7.30, potent truck is here perfectly on time. Oh, I'm so thankful for companies that do what
they say they're going to do and arrive when they say they're going to. Oh, it's so good.
All right, so Wilcox Rock and Sand should be here in about 30 minutes. We're going to get started.
The concrete truck is setting up and going to make sure that the boom can lift and
that the boom can reach everything from one spot. So the goal is we don't move this much.
So running around like crazy. I'm so excited. This is a big deal.
The arm on this pump truck was crazy. It just kept unfolding
and unfolding until it reached all the way to the other side of the roundhouse.
Looks like we won't have any trouble keeping it in one place for the poor.
Okay, cement truck is here. So it's happening. Things are freaking happening. Oh, let's do it.
We were kind of curious how the pump truck and the cement truck would work together.
Turns out it's pretty simple. The cement truck uses a short chute to go into a small hopper
on the pump truck to prime it. Then it just keeps slowly releasing during the pour, making sure not
to overfill. They had to do a quick test on the ground to make sure it was pumping properly,
and then we were ready to get started. All right, everything's here set up and ready.
They are getting in position to do the first wall, which is going to be the inner courtyard wall.
We're going to do inner courtyard, hallway, bedroom, living room. So, oh my gosh, I cannot
even ... I'm so nervous. This is huge. I'm not going to freak out.
If you completely cover our beam pockets, it's no problem. If it's just a little bit of
I'm going to let it kind of fill in over here.
There we go. There we go. He said it would come out slow, but to me, it felt like it
was pumping crazy fast. It was at this point I realized I was going to get really dirty.
Hey, dude, how much do you want him to do that?
It should quit settling down. I don't know. He's been scattering.
Our goal with this bond beam was to pour the concrete up to the bottom of the two by eight
pitch plates we installed, and then use a concrete vibrator to level things out a bit.
No need for the top to be perfectly flat.
I think we got to the good part. This life is a work of art.
Are you guys watching the plate?
I like this one.
With the inner circle complete, it was time to focus on the hallway circle.
This one went much smoother now that we understood the process.
Okay, we're about halfway done, and this is going so much more smoothly than I ever imagined it
could. We're almost done with the first truck of cement, so he has seven yards. He thinks he has
two left in the truck. Second truck is on the way. We're just starting in the bedroom circle,
so we have that whole 120 something feet to do with the bedroom circle,
and then we'll move over to the living room, and then we're done.
And I cannot believe it, but there is no dripping going on out of these forms.
Truck number two.
Second truck pulled up. I feel like we're halfway.
So while they're while they're doing that, we're going to get these little scrap things.
Okay, that first truck had seven yards. The second truck has six. We're thinking we might be
short just a little bit, even though we've done the calculations over and over and thought that
we needed 13 yards. We're just, we might be short a little, and if we're short, it's only going to
be like one yard, so it's going to be real annoying, but you know, you got to do what
you got to do. So we might have to have a third truck in here. We'll just see. We're hoping that
we have more in the pump than what we think, so fingers crossed it works.
Guys, we have such a good crew here. We have so many people that are here to help move scaffolding,
break down scaffolding, get it into the next room. Everything is going very smoothly. I could
not be more happy with how this is going. This is all a huge thanks to my dad for like coming out
here, helping us get these forms set up, and they're so strong, and I mean, I had no doubt in
him. I'm going to get on the plane, too, and I'm going to Costa Rica where I'm going to see monkeys.
Wave.
Yes, Sherry, you're the best supervisor ever. You don't talk much. Keep yourself preoccupied.
Because I don't want to be away from you, I don't like to see.
And I don't want to be alone, and you know, and you don't got to be cool, baby, come close to me.
And I wonder if you ever think the same, because whenever I'm around, things can change.
We estimated this job to be four hours, and we're going to finish in under two. Wild.
Keep going. Got more. Got more. That's good. I can't believe it.
Done. I had enough concrete. We started at eight, and it is 9 46. Wild. This is just incredible.
We did it. They're taking it back. I gotta get a video of what you look like.
I've already cleaned most of it off. You gotta make sure to clean up. I'm getting a shower,
for sure. You want to go do it now? I don't know what's happening. I think you should do it now.
Oh my goodness, friends. Can you believe that the bond beam is officially finished? I can't
believe it. It has been months of planning, weeks of all the prep work, and the building of the
and two hours of pouring. A lot of buildup. But it all went off without a hitch. We couldn't have
asked for anything better. So of course, we want to say a huge thank you to all the people who
made this possible. We worked with Preferred Concrete Pumping out of Tucson, and that was a
great experience. Michael is our contact there, but I cannot remember the guy's name who came out
and did the pumping, but he was so good. They both are great. Michael actually came out here and
looked at the project before he gave us an estimate, which was super helpful, because we
were like, it's a little weird. But yeah, they did amazing. Then of course, Wilcox, Arkansas,
they're our go-to for any concrete, and they did a fantastic job. The trucks pulled up right on time
perfectly. Like we said, we got the whole thing done in two hours, way ahead of schedule. Yes,
but we also want to say a huge thank you to all the people who came out from near and far. A lot
our Rumble friends came back. We had Andrew and Tiffany, and Scarlett and Fiona, and Steve,
and John, and Tom and Thomas, and Jenny and Solstice, and Todd, and we also can't forget
my dad. Well, of course not. I mean, this was his whole brainchild. I mean, it's all his fault,
really, this whole idea. Well, he was blaming me all the time. He's like, who built a roundhouse?
That's true. Fair point. Okay. Anyway, all of this couldn't have been done without all of you
who have made this day so much easier, and we can't say thank you enough. Yeah. And you know
what? I mean, if you want to get in on some of this community, we do have a few events coming up.
I just thought I'd throw that out there. There's Hyper W Safety 101, February 28th through March
1st, Homestead Tour on March 28th, and the big Lava Crete Utility Lodge Workshop, April 6th
through 11th. Yep. We already have a few people signed up for that, so we're very excited. We
need some more people because this is going to be a really cool project. It is. So you can go get
more details. Sign up at tinyshanehome.com slash events. That'll get you to all those different
event pages. But you know what? Where do we go from here? We're going to wait for the concrete
to cure for quite a while. True. And then we got to spend a lot of time taking these forms down.
Take the forms off, and then we get to start working on hurricane straps, and that is all
coming up next, and we will see you then next time. Next time. Next time. Okay. In the next video.
All right. We'll see you later.