An investigation into the greatest man-made structures of all time, exploring how new materials and construction techniques have allowed engineers, builders, and architects to work to the limits of their ability. The series focuses on the buildings that re-wrote the rulebook and the architects, engineers, and builders who made the impossible possible.
Content Provided by TVF International. Any queries please contact us at [email protected]
Subscribe to Spark for more amazing science, tech and engineering videos - https://goo.gl/LIrlur
Building bridges, especially across water,
has been one of man's most enduring challenges.
Of all the different forms of bridge design,
the most famous is the suspension bridge.
In this program, we admire the slender elegance
of the Swiss Bay Bridge in the Czech Republic,
stand in awe of the vast new Storbelt Bridge in Denmark,
but we start in England with the finest work
of one of the fathers of modern engineering.
This is the Clifton Suspension Bridge near Bristol,
a 19th century engineering masterpiece.
214 meters long, it was the challenge of a lifetime
for one of Britain's greatest engineers,
Isambard Kingdom Brunel.
He described it fondly as,
"'My darling, my first child,'
even though there were many difficulties
in the history of its construction."
In 1829, the city fathers of Bristol
announced a competition to design a suspension bridge
crossing the Avon Gorge.
They'd been considering a bridge for many years,
but it was only with the development of wrought iron
that an affordable crossing could be built.
After much deliberation, the contract was awarded
to the 24-year-old Brunel.
Although young, he had already notched up
several years' experience working for his father,
himself a renowned engineer.
But this was his first bridge.
This is how a suspension bridge works.
Two towers, one at either end,
support a heavy cable or chain across the middle.
This is the most important part of the bridge.
It's really heavy, and as its weight pulls it down,
it tries to drag the towers inwards.
So it has to be anchored at both ends.
Hangers are attached to the cable
along the length of the bridge.
And the deck is assembled last.
It's a really simple concept,
and it can be used to span huge distances.
But it's the anchors which are critical
to holding the bridge in position.
This is the top of the anchor point
where the chains meet the ground
and are anchored back into the rock
20 meters away down there.
Beyond here, the chains are splayed out like a fan
so that when they're pulled back towards the bridge,
they lock solid.
There are three chains on each side of the bridge.
Each link is eight meters long,
and it's made up of between 10 and 12
flat metal plates like this.
They're like giant spanners bolted together at each end.
They built the chains in situ,
starting one plate thick
and then adding the parallel links in succession.
They're the heaviest part of the bridge.
Between the piers, the chains weigh 550 tons.
The vast weight of the chains
is supported on the two huge piers.
And at the point where the chains and piers meet
are the saddles.
This is the saddle room at the top of one of the piers.
And these saddles carry the huge forces from the chains
pulling downwards into the stone pier beneath us.
The saddle itself sits on roller bearings
so it can move backwards and forwards just a little bit
as the chains expand and contract.
At each joint of the chains are the vertical suspension rods
which take the weight of the deck.
You can see that each rod is joined to a different chain,
either the top, the middle, or the bottom one,
sharing the load of the deck between them.
This is one of the cradles under the bridge
used for maintenance.
And you can really get an idea of the size of the gorge
they were trying to cross.
Above me is the heavy wooden deck of the bridge
supported on these lattice girders.
There's very little other bracing.
A suspension bridge is exactly what it says.
It's suspended.
And you can really feel it move up and down
as the traffic comes on above.
Many events conspired to delay construction.
Brunel oversaw the erection of the two piers at either end.
But in 1843, work stopped due to financial difficulties.
By the time they restarted, Brunel had died.
During the decades of inactivity on the bridge,
Brunel would go on to many other
remarkable engineering achievements.
But he never lived to see his favorite bridge finished.
When the bridge was complete,
it was decided to do a load test to measure its deflection.
500 tons of stone was spread over the roadway
and it sagged just seven inches, 175 millimeters.
It was 1864 and the bridge,
which had taken 33 years to complete
and outlived its designer, was ready for opening.
The challenges overcoming the construction
of the Clifton Suspension Bridge
are summed up in this Latin inscription.
It means a suspended way made with difficulty.
The bridge is in as good a condition now
as it was when it was first opened
and is still in regular use.
It stands as a testament to the achievements
of the Victorian engineers and in particular
to the brilliance of Isambard Kingdom Brunel.
Although the principle of the suspension bridge
has remained unchanged, advances in modern materials
and techniques have enabled us to build bridges
with spans that dwarf their predecessors.
This is the Storbelt Suspension Bridge in Denmark,
one part of the Storbelt Crossing
that links Copenhagen to the mainland.
The construction of the crossing
was one of the world's largest engineering projects
of the 1990s.
