By the early hours of April 29, just after Ship 36 returned to the production site, S35 made its way from Mega Bay 2 to the Massey test site. This move came about two weeks after S35’s Raptor engines had been delivered and installed, signaling readiness for testing. Later that same day, S35 underwent an initial venting procedure, a small but necessary step to prepare the ship’s tanks and plumbing for full-scale operations. Something Wrong Happened with S35 Static Fire!? Is Starship V2 Cursed... That evening, teams performed a tank system check to verify fuel flow and pressurization systems. These preparations culminated the following night, April 30, in the ship’s first static fire test. Under cover of darkness, a brief flash of flame lit up the launch stand, followed by a modest plume of smoke. The low intensity indicated a single-engine ignition, later confirmed by SpaceX. The test involved only limited propellant loading—just a partial fill of the methane tank and less than a third of the liquid oxygen (LOX) tank. Footage released on SpaceX’s official X (formerly Twitter) account showed one sea-level Raptor engine igniting for approximately seven seconds, likely reaching its maximum thrust of 230 tons. The ignition and shutdown were both smooth and controlled, suggesting a fully successful firing. ---- We use images and content in accordance with the YouTube Fair Use copyright guidelines: https://www.youtube.com/intl/en/about/copyright/fair-use/ Any questions about copyright please send us via Gmail: [email protected] To be resolved, thank you.
SpaceX has just completed a major test
of ship 35, marking an important
milestone on the road to Flight 9 of the
Starship program. Meanwhile,
preparations are moving forward for the
next crude dragon mission set to be one
of the key human spaceflight events of
the year. Farther out in deep space,
NASA's Psyche spacecraft is encountering
some unexpected challenges on its
journey, raising new questions about its
ambitious missions. Let's dive into all
these latest updates right here on
today's episode of Great SpaceX.
SpaceX is steadily, albeit slowly,
progressing towards Starship like 9,
with recent milestones marking critical
steps in the pre-launch campaign. It's
been nearly a month since B14's static
fire test, and attention has now shifted
to S35 as it enters the spotlight. By
the early hours of April 29th, just
after ship 36 returned to the production
site, S35 made its way from Meabay 2 to
the Massie test site. This move came
about 2 weeks after S35's Raptor engines
had been delivered and installed,
signaling readiness for testing. Later
that day, S35 underwent an initial
venting procedure, a small but necessary
step to prepare the ship's tanks and
plumbing for full-scale operations. That
evening, teams performed a tank system
check to verify fuel flow and
pressurization systems. These
preparations culminated the following
night, April 30th, in the ship's first
static fire test. Under cover of
darkness, a brief flash of flame lit up
the launch stand, followed by a modest
plume of smoke. The low intensity
indicated a single engine ignition,
later confirmed by SpaceX. The test
involved only limited propellant
loading, just a partial fill of the
methane tank and less than a third of
the liquid oxygen tank. Footage released
on SpaceX's official X account showed
one sea level Raptor engine igniting for
approximately 7 seconds, likely reaching
its maximum thrust of 230 tons. The
ignition and shutdown were both smooth
and controlled, suggesting a fully
successful firing. SpaceX commented on
the event, stating, "The Starship
preparing for our ninth flight test
completed a single engine static fire,
demonstrating an inspace burn. This
milestone is particularly important
because it serves as a test for
mid-flight engine reignition, a critical
maneuver that will allow Starship to
perform complex inspace burns. While
this was previously demonstrated on
flight 6, the company was unable to
replicate the feat on flights 7 and 8,
this test is a step toward ensuring
reliability in that capability for
flight 9. However, this is only the
beginning of S35's test campaign. To
move closer to launch readiness, SpaceX
must also complete a six engine static
fire involving all three sea level and
three vacuum raptors. The company
attempted this next step on the
afternoon of May 1st, initiating fueling
and venting procedures, but after some
progress, the system was detanked,
indicating an upwarded attempt. A second
try was hinted at shortly after based on
temporary road closures posted for May
2nd and the 3rd, likely to support
