World's Tallest Bridge Construction || Mallow Viaduct Bridge || English

Hightech Road Bridge
22 followers
14 Video Views·Sep 10, 2024
Engineers risked their lives to build the tallest pillars in the world.
But now, the matter of connecting them was on their neck.
During the construction of the world's highest Malawian viaduct bridge in France,
engineers now faced a major problem. Deep in the 100-feet mountains,
traffic from northern France had to descend the zigzag road and then climb back up again.
I was stuck in traffic for at least six hours. So, the French government planned to build a
motorway from Paris to Spain to facilitate tourists. There was a dead end, a 1500-foot
mountain with a 10-river running through. The only way to bypass this predicament was to build
a bridge as high as a mountain. But that was easier said than done.
Not possible because in the 1980s, when the project was being built,
the tallest bridge in the world was the Golden Gate Bridge in California.
One was a suspension bridge and the other was only up to 250 feet above water level.
The height of the road, saying that it is six times longer than the mountains.
Several experts said that a bridge cannot be built on Malawi and even if a bridge is built
that high, it would be a tantamount to inviting a huge accident.
The dream remained. But when the traffic jams finally became too much, the French government
had no choice but to swallow the bitter pill. From design to construction of the bridge,
the engineering team faced three daunting challenges. The first is to build the tallest
bridge towers in the world, that too on the slopes of the mountains. And the second is to
build a four-lane highway, waving 36,000 tons on top of it. Sections of the road were to built
over them. The tonnage of the road section between the two pillars can be lifted up
to a height of 800 feet. If a part of the road was pulled by placing a crane on top of two pillars,
the reason for the height of the pillars was explained, will easily fall inward.
The higher the pillar, the weaker the upper ridge. The problem was nothing short of a
nightmare for the construction team. And with each passing day, the construction company was
facing $30,000 in fines. Welcome back today for documentary videos.
It was made at no cost. It stands at a height of 1,125 feet from the ground. It is a marvel
of the engineering world. It is 45 feet taller than the Eiffel Tower. He appreciated the construction
of this bridge. He was actually overwhelmed by the project. Landslides in the valleys of France
and gale force winds of the hour at 31 kilometers were pushing his work from difficult to impossible.
A four-lane highway has never been built before and no one dared to build it because everyone
knows it that the Malawi by addict pushed the limits of engineering. Not only the cross but
the construction of the bridge on the other side has become a compulsion of the French government.
During the holiday season, this traffic passed through all the cities and jammed the streets of
each city, especially Malawi. Erecting steel poles on the 15th and 3rd bridges,
twice as heavy as the 3080 and all of which had to raised several hundred feet off the ground.
The world's best architect, Lord Norman Foster, was hired for the job. He made his name. His task
was to design a bridge that was as delicate as a butterfly but could support thousands of tons in
high winds. After Lord Norman Foster's design was on the drawing board, his reputation suffered a
major blow. A few years ago, he also designed London's famous Millennium footbridge in the
year 2000 when the bridge was opened to the public. When the bridge was opened to the public,
it began to sway completely due to human traffic. There was a huge but hidden flaw in the design.
It cost 5 million pounds. If a similar design flaw from the Millennium bridge were to be released
It would be difficult to predict the destruction. After years of hard work,
Foster had come up with a brilliant design, went and the road above it would be in the form of a
curb. But the problem was that pillar number two would be the tallest while the remaining six
pillars would be built on a slope. Those who praised the construction of this bridge find
That is about 2 million rupees. After a deadline of only 4 years, 25 lakhs for every passing day,
the construction of this bridge has been going on for 120 years. Construction begins with the
foundations of the pillars. But as the roads, bad news came from a geologist who warned that
the limestone beneath the area had broken. Because of this, there are many empty spaces between the
rocks, creating caves in these cavities where a unique type of bacteria lives. The most perfect
is not to build the foundation of the highest bridge in the world. Geologists have revealed
the risk of landslides during drilling and excavation here. Despite all these warnings,
the foundation stone laying work was started. But then what was feared happened. A dramatic
twist in the construction of the Malawi Viaduct. A dangerous landslide. Fortunately, there was no
damage. The construction team stabilized the slope with cement and continued the project
by constructing the main pillars along the bridge with approximately 2 lakh tons of concrete.
A factory was built on the site to meet this requirement. It used recycled concrete with
16,000 tons of steel bars to be used. This means that from Dubai to China. The architect's design
was at the throat of the construction team. At this point, he thought he had made a mistake in
taking his plan. The problem was the shape of the pillars was not uniform. It was not uniform,
thicker at the bottom and thinner at the top. At one time, only a 4-meter section pillar was made.
