'll drain. It'll just go back. It'll soak back under that. We're gonna dig
a hole there later. So being that this is one of our biggest problem areas, the house sags all the
way in the middle. The two corner posts are actually quite good on the levels. We're actually
going to span multiple barriers at once and lift them all up at the same time to try and get them
perfectly level. I'm not sure if you can see that on camera but I can. The house is actually moving
up a significant amount. There's about 45mm that it needs to come up on that third post.
Continuously checking our levels as we go. We don't want to go too far but we will be getting
a little bit of damage inside. I'm sure about it. This one's sinking a bit. If I do a Bunnings run
I should get enough to do two more. We can dig this now, set the post up, concrete them,
and as soon as we've concreted it, back prop it and move the LBL. Remember when we were jacking
from back there? It flexed a bit. It's gonna sink. We have to leave it in. Go to Bunnings.
Another three-hour round trip. Alright, another trip. So after propping that first section of the
house we can see that the house is actually twisting a bit. The door is completely skewed
at the moment so we thought that the safest way forward was to try and lift the whole front of
the house at the same time because as I said before it's actually dipping in the middle and
the corners are not too bad. So what we've done is got a couple more LBLs, we've doubled them up,
nailed them together. We're going to span three barriers at a time, three big LBLs across the
whole front of the house and slowly jack up basically the whole house until it's completely
leveled. We're going to leave those LBLs in, let the concrete go off for at least three days before
we pull them out. Dusty, you're a menace. Get out of the hole. Out, out, out, out. Alright,
we have three big beams running the entire length of the house now so we're doing three
barriers at a time. So how's that one looking now because we did have that level. Is that still
level? Don't tell me it has to go down. A couple of mil. Do you know what? Both corners of the house
were actually pretty level then. We didn't really change that far corner in the kitchen,
we changed all the ones in the middle. That's got to come up 20 mil. I don't think we're
going to get the number. Heaps of ways. Alright, going under. Yeah, go under mate. This one's okay
now. This one to the right of the door here, concrete one, that one's spot on. That's still
10 mil so bring that up because the door's almost correct. That door's almost square again.
Oh, a couple more pumps. Oh, this one's almost pretty good now as well. That's it for today. Big
long day with an extra trip to Bunnings but we've got this whole wall within five mil each barrier
which is pretty bloody good from where it was. Pretty good to get this whole old like hand-cut
barriers. They're twisted, they're not cut straight so that's awesome to get it that straight. Tomorrow,
big job digging holes and concreting in the new post and then we just have to do all the other
rows in the house. Boom. So again with getting good access, decided to pull this little deck
down. It's going to get replaced later anyway so back on the Kubota. The little do-it-all machine.
Pulling out the concrete posts that aren't really concreted in like a lot of things around here and
getting us some better access to these middle stumps. So I'm going to put a sliding door right.
It's still going to finish here so this stump's quite important and I'm going to go from there.
It's going to be three meters so I think it's about here we can measure it. We split the
difference. We put one, we end up putting one right in the middle here as well. We can do that after
though. Yeah but we'll leave that LVL in. Leave it, leave it. Oh, we're just going to go this way.
Put the LVL in, put three stumps under the LVL. On a job like this with a house in this sort of
condition you are going to run into other little issues. A couple of the barriers are actually
rotten at the end and someone has replaced some of these stumps at some point with concrete ones,
not that they were actually touching the bearer. So this LVL in the center section we're actually
going to leave. Our new stumps are going to go under the LVL. We're going to tie it back into
the bearers and we're going to leave it in. So we're going to actually add a couple more stumps in.
One, two, three, four, five, six, seven, eight, nine. There's nine jacks in there.
Yeah we'll just dig right up to it. We'll get concrete in from the front. It'll be fine.
There'll be heaps of concrete. We can't put concrete up over the pipe anyway, over the
sewage pipe. Yeah it's going to be heaps stronger with that in it. Could have done it for all of
them. Could have just placed them better and then cut them to size you know. But then we wouldn't
have been able to jack on the outside. We didn't end up jacking on the outside of them anyway.
I need that one. Could just leave them all in. All right so we've worked out a little system where we can
ratchet strap this thing up. I don't think that needs to go almost all the way up. Before we started
this project we did spend some time crawling around under the house and measuring all of our stump
lengths. So I ordered up from memory around 55 stumps at varying lengths. We worked out what
our stump length was and what our hole depth was going to be and just ordered them accordingly.
