It's alive! PiP2 50cc Two Stroke. Most Powerful this time?

Engine Nation
3 followers
Welcome back to my garage. My cylinders should be here in well tomorrow or the day after tomorrow
I think, hopefully now. So we can actually assemble the land speed engine and I'm leaving
for America in two weeks now. So we're running out of time. Still waiting for plugs and plug caps
and the ignition unit but that should be here this week also. This weekend I've been working hard to
get one of two tiny little dirt bikes functional for my kids because they suddenly caught some
interest in dirt bikes which is cool. And I'm also working on getting the bike for this engine
up and running. I thought it would be just a matter of, well you can see the
hacked on ignition unit here, switching out the ignition and surely the switching out the
ignition worked. But I started noticing more and more things touched and of course destroyed by
the gnarled hands of Norwegian moped kids. Which led to this point where I'm gonna completely
disassemble and fix it, hopefully. I haven't got seals so hopefully the seals are okay.
I'm gonna make a new gasket after splitting.
Dropped it in my coffee.
Yeah, fine. Pull the clean bolt.
There's my taper enlargement solution. A cockroach lead.
Got it in there and now it's super tight. I think we'll have to wait.
I'll have to order bearings. I'll order bearings and seals. Let's do it properly.
My cylinders are back from plating at Blixten's Racing.
Thank you Blixten's Racing and PowerSeal yet again. They are looking beautiful.
And also my ignition unit from Sealtronic arrived. Thank you Sealtronic. This means we have work to
do. I have to clean up my desk here and we will start assembling the engine. Well we'll have to
tap some holes first. I've bought some fancy watertight connectors and a crimping tool for
them. So that's why the mess I've been playing around with. Just test crimping. First thought
I could get away without the tool but nah. Better to have the correct tool. Let me clean the desk
and we'll start assembling.
A
slight mismatch up here. But that I can
like a millimeter. So I can fix that with a file.
I should maybe have given myself more. Nah it's fine.
It's pretty much locked down there so hopefully we're...
I think I want to enlarge the holes here a tiny little bit to be able to center. Of course I
should have put in some alignment pins. Maybe I'll do that. But it's like maybe half a millimeter
skewed in this direction. The reason for that is like compounding small errors in machining.
And so I think I want to drill this out to 6.5 maybe. Not the most low profile nuts but
well they're airtight and they're definitely long enough.
And we had a tiny little bit too much play. And these are a tiny little bit
less thick than the actual bearings. So this should be very close to perfect. Which
is perfect for actual play. Is that going on a little crooked?
Yes it is. I think I want to
might want to heat this up. I might have cooked that bearing a little bit too hard. It turned
a straw color. Actually bluish at some points. So I think it's compromised and we should put in...
Well we'll see how it works and we'll replace it. We'll replace it after
the test assembly and test fire. Note to self don't heat them that much. They're expensive too.
So obviously my calculations with the 3d printed bearings were
off. Because this is much more end play than what I wanted. This forces me to
take that thing off again. Which is good. Then we can use one that's not cooked and
we'll have that as a spare. Now thanks to Mito Toyo we can quantify how much we need to add
shim wise. This would have been more suitable here but the stem is thicker. I think maybe
that's because it's imperial something like that. Anyways let's pull this all the way in.
So 0.78. I've got 0.1 and 0.15 shims here. Two for each side and that should bring us up to
roughly 0.25 on each side which should be perfect. Let's try that.
Okay have we learned our lesson? That's the question. I'm gonna heat up the other bearing
and get it on here. This time without overheating it. Hopefully. First let's double check the shims
here and see what we've got. Oh there's 0.3. We add 0.5 millimeter shims to each side here.
That should give us a slightly loose but acceptable. Yeah there's 7.3. 0.3. A slightly
loose but acceptable and better than tight axial clearance.
We'll have to live with needing to do a little bit of a press I think.
Nope we're fine. Okay so that's all it takes. Note to self be more careful heating stuff up.
Okay 0.20. No 0.3. Okay that's good. That's good. An added bonus we're running a not cooked bearing
on the rotary valve side. Yeah that worked really well actually. A little bit further in so let's try
stacking these. That's perfect because now I won't have to worry about having a super thin
spacer like I can. And it doesn't touch the seal. And then I give it a little bit of a
like I push it around in the groove just to make sure that it's actually seated.
Okay so now let's test fit the cylinder without the gasket and see where our squish is sitting.
And without the piston ring of course and we'll gap the ring later on. I'm going to check the
piston clearance also even though I can't really do anything about it now because the pistons are
here and the cylinders are here. And I need to I need longer of these and shorter. These I can cut
but I need longer ones of these really.
We're sitting at 0.87.
So we're clipping the head and that means it's misaligned enough for
we'll have to enlarge the holes in the head and the head insert and so that we can properly align
it as it's a tiny little bit off center. Good thing it didn't go together perfectly because
I forgot to put on the o-ring that's supposed to go here. We'll have to do that.
Now there's a little bit of play here and by pushing it mostly forwards like that we're
centered correctly. This might not be the case with the other cylinders. This is because of
inaccuracies in dialing in the bore for drilling the bolt holes and all that.
So inevitable really. Here's that o-ring I was talking about that's supposed to sit here.
There's a large chamfer or bevel here that pushes down on it. Now it spins freely,
doesn't hit the head, the piston doesn't hit the head and let's check our squish gap.
