Hello friends, welcome all of you to Knowledge of Channel.
Let's Learn Together. In today's
video, we are going to see how to make column footing and
bar bending schedule of columns.
Today we will
talk about bar bending schedule. Bar bending
schedule of columns. Fitting and Column:
First of all you have to understand the format of bar cutting schedule.
Serial
number, particular number of structure, bar
numbers, bar diameter, cutting length, total cutting length
and this bar diameter is 6 AA 8 AA 10 AA 12
AA 16. AA 20 AA 25 AA 32 AA So there is a
formula for this and if we
enter the formula then that particular length
of that bar goes into the cutting lane total cutting lane
like this see if in g19 g1 means total
cutting lane comma after this e1 mbl. diameter
of bar e1 e equal to h1 if it is of 6 m
if it has 6
then bucket complete double bucket in m total cutting
a here not of 6 12 is applicable1
m ill to sorry earn
in ya 12 in e means ya your
Which means the diameter is 12, so it will come to 12,
so into G 9G means it has come into its own, so
according to that, this is the formula, so
from this formula, now it has 12 mm, so the
length of 12 AM has come here where 8 mm. Here it is
8 mm, here it is 16, here it is 16,
here it is 20, here it is 20, so this is the standard
format formula, you
can give it directly, you
can use it to calculate the total in excel again and again,
so first of all Let's start with the column
fitting. Now there is a given column fitting.
See 1.2 and 1.5 and the column is Ba and this is
given in the section. See 1.5 meter. Here
give the diameter of two types A and B.
So the main diameter is 12 A
center two. Center ya which is a bar ya
can also be seen in this a bar
1 s center to center in 12 sections so
how will the number of bars come in it now how will the number of bars
come ya total length is Apna
1.5 divide minus
cover diva
ba psv on both the sides Total numbers have come, this is 12 am
diameter and how is the cutting length arrived at? This is
1.2. This is the length minus the cover on both sides.
055 ४ 1 means what has been added. This is the lane plus 1 +
1 am. This is the edge on both sides. 1
1 -2 * This is There are two bends, so
012, 2d on both sides, 2d is subtracted from both sides,
so this is your
1.22 and the total cutting length is A means
Y in D means number of burrs in cutting length
into number of structure, so this is the total cutting
length. Went here and came here according to the formula,
according to what I had just talked to you, now the distribution bar b,
how many numbers will come in it, 1.2 minus the
cover of both the sides, 055 diva ba, 150 pv means no bars will
come, how will be its cutting length,
1.5 means this. In the direction 1.5 minus
both sides
055 p p p p w This is L
1.1 -2d m 2 * -2 * According to this, 1.55 has
come, according to this, the length of this bar and this
bar of footing has been found out. Now we will calculate the
column. We will talk about the column of 3/4, in this
four numbers are of 20 mm diameter and four numbers are of
16 mm diameter and the ring which is or
staircase which is 8 mm is 150 center to center,
so accordingly you will see
four vertical bars. The diameter of number 20 A is now we have
considered 5 meter length. In 5 meter
-05 is covered below minus one bend is A.
So P3 in 3 is the bend. According to this,
5.26 cm is also the number four of 16 A. The same will come
5 -05
-12
-1 Mine
P
5.26 Now the size of the stirrer ups is like this
A2
32 So how will the numbers of the stirr come 5.3 Mine
cover diva is 150 center to center Pw 36
numbers Aag 8 A Now its cutting length Cutting
length How to calculate 2 in 32 P
22 Ps 18 Because this is the total, if we
take its total pulse, its 18 is two, then it is 232 P P 18
808 P 1.26 According to this, its total
cutting length, total cutting length is this much, so
it is 8 MK. According to this,
we have totaled the total of column and column cutting here,
total sum of all, sum of all, how much is the total,
after that what is its weight, weight in kg, meter per
kg, diameter of all
is given, so according to that,
this is now 8A or 12A, 16A, see, 8A, 12A,
16A, 20A, total weight has come, I have
calculated it in 12600 42 kg, now if we go
step by step, then making this BBS bar
bang shedle is very easy, so
friends, here is our today's. Video:
How did you like today's video? Please do comment if you
like it. If
you are watching my channel for the first time then please subscribe to my channel
and press the bell icon on the side
so that
you can get notification of all my upcoming videos.
Thank you.