Josh is discussing the renovation of a property, which appears to be his first property he bought at the age of 23. They provide a walkthrough of the rooms, detailing changes made and plans for each space. Josh mentions updating fixtures and appliances, repainting, replacing flooring, and adding modern touches. Josh emphasizes practicality over luxury in certain aspects, such as using peel-and-stick materials for the kitchen and bathroom surfaces. He also discuss the importance of durability in items like ceiling fans and vents for rental properties. Overall, they express satisfaction with the progress and look forward to seeing how the project unfolds. ( This was recorded in 2020 )
Connect with me on Instagram: / joshvillareal
Disclaimer: The information provided in this video is for entertainment purposes only and is not meant to take the place of professional legal, accounting, or financial advice. #finance#loans#business
It's my first flip.
Here you go.
So where's the light in here?
Oh.
There's not that much light in here. Okay.
Well.
This thing's made out of wood.
Look at that.
And then this is a real fireplace made out of brick.
Fireplace still works.
This is
the studio.
It's kind of weird. It's a sliding door.
We're going to put up a wall right here.
And then
this is going to be its own unit.
It had the public high school ceiling.
I just repainted it because we're going to do
a lot more work when the permits
are done. So right now
the tenants are going to be living in here for about
five months and I gave them a good deal
on it because right after that
they have to move into this one.
The two bedroom, one bath instead.
And then we're going to be working on this for
about a month hopefully.
Timelines are crazy but that's
the plan. That's the plan.
Couldn't find long enough blinds
but I already talked
to the tenants and they're just going to get a nice
curtain rod. $15-$20 from Amazon.
Yeah they're going to have some nice shade.
Repainted everything. This used to be
like a gold trim
but now it is a
matte black finish.
We didn't get to redo the tile so we just
left it. A functional stack right?
You can put stuff on it. Now we just found
out recently that these are
mahogany pillars.
Which is crazy. Yeah definitely
going to keep those. Yeah we refinished it a little
bit. And now
this is the master bedroom bathroom.
Refinished this myself.
There's the
brush bronze fixtures.
This thing was giving me some problems.
So when we demoed the floor
there was about this
thick worth of
tile. It was the
old school Spanish tile I think.
And then that means when we
put this thing under
alignment and the vinyl
luxury vinyl plank it
kind of made it difficult
to put this toilet on.
My flooring guy couldn't do it because he was super
busy right after it. Shout out to
Omar Vasquez Flooring LLC.
He did a phenomenal job.
He did everything for about
1400 square feet in about
4 days. And he's only charging
$1.30. You cannot beat that
price. He's a really ambitious dude.
Good guy. Good vibes. Everything.
Always on time. So I had to
do this myself. So I basically
put some leftover flooring
from this. And then I outlined
it. I cut it off. I had to
buy a hammer drill or
impact drill because I had to
nail them or screw them
into the concrete so they
don't move at all because if this moves
a little bit
you might have poop going everywhere.
And we don't want that. Nailed it down.
This was probably like a 3 hour
journey to get
it right here. Looks pretty nice.
Could have finished it off a little bit better.
But no one is really gonna tell
because it's camouflaged really nice
into the floor. I forgot to hook that up
yesterday. So that's great.
This is the closet.
I really like this closet.
A lot of space. The flooring, the
baseboard, and then just the all
bright white. Looks great.
And then new blue light.
Oh yeah. And then in the beginning
I was gonna tell you guys what
happened. Thank you for staying tuned
throughout the whole video. All of this right
here needed to be demoed.
Right? All the flooring. So again
there was about this thick. So it
turned out there was about
4 tons of
the demo stuff. Carpet,
the tile, and then
some other stuff. So what happened was
I was talking to a lot of people
about getting a good price and great quality
so I hit this company up.
They came here, did a bid. I was like
hey I'm trying to beat my $1.30
right now. Do you think you can do better?
And then he was like I can't
right now but I can
probably do it on the side if that's
cool with you. And then I'm like well what does
that mean? And what he was
saying was that the company
that he works for, they're definitely
not gonna do it. They usually charge about $2
a square foot. But he
himself can do it for $1.20
but it's not gonna be a priority.
Well he didn't really say that.
He just said on the side. $1.20
he was like yeah but the thing
is you can't tell the people that I
work for and your consultant
it's just gonna be between
me and you. I'm like hmm
sounds good.
So naive.
And then so what ended up happening is
we agreed on okay this
is pretty easy. We'll probably
get everything demoed out in a day.
It's a pretty easy job
and then we can get the flooring
done within 2 days.
At most
we'll probably be here for 5-7 days
and we can start maybe
like 3 days from now.
And then I was like yeah
perfect cool. And then
he was like okay so the only thing
I'm gonna need is a $500
deposit. I'm like okay cool.
So I took out the cash
and paid him in cash.
And then
I think I paid him
some material costs too.
Could be a couple hundred dollars.
But yeah
they did come here but
it would be sporadic. They'll come here for a day
and then they wouldn't be here
the next 2. Then they're here for
2 straight days and then they're not here
for 3 days. And eventually
the 5-7 days became
about 15 days.
And then at that point I was
like alright.
So they just demoed maybe 80%
of it and left the whole
kitchen and the bathrooms
just everywhere.
And then the debris was outside.
All the demo stuff
the 4 tons was just outside.
And then I'm like
I already agreed that my tenants are gonna
be here on a certain date and
I'm not gonna be able to reach that
because of what they're doing.
They're really making it a side gig.
But that's not what they
really communicated to me.
So basically
$500. They demoed everything
but then left it.
And then the $500
also was supposed to include
taking it to the dump
and all the fees and stuff.
That also came out of my pocket which was
about $300 because 4 tons is
a lot of debris to
take to the dump.
They just left me high and dry.
And I had to scramble
and that's how I found Omar.
Awesome dude. Really good work.
He was working for maybe 18 hours a day.
No I'm not 18.
12 to 16 hours at most.
And then with that being said
I also had to put in
a couple
16 hour days.
One of them
I was probably here for 20 hours because
they made everything
behind because
I had to wait. I couldn't paint or
I couldn't do some things
because they were working
on it or I thought they were going to be working on it
that day so it was just
two weeks of basically doing
little stuff. And then I had to
catch up within a week.
So yep.
I got this house
on September
10th
and it is September 7th
now so about 27
days to get everything done.
Which I could have easily done in
two weeks or less.
Probably less. And the next thing that we're going to do
is
the other house.
Which is right now
it's a three bedroom two bath but there's
two living rooms
or one's a family room one's a living room
so I'm going to convert one of those
or the family room
into another bedroom so
technically a four bedroom two
bathroom
about
1,800-1,900 square feet.
It's right there.
That one. That's what it looks like.
This is my rental.
Yeah let me know what you think.
Alright just
finished painting
and there.