The entire crossing is 17 kilometers long.
There's three main elements, a tunnel, the West Bridge,
and what we've come to look at, the East Bridge.
With its total length of 6.8 kilometers,
it's the longest suspension bridge in Europe.
Hi.
16,000 cars are expected to cross this bridge every day.
It'll pay off the cost of construction by 2012.
The bridge has a main span of 1,624 meters
with two side spans of 535 meters
and 23 approach spans totaling 4,000 meters.
It took seven years to build.
It works on exactly the same principle
as the Clifton Suspension Bridge.
The deck hangs from the great cables
which run over the piers
and the cables are anchored at each end
to huge concrete blocks like this one here.
The towering piers are made from reinforced concrete
and their main function is to support the cables at the top.
They were cast in molds which moved up in stages
as the concrete cured.
The piers are among the tallest of any bridge in the world.
At 254 meters high,
they exceed the height of the Golden Gate Bridge by 26 meters.
The A-shaped design of the piers is really very simple.
Two large cross beams connect the legs together
but the only restraint the legs provide to the deck
is to prevent it moving from side to side.
Fortunately, there are lifts inside the piers
to get up to the top.
This is one of the giant saddles.
There are two at the top of each pier
over which the cables run down towards the deck below.
A bridge on this scale is only possible
because of the extraordinary advances in materials
and construction technology in recent years.
These, the cables, are the essential element
of any modern suspension bridge.
Inside this protective casing are 18,648 wires,
each five millimeters in diameter,
made of ultra-high-strength steel.
The cables supporting the deck are three kilometers long
and the strength of the steel is such
that each individual wire could carry the weight
of three large cars before it would break.
To get the cables up in position,
they first laid a thin pilot wire across the seabed
and winched it right up here.
And then they pulled the top of the piers back,
bending them like a ruler over a meter
to compensate for the weight of the cable,
which would tend to pull the tops
of the piers back inwards again.
The main cables were constructed using a process
known as cable spinning,
where four of the wires were laid out at a time.
Cable spinning went on 24 hours a day
and involved more than 9,000 journeys
up and down the bridge.
The cables were completed in just four months,
a remarkable achievement.
Once the cables were completed,
the deck could be assembled.
The box sections that make up the deck
were lifted up from barges using two cranes
supported on the main cables.
There were 56 standard sections prefabricated in Italy
and brought to Denmark on ships.
Each of them was 48 meters long and weighed 550 tons.
I'm right underneath the roadway inside the bridge
and it's like a gigantic hollow box section,
31 meters wide and four meters deep.
And this is where the bridge gets its stiffness,
solving the problem faced by the early bridge designers
a hundred years ago.
These trusses run right across the bridge
and they give it the twisting
or torsional stiffness it needs.
They act like walls, like this empty matchbox.
It's easy to twist without the draw inside,
but when I put the draw back in,
then it has a lot of twisting or torsional stiffness.
And that's because the walls at each end
hold the outer skin in place.
And that's really where the box gets its stiffness from.
At each end of the bridge deck,
you can see the huge hydraulic buffers
that allow slow movement of the bridge to take place,
like expansions due to temperature change.
But they'll lock solid
if there's any shock loading on the bridge,
like all the cars breaking suddenly on the deck above.
It's a bit like the way a seatbelt works.
You can lean forward slowly,
but if there's a sudden shock, it jams.
Usually when you drive over a bridge,
you can hear the clickety-click of the car
going over the expansion joints every so often.
These are the little gaps that allow the bridge
to swell or contract with changes in temperature.
On this bridge, there are no expansion joints
in the whole 2.7 kilometres of the steel deck,
and it's all taken here at each end
with one gigantic expansion joint
that can move up to a metre in both directions.
It works a bit like a concertina,
and each of the little joints stretches a little bit
to give it the movement it needs all together.
The anchor blocks for the bridge
were designed to minimise their appearance
using triangular concrete elements to anchor the cables.
They are wedge-shaped, and each one weighs 325,000 tonnes.
I'm inside one of the splay chambers
right at the bottom of the huge anchor block
at each end of the bridge.
It's like being at the bottom of some giant pyramid.
The splay chamber is where the wires
splay out in bunches from the cables
and are locked into the huge concrete anchor blocks,
transferring all the force from the weight of the bridge
into the foundation below.
These are the individual wires holding up the bridge,
and you can see how they're looped around
the cable shoe at the bottom,
and the cable shoe is bolted into the concrete foundation.
In fact, these wires are welded together,
so they're continuous,
and they're looped round and around the bridge.
If we were to lay out all the wire on the bridge end to end,
it would go round the world three times.
Underneath the splay chamber,
these are the other ends of the bolts
holding the wires and the cable shoes in place.