movement between Massie and the main
factory, another sign of ongoing
operations. The six engine test was
eventually carried out as scheduled. All
engines were ignited simultaneously,
generating more than 1,400 tons of
thrust. The firing lasted up to 30
seconds, shorter than the one minute
test achieved by S34, but long enough to
test operational limits. Notably, during
the burn, the engines appeared to vary
their thrust levels, like simulating the
adjustments needed for complex in-flight
maneuvers. The flame trench system at
the Massie site played a key role in
dispersing the intense heat and pressure
during the event. Once again, the test
took place at night, but this time a
powerful exhaust plume could be seen
shooting from one side of the stand. A
sign of the full power of the static
fire. Following the recent static fire
milestone, SpaceX is expected to carry
out several additional tests on S35 to
ensure mission readiness for Starship
Flight 9. These may include further
single engine firings involving
different combinations of sea level and
vacuum raptors as well as tests using
varied propellant levels. Such trials
are vital for uncovering potential
issues under diverse conditions and for
fine-tuning system responses before
launch. Once those final tests are
completed, S35 will be transported back
to Mega Bay 2. There it'll undergo a
thorough inspection process focusing on
key systems such as the engines, heat
shield, and fuel tanks. Any signs of
wear or damage will be addressed during
this phase. Following checks,
technicians will install the flight
termination system and the payload.
These steps also involve continuous
monitoring with meticulous verification
before, during, and after installation
to guarantee the vehicle is in optimal
condition for integration and flight.
Afterwards, S35 will be rolled out to
the launchpad where it'll be paired with
B14 for final integration testing and
pre-launch operations.
At this point, both stages will be
connected and systems such as avionics,
hydraulics, and fueling interfaces will
be assessed for compatibility and
reliability under flight conditions. Now
comes the big question. When will Flight
9 launch? Based on the current pace, we
can make an educated guess. B14 has
already completed key steps, including
the installation of the hot staging ring
and likely the FTS, meaning it's
essentially ready to move to the pad at
a moment's notice. In contrast, S35
still has to go through several
checkouts and installations, which could
take about a week or more, likely from
May 3rd to midmay. After that, assuming
SpaceX performs a wet dress rehearsal,
which would add a few more days, the
launch could occur around the 20th.
While this may feel like a long wait,
especially as it'll be more than two and
a half months since flight 8, it's
important to remember that precision and
safety are the priorities. A longer
preparation cycle means SpaceX is being
cautious, working to ensure a successful
mission rather than rushing to meet a
schedule. Given the ambitious goals for
Flight 9, this careful approach is fully
justified. In short, we're getting very
close to the next big step in Starship's
journey. If you're as excited as we are,
comment let's go 9 to show your support
for SpaceX. And don't forget to like the
video and subscribe to our channel to
stay updated on Starship and other
exciting developments in the aerospace
world. Your subscription also helps us
push closer to our 200k subscriber
milestone. And for that, thank you for
being part of the journey.
Now, let's take a look at the latest
developments surrounding the upcoming
Crew Dragon mission Axiom 4, a private
space flight organized by Axiom Space in
partnership with NASA and SpaceX. On the
29th of April, NASA and Axiom officially
announced that Axiom 4, or Axe 4 for
short, is scheduled to launch at 10:03
p.m. Eastern on May 29th of 2025. This
mission marks Axiom's fourth crude
mission to the ISS and continues the
company's goals of expanding global
access to space through commercial
partnerships. In preparation for the
launch, the AX4 crew has undergone
extensive training, including rigorous
evaluations using Axiom Space's next
generation spacuits designed for
enhanced comfort and flexibility in
microgravity. The training campaign was
a success as confirmed by SpaceX, which
stated on X that the Axe 4 crew had
recently completed training in
California ahead of their mission to the
International Space Station. This
mission features a diverse international
team of astronauts with representatives
from the US, India, Poland, and Hungary.