We're tight enough to go single strand. 0.38. That's because of the crush of the gasket.
That's not a problem. We want it up to like 0.6 to be on the safe side as we're going to spin like
20 000 rpm. That's why I made these. This is 0.1 millimeters. If we put that in there and also
keep in mind I'm measuring the gap on one side so the piston cocks a little bit so it's probably a
little bit tighter than what we're seeing. We're going to add this and check again and if it's
good we're going to gap the ring and install it. I'm going with this paper version instead just
because it's a tiny bit thicker. 0.5. For safety sake we're going to add another one of those pink
gaskets upon final assembly. That should bring us up to 0.6. I should have done the ring gap before
assembling the head or putting the head onto the cylinder but it doesn't really matter. Usually I
measure the ring gap up there because that's where it's going to run but I'm going to double check
the cylinder now and see. First of all I've checked my Mitutoyo bore gauge just to see that it's
actually calibrated and with this calibration ring and everything is sitting at the same temperature.
So now I'm going to see just make sure the bore is straightened
and two dimension so we should be reading dead on 40. So there we're reading 40 plus so 40.005
and here we're reading 40.004 so it's dead on. That means it won't be a problem to check the
ring gap down here versus up there. It shouldn't be and it isn't and the ring gap is I can already
tell it's far too tight. We want to run at least 0.2 millimeters. I think 0.3 is better
because we're going to run like full blast for several minutes without much warm-up.
At the moment it's sitting at pretty much nothing. I think I went too far as is tradition
of course. Luckily I've got a bunch of rings here and in America. Not that bad actually 0.35
fits in there super snug. Okay we'll call that good.
The
camera is running out of storage too. I think we'll have to we'll have to call it a day.
We're so close though.
Sunday night. Last time you saw me it was Friday. The next logical step now would be the
the rotary valve, the variator and then the ignition trigger. We're going to do the ignition
trigger first though because now it's mounted exactly like it's supposed to be. So we can
mount the trigger and then see that it works. See if we have to make changes. Better to have
to make changes and disassemble this than when everything's assembled. A couple of options here.
I've talked about them before. Option number one is using thread sealant like this. Second option
is a teflon tape. I think maybe this is the best option because the the threads here are fairly
loose. Makes me want to use this because I think this will help isolate this from vibrations and
also I think it'll seal well as the threads are loose like that. The sensor is hooked up to power
and the signal wire is hooked up to the meter and now it's reading 48 millivolts. It's seeing
metal so that's zero, low. Now I'm turning it and hopefully we'll see the trigger point
sometime here. There. Turning back and there's the trigger point. Micrometer in the plug hole.
So first we're going to find top dead center and that means going until this starts going
down again. Starts falling so it's still rising. Okay that's top dead center, that's zero.
And now we want to see where this triggers. Okay so 334. I'll call that 334. Let me check
what that is in degrees. 3377 would be 31 degrees and 317 would be 30 degrees. We'll set base timing
to 30 degrees in the ignition unit. So I've set this is sitting at top dead center now. I've set
that with a with an indicator. We're just going to use some calipers. So now I'm going to check
how far down top dead center is. 24.48 and I'll zero there and then we want 20.09 I think. I've
locked the calipers and now we're going to set it to, we've got to remember we're talking about
after. So this is the closing time. It's supposed to close 85 degrees after top dead center. So I'm
spinning the crank in the opposite direction until it hits now there. And in this position
the valve should have closed the hole. Just closed it. And now this should be positioned so that it
just closed the the hole. The valve should just have closed when this stops now. Perfect. Perfect.
I just received notification for a package ready for pickup and it's the perfect package for what
I'm about to do now. So hang on. I postponed the fabrication of my little makeshift engine stand
because of a thing I picked up yesterday. And I had to postpone further making of that engine stand
because I was missing a key part. And now after grabbing that key part I realize I had the wrong
of another wrong kind of another key part. And now I can't postpone anymore. So I'll have to
no sneak peek into what I picked up yesterday.
It's electronic software. The programmer is hooked up to the computer.
Hooked up to the ignition unit and it says it's successfully connected. And I'm gonna
disable TPS. I'm gonna set the rev limit to 20k. Sealtronic told me they could
up the rev limit because I don't want it to be at 20k I think.
One pulse per revolution. Static angle 30 degrees. 15 flat line. And
that's pretty much it. Test spark execution.
It works. Perfect. Fuel hooked up. Ignition seems to be working. I'll turn on the water and
hopefully it doesn't just spring a leak. Choke. Fuel on. Ignition on.
What could be the problem officer? So obviously it's not picking up the trigger signal. I think
I found the problem. Of course it was my fault. My mistake. I'm supposed to ground this and I
haven't. That's the negative for the pickup if you're running a reluctor pickup. And I've already
confirmed that the hole sensor is actually working as it should. So let me hook this up
and we'll try again. I forgot to hit record. You can probably tell by the smoke that it works.
No exhaust extraction at the moment so I can't test it too much. But it works. So
it works. And there's no reason for it not to work well. I hope. As Travis's dyno is up and
running the proper testing will be done in Colorado. What we need to do now is prepare the
two other cylinders. The cases and just prepare everything. And I won't bring everything over
this well next week. But everything will be brought over for Bonneville in August.
See you next time.