We've dug all our holes all the way along this. There's nine stumps in total. Time to get them
all up in place and get on to concreting. Stage one complete. Do you like what we've done here?
I have no idea what you've done here babe. Well we've opened up the underside of the house to
expose the beautiful foundations. Isn't that what you wanted? You wanted an airy
free-flowing house so when we're in winter and the big southerlies blow we get that
nice airflow through the house. This is exactly what I wanted thank you. I mean it's gonna be good right?
Well it's gonna be better than what it was. We had nine stumps along the front here and only two
weren't floating in the wind and completely rotted out. So I don't even know how the house is still
standing but we managed to get them out and we've managed to fix and level this whole southern front
of the house. Yeah so we started at this corner because that was kind of our datum point because
that was the right height that was level with the laundry that we'd already done and the front door.
So the front door was okay but then we actually lifted this first section the first three posts
because as we tried to lift that single bearer on its own the house was kind of like it was all over
the shop it wasn't really lifting properly and we were knocking everything else out of level so we
decided to go all three bearers at once with a big LVL there and lift it up. Then we hit another problem
where this door ended up fully triangled so we ended up having to get more LVLs and basically
lift the whole front of the house at the same time so not to break everything every window
every piece of plasterboard inside. So all your LVLs are because you did multiple kind of...
We went across three bearers at a time so our bearers run that way the spacing's not quite right it's an old
house built in the 80s hand-built hand-cut timber like you can see that bearer it's not even square
so yeah we're dealing with a lot of different things but what we figured we had to lift the
whole front at the same time we're gonna leave this LVL in because some of the bearers are actually
rotten at the end and when we put a new door in we kind of want another stump under the end of
that door yeah so a lot of the bearers and the stumps don't line up with internal walls they
don't line up with doorways they're just kind of all out of the shop so we're trying to fix it as
we go we're going to add in some more posts more stumps so how long have you spent on it so far
restumping we spent all last week on it so a week but that included two days of two bunnings trips
which are three hour round trips so they were basically half days only because we kind of didn't
know what you're dealing with and when you're doing a restumping job like this you don't really know
what you're going to do until you start i mean you hadn't restumped a house before no but it's
not that hard get it level put new stumps in make it better than what it was i guess yeah so what's
next next we've got to get under the house we've done about a third of the stumps i think there's
about 55 in total how many of those are going to be intact uh most of them because they don't have
water sitting on them this was all wet along the front here okay we dug it up so they should be
intact and some of them we're not even going to pull out we're just going to put a new one next
to it okay we'll just see how we go but we're going to start on the other side of the house
so we've done we've done that side we've done the whole laundry and kitchen okay and we've done the
whole front so now it's just the rest of the house across the yard so that's a job for next week
start tomorrow well done babe but we have killed this deck what's your vision for the deck oh okay
um bigger bigger that's the vision this is going to be bigger sliding timber sliding door yes
yeah so we can really open up to the view i want to walk into the home and i want you to see this
like that needs to be like a beautiful picture frame out into the view so that obviously needs
to be a lot bigger open that all up we've worked out we did kind of play around with sizing but we
essentially want to come out how many meters did we say i think it was four i think that might be
too big is that can you go too big it's just decks are expensive it's just materials are expensive
but it's like you can go as big as you want no one's ever said oh that deck's too big so what
i need to resolve and i haven't yet is some kind of structure whether or not we had shelter you
want shade yeah haven't navigated exactly the right resolution for that yet because obviously
it needs to work with the exterior wall so we haven't worked out the exact exterior cladding
finish that we're going to do but we do want to have well that's a good note i have cut half the
cladding off but that's because it was all rotten there's holes in it and we are going to replace it
all yeah we're not leaving we did cut it so we had good access this is not saying we need an outdoor
kitchen you've got ideas for the outdoor kitchen which i think i got a massive idea yeah i need to
talk to you about that um but essentially i also want to have room for a fire pit seating i want to
have sort of a bit of a landscape garden at the front of the deck like i'm playing around with
ideas but essentially it's just gonna be bigger more open because look at that look at that
that's what it's about there that's your view sweet view it's beautiful it honestly i think
simple will be good because you don't need to over complicate things we better go inside and
order some windows then have you seen this window i've repaired it twice oh my god these beautiful
feature window boxes you can fix anything with gaffer tape yeah i actually they were built in
the 80s 1983 1983 guys yeah what a terrible design it's held together with silicon still
barely 2024 sticky tape it together my goodness yeah but still i'm surprised all the bees get in
yeah holes all through it yeah what a delight right that's gonna go it is going that is gonna go