The way we buildearthen house is different from normal house because we will do the floor or the slab before foundation.
#agriculture #Garden #Permaculture #Foodforest #FFG #Syntropic #biodiversity #climatechange #farm
After building earthen house for many years, we discovered that we need to make the floor first
and the foundation on top of the floor and then we can build earthen wall above the foundation.
That is the best way because it can protect our house from termites and moisture very well.
Normally, if we make the new mouse on our land to make it high and we want to build a house on top
of it, the soil is very loose like this. Normal people will let it sit like that in the rain. At
least two rainy seasons, it will pack very tight, very strong after that. But if we don't have time
to wait, we just make a dike around that area. The dike, if we can make it high like one foot
at least and then pour water, fill up with water in that area and then let the water,
when we fill up with water, let the water seep underground until it dries and then add the
soil. After we do like this three to four times, our soil will be very, very packed and very strong
and it is ready to build. We don't need to wait until the soil is totally dry. We can pour the
floor on top of the soil that's still wet. We can build, keep building on top of the soil that's
still wet. The weight from the house can help to press it down, make it more packed, more tight.
But our land that we are going to build now, we make a mound many years, a few years already, so
it's totally packed. We need to clean the grass out and then we look at the location together.
How do we want it? Which way is a nice view? This is very important to look at the real site
before we make the floor, before we lay out how the house will look like. It's good to have many
designs to see which one will be fit with our area the most. We are lucky our son knows how
to use the program that helps us to see different kinds of buildings, different styles.
That is very good for us. In the early days of our building, we always make the foundation first
and then finish the whole thing and then we pour the floor at the end of it because we think that
that will help to make it easy because we don't need to clean our floor so much. But the problem
is when we pour the floor later, it always makes some crack between the floor and the foundation.
That is where the termites come up. We don't like that. Then we found that to pour the floor first
and the foundation on top of the floor. This technique works so well. We recommend people
to do like that. The floor first and then the foundation above the floor. That is the
good way to do. But this one, we want to do more experiment. We want to make the foundation under
the ground with the rebar and then the floor and then another foundation above the floor again.
So, it will be our experiment to compare to see what will happen. So, when we pull the string
to mark where is going to be the wall, the foundation, and then we have to prepare
the drainage pipe. Drainage pipe, we need to bury under the ground because when we pour the floor,
we cannot put it late in after that. So, it's good to bury the drainage pipe under the ground.
At the septic tank, we always put the elbow like this to hold the water. So, the water will
stay in this angle and then it stops the smell. The smell cannot go into our room. This is a very
good technique that we have been using for a long time. All the drainage pipes have to slope to the
septic tank and every one meter, we need to slope down one inch. That is the standard that we use.
That makes the flow flow better. That's the technique we do. And we experiment to
put plastic in one room on the ground before we pour the floor because some people say that
it's going to help to stop the moisture to go to the floor very well. That's why we want to
experiment more. But you don't need to do like us. Just the floor and the foundation above the
floor is good enough so far. This is our extra experiment. So, to do like this, you pay more
money for the rebar, for the plastic, but it will work for us to learn because we like to learn.
We like to experiment to see which one it will be the easiest, cheapest, and then strongest.
That's our aim. That's why we keep doing experimentation all the time.
Normal floor, we recommend at least four inches. At least. If you can get five, six, seven,
it will be the best. It will be like a big slab, thick slab of concrete with rebar inside.
And then we can make the foundation above it and build on top of it. So, it will help to hold the
whole house to stay strong together. That's why we don't need the pillars under the ground. We don't
need foundation under the ground. But this floor is not the finished floor. It's just rough floor.
So, the finished floor can be at the end. This floor, after we pour the floor, we make the
foundation like this. It's so hard for the termites to move to our house because they need to make a
dirt trench, dirt tunnel to our house. So, we'll sweep them out easily. To do like this, it protects
our house from the termites very well. So far, it works the best because they cannot come to our
wall easily because the footpath around the house is at least one or two meters sometimes. So, it takes
a long time for termites to make the tunnel across this footpath and then go up to the
foundation. And then, they can go to the dirt. So, before that, they will be swept out easily. So, this
is the floor that we finished. We can see only the drainage pipe sticks up. And then, after that, we
need to pull the string again to do the second foundation above this floor before we build a house.