A heavy steel frame was made into a die. Then concrete was poured inside. And then the die was
removed for the next 4 meters. Then another form of die was installed, weighing 15,000 tons.
And considerable time was lost in repeatedly mounting and dismounting that die. But the
engineering team's problems weren't the only one. The location of each pillar, if the pinpoint is
not in place, the road segment placed above it will never be straight. If built, it will create
a gap of 6 meters at the top of this pin. GPS technology was used for point accuracy with the
help of mobile satellites in the sky. The pinpoint accuracy of the pillar was determined and the
foundation was placed there and GPS was also used during the casting of the filler. So that the
upper part of it can be corrected. The pillar is exactly where it should be. Months passed and then
in November 2003, the 7 pillars reached their final heights. 245-meter-long pillar number 2 became the
tallest pillar in the world. But after this achievement, they had no time to rest because
the next phase of the bridge construction was the most difficult. Laying a 2.5-kilometer stretch of
road at such a height was not a joke. Even a small mistake during this process can cost
lives and millions of dollars. Let us tell you that in the 1970s, 34 workers lost their lives
on the Brooklyn Bridge in New York and 35 workers on the Westcat Bridge in Australia. It was decided
to build in sections and the Eiffel Steel Works, several hundred kilometers away, was the only
company capable of making such large steel sections for the job. The parts were also made
of different designs. Each part weighed 90 tons and they were made with such precision that not
even a single ball could make a difference. The cutting and welding work was difficult but now
the challenge is to build several roads to reach the construction site kilometers away. Bring the
police along and convey the road sections one by one. Over 2,000 steel parts to safely transport
all these parts to the construction site. The plan was to weld all these steel sections and slide
them over the pillars as in normal bridge construction. But the wire grooves were not
quite normal. The distance between the pillars in meters is 342 meters. Even if they don't fall down,
sliding road sections on such high pillars will cause the pillars to fall one by one.
This problem was on the neck of the construction team. Inventing was needed. Here came the idea to
a senior engineer from the construction team. The entire table will also move. But if the box is
placed on the top of the table, the table will not move. Using the same laws of physics, it was decided
to install a system on top of the Melawe deck pillars that would lift and cover the roadway
so that the force exerted by the mountain would not be applied directly to the pillars.
For this work, temporary steel structures were also constructed at a distance of 170 meters
between the pillars, which will bear half the weight of the road section.
This new system was a prototype of sorts and there was no time to test it. The future of the
world's tallest bridge hangs on just one prototype. February 26, 2003 was an important day for the
construction team. Today was the day their years of hard work were to be put to the test on the
same day as the pillars and road sections. The hydraulic ramp system mounted on top of the
pillars and the strength of the new system was intended to lift all the ramps simultaneously
at the same speed on the road section. If there was even a slight difference in the alignment,
if it does, the entire weight will fall on one pillar, and the entire bridge may collapse.
All this was done with an eye to the weather. Only three days were chosen where there was
no chance of high winds, for the simple reason that high winds could easily collapse the bridges,
especially when the road and the part suspended in the wind unsupported in 1940. The columns of
the Tacoma Narrow Suspension Bridge in Washington State were blocking the wind,
causing the entire bridge to sway violently. A few days after the launch, the entire bridge
collapsed. As the days went by, the work of putting the road section on top of the pillars
was going in full swing. By May 2004, both sections of the road had been laid,
leaving only the section above the river. If this last section did not settle properly,
so all the hard work will be multiplied by zero. This part is also getting road cred. So,
it is very important to sit in the pinpoint location. The whole of France was watching
the movement on live broadcast, while the French Prime Minister himself was present.
Hydraulic ramp button pressed last time. For the first time in four years, the roads in the
northern and southern parts have been connected. After aligning the road with 99.9% accuracy,
90 meters high steel pylons were also installed by additional support. There was one toller which
weighed 700 tons, and there were seven such tollers. This is the first attempt in the world
to install such heavy pylons at such a height, which increased the total weight of the road by
10,000 tons to 50,000 tons. We tell you that this weight is equivalent to the weight of 1200
wattons of a large cruise ship. To test its strength, 28 trucks were driven on it and at
the same time, surprisingly, a section of road that was designed to sink by 50 cm sank only 25
cm under the weight of all these trucks. On 16 December 2004, the Malave Viaduct was opened to
the public for the first time. It was the result of the hard work of the engineering team who
worked day and night to build the tallest bridge in the world, but completed the work ahead of
time. A new record was set. Thanks for watching our video. Make sure you subscribe to our channel
and press the bell icon as well. Thank you for watching. See you next time in our next video.