The crew will be led by Piggy Witson, a
record- setting former NASA astronaut
and Axiom's director of human space
flight. This will be her fifth trip to
space and her second with Axiom. The
other three, Shabbansu Shukla, Slavitz,
Usnanski, Wiznooki, and Tibbor Capu,
each represent nations participating in
a crude orbital mission with Axiom for
the first time. Axiom Space takes pride
in this growing international
collaboration. Lucy Low, Axiom's chief
scientist, highlighted that these
missions have now represented 11
different nations, emphasizing that they
are creating opportunities for countries
previously excluded from direct access
to space. The Axe 4 mission will also
support a record- setting 60 science
investigations involving researchers
from 31 countries. These experiments
will explore a wide range of objectives,
including the impact of microgravity on
cognitive performance and motor
function, radiation exposure monitoring,
and environmental data collection aboard
the ISS. Collaborative studies with both
India's ISRO and Europe's are also
included, reinforcing the mission's
global significance. Once in orbit, the
AX4 crew is expected to spend 2 weeks
aboard the International Space Station.
Their stay will not only facilitate
important scientific work but also
provide operational experience that will
inform the development of Axiom's own
commercial space station in the near
future. For SpaceX, this will be the
third crude launch of the year following
Crew 10 and FRAM 2 with several more
missions scheduled before the year's
end. Crew Dragon is on track to achieve
its busiest year yet, further
reinforcing its position as one of the
most reliable and versatile spacecraft
in the industry. As the countdown
continues, all eyes will be on this
important step forward for commercial
space
flight. Now, let's shift our gears for
an important update on NASA's Psyche
mission. On the 29th of April, NASA
reported an issue with the spacecraft's
solar electric propulsion system, which
plays a critical role in guiding Psyche
to its target, a metalrich asteroid
located in the asteroid belt. The
spacecraft, which launched aboard a
SpaceX Falcon Heavy in October of 2023,
is currently about 238 million
kilometers or 150 million miles from
Earth. According to NASA, the anomaly
involves a drop in pressure within the
Xenon fuel line that supplies the
electric thrusters. On the 1st of April,
the onboard systems detected that
pressure had fallen from 36 PSI to 26,
prompting mission controllers to shut
down the thrusters as a precautionary
measure. The initial analysis points to
insufficient pressure to effectively
push xenon into the propulsion system,
hindering thrust generation. To
understand the issue more clearly, it
helps to know how the propulsion system
works. Psyche relies on solar arrays to
gather sunlight and convert it into
electricity. This electricity powers an
ion propulsion system, which creates an
electromagnetic field that expels
charged xenon atoms, producing gentle
but efficient thrust. It's a cuttingedge
approach that allows spacecraft to reach
distant destinations using far less fuel
than traditional chemical rockets.
However, this is the first time such a
system is being used beyond lunar orbit,
adding a layer of complexity. With the
thrusters offline, engineers are now
evaluating options. NASA mentioned the
spacecraft has two identical xenon fuel
lines and the team may choose to switch
to the backup line to restore
propulsion. For now, thrusting has been
deferred while investigations continue.
The temporary loss of propulsion has
raised some concern, particularly about
maintaining the mission timeline. Psyche
is scheduled to fly by Mars in spring of
2026 for a gravity assist and eventually
arrive at the asteroid Psyche in 2029.
If the issue persists beyond midJune,
there could be impacts on the mission's
path or timing. Despite the setback,
NASA's engineering teams are well
equipped to tackle the challenge. Their
next steps will be crucial in ensuring
that Psyche stays on course. As always,
we'll be keeping a close eye on
developments. So stay tuned to see how
NASA responds and what solutions they
implement to get the spacecraft back on
track. This has been Kevin with Great
SpaceX. Don't forget to like the video
and subscribe if you haven't already to
stay up to date with yours truly in the
latest details of SpaceX's progress.
Thank you so much for tuning in and
remember, curiosity, imagination, and
inspiration will always follow you as
long as you keep looking up.