This is where the force has finally been transferred
into the huge concrete anchor block.
It's the end of the line, see?
No more force.
Bridges on this scale are not simply about
getting from A to B.
They're part of a much larger framework.
In the case of Storbelt, uniting two halves of a nation.
But this bridge is also an international achievement,
bringing together engineering expertise from many countries
to provide the best technical solutions.
So where does a suspension bridge go from here?
Perhaps we need to take a fresh look at the whole concept.
Bridges are a highly visible form of engineering design,
and it's important that they blend into their environment
in a sensitive and attractive way.
In a rural setting,
the suspension bridge has a clear advantage.
Its shape smoothly reflects the forces inside it,
like many plants and trees.
This is Lake Vranov in the Czech Republic,
a popular holiday resort.
Tourism is an important industry here,
and the local officials decided to replace the old ferry service
with a permanent crossing to make it easier to cross the lake.
The result was this beautiful and extremely slender suspension bridge
across an inlet of the lake called Swiss Bay.
It's a pedestrian bridge, completed in 1993,
and it links the restaurants of the small town of Vranov
to the beach on the other side of the lake.
The Swiss Bay Bridge stretches the concept of a suspension bridge
by finding new ways to stiffen the deck
without compromising its shape or proportions.
Like the other suspension bridges we've seen,
the deck hangs from the cables,
and the cables are anchored at each end.
What's special about this bridge is it's very thin,
quite unlike the chunky deck of a gigantic store belt.
As you can see, this deck is less than half a metre thick.
The deck's made of concrete sections, each three metres long,
precast and assembled here on site, suspended from these hangers.
But as suspension bridges get more slender,
they get more susceptible to wind-induced vibration,
just like the early suspension bridges last century,
and the spectacular collapse of the Tacoma Narrows Bridge in 1940.
In the wind, a thin bridge deck can bounce up and down.
Waves can form in the deck, a bit like this rope,
which are very uncomfortable for people on the bridge,
and in the extreme, can bring the bridge down.
This suspension bridge is different.
The deck on this bridge is being pulled down by cables running through it,
as well as being pulled up by the cables from which it hangs.
This system of pre-stressing the bridge gives it the stiffness it needs.
Other cables inside compress the deck along its length.
It's these internal cables that allow the bridge to be so slender.
Concrete is very strong in compression, but it cracks easily in tension.
Under normal circumstances, the flexible deck of a suspension bridge
would quickly crack a simple concrete slab,
leading to corrosion and possibly worse.
But if the concrete is already in compression,
using wires that run through it, especially for the purpose,
then when the deck bends, it won't crack,
giving it much more strength and rigidity.
Imagine that these chocolate biscuits are pieces of the bridge deck
hanging on the hangers.
Assembled in a line side by side,
they're quite loose and you can move them around easily.
But if we stretch a rubber band around them,
then they get compressed together and it makes a stiff beam.
That's exactly how the bridge deck works.
Once the concrete sections were hanging in position,
the wires were threaded through the deck.
Hydraulic jacks then pushed the concrete sections
tightly together into their arch shape.
Four of the wires in the deck were then tightened and locked off,
leaving the deck in compression.
The gap where the jacks had been was filled with concrete.
Once that had set, the last two wires were tightened,
pulling the whole deck down onto the abutments firmly.
The main stiffness of the bridge comes from the pre-stressing,
but there are other tricks too.
The deck narrows as it reaches the middle and flares out at each end.
This helps dramatically to increase its lateral stiffness
when blown by the wind.
The bridge gets even more stiffness by using inclined hangers
and an inverted V-shaped pylon at each end.
The triangular shape made by the pylon, the hangers and the deck
make it very difficult for the deck to sway from side to side or to twist.
The old rule of marching soldiers having to break step
when they crossed a suspension bridge for fear of destabilising it
was for good reason.
But computer simulations and wind tunnel models of this bridge
showed that the system of cables up above and in the deck
prevent it from moving almost completely,
even if it does start to vibrate,
so it can't possibly shake itself to bits.
Like the Clifton Suspension Bridge and Storbelt,
this bridge at Swiss Bay is exploiting one of the oldest of all bridge concepts,
the same principle as a simple rope bridge in the jungle.
For me, the suspension bridge is the most attractive of all bridge forms.
Like a hammock on a sunny afternoon,
it blends perfectly with its surroundings.
In our next programme, we travel to Italy to discover the origins of concrete
at the beautifully preserved Pozzuoli Amphitheatre near Naples,
and then to France, to the striking Plugastel Bridge near Brest.
And we stay in France to explore the remarkable design
of the new TGV station in Lyon.