A Day at Storrington Part 1

Magical Mirrors
232 followers
1 Video View·Jan 28, 2023
Hello, good morning, I'm Bradley from Tommy's Yard. I'm Tony from Tommy's Yard.
Sorry about the noise above, that's the sparkies.
It's always been noisy and messy.
Making loads of noise and mess. Boring, boring, boring.
Right, so today, what are we going to be doing Bradley?
Getting warm first of all, because it's absolutely freezing.
I thought we'd make this springy.
I know, it's nice and light, but it's cold.
It's about minus two.
I haven't undressed yet.
Well you can't undress then.
If I look fat, it's because I've got lots of layers on.
I was going to use that knife.
I second what he says.
Today's job, if you look Sam, we've dug all this floor out.
Ground floor of a lovely little cottage over in Storrington, West Sussex.
Sparkies have been in, got all their cables in, first fixed.
There's a wall going up here, so that's why that's there.
There's a wall going up there, so that's why it's there.
And we've got one going up through here.
We've got two doors in there, one into a toilet and one into a kitchen.
So if you can imagine, the wall's going to be there like that.
And the wall there like that.
So that's the bathroom, toilet, door there, and this is the kitchen area.
And this is going to be the main part of the kitchen here.
Yeah, I think we've got a little bit of an island going up here and whatnot, have we?
Yeah, so that's going to be it.
So we've got that stud wall going back up and that one there.
So that's what Brad was just telling you about, the stud wall which is going to run through here.
That's your toilet area there.
And then the door here walks into the kitchen diner.
So that was you being the wall and that was me being the wall?
Yeah, basically.
OK, right.
But we can't stay here forever because the missus will miss us.
Yeah.
And we'll make you do some work.
We'll make you do some work.
Right, so today, what we're going to do, what did Brad just say?
We've had to dig this out, a couple of reasons.
First reason, the pad was put down in the mid-1800s, we think.
That much concrete.
Yeah, and it was terrible. It was just crap.
Rubbish.
The whole way through, it was all split.
Second reason, we're putting wet underfloor heating throughout this property.
So obviously you've got to dig down for your insulation purposes.
So yeah, so that was the two reasons really.
And I think the guy actually probably went for the wet underfloor heating because the pad had to come up anyway.
So it was the only opportunity.
Yeah, Ruffles talked him into it.
Yeah, I think he talked me into it.
So what are we doing today, mate?
So first of all, we've got a 1200 gauge of membrane.
The process is, you've got a 1200 gauge of membrane down on the floor.
And you have a screed in sharp sand across the whole of the floor.
And you've got 70 mil of Sellotect insulation.
Then you've got your wet floor underfloor heating pipes.
And then you've got approximately 80 to 100 mil worth of top screed slash concrete.
It's a screed slash concrete base mix what we're using on this.
If we wasn't using that, then we would have to go with concrete and a screed.
But this mix is strong enough just to have that through as your pad.
It's 80, 100 mil and it's strong.
And to be perfectly honest, we didn't realise about that.
We didn't know about it.
We was going to go with concrete and then screed the pipes in,
flow screed as you normally do.
And the company come back to us and said they can do it the way we want to do it,
which helped us out.
So it's another little learning curve for us.
Less money for the client.
They get a little bit back.
And obviously the price for the alternative way, concrete and then a screed.
And it speeds up the job as well.
Because you can get on top of that flow screed within 48 hours.
You're right.
We're walking on it.
So our first job, obviously we've got to work through the whole
downstairs of this property.
We're not going to show all of that on camera because that would bore you to death.
What we're going to do is show you this kitchen section first of all.
The process of getting the membrane down, getting the screed down,
getting that level.
Because what we've got to make sure is when we screed that out of the sand,
that we're level.
Nile perfect.
Ready for the Sellotex insulation to sit on top nice and flat.
What you wouldn't want to do now is to sit your Sellotex on top of that
and then it would just be all over the place.
No, it's not really a good base to go down on with our underfloor heating either.
One, when you're walking over that Sellotex, it'll just start breaking up
and everything.
When you start putting your screed on top of it, it'll just be messy and horrible.
It doesn't look great.
It's not a great way to do it.
Tell them about the unevenness of the finished screed.
Yeah, what the plan was, throughout this property,
we're lower at the back of the property here than what we are at the front.
It's higher at the front.
Say that again.
Higher, lower.
It's not an aeroplane.
No, it's scales.
Scales.
That's what I was trying to do.
We want to be there.
So, we want to be there.
So, what we were doing, what we planned to do,
the customer originally thought we might have a step come through the door here.
But what we plan to do is get rid of the step
and have the whole pad the same level all the way through.
A couple of reasons.
One, it's better.
We don't want a step coming into the kitchen.
And the other thing is that if we run our underfloor heating
and over there we've got 100mm of screed
and over here we've got 40mm of screed, 50mm of screed,
then the underfloor heating is going to heat up throughout the property
at different rates, which we don't want to do.
You'll have cold spots in the floor.
So, we're going to do the whole lot as one level.
So, it's equal.
So, the top level is equal all the way through
so the floor heats up equal right across.
All it's going to basically do is bring us through
a little bit lower than we originally was in the front room.
But it's not the end of the world.
It's all being renewed anyway.
We can patch it up and make it good afterwards.
So, yeah.
So, that's the plan.
Shall we set the level up then?
Show them where we're going to be level-wise.
Yeah, I need something to sit this level on.
I might just make up a little bit of a sand pile here actually
just to sit it on.
All we do first of all is work out where we need to be level-wise.
We know this is our datum here.
Our finish line.
We're just below that threshold we believe.
We're just going to check it again.
We're just below that threshold here with our finish.
So, obviously we've got to work out how much sand we've got to put on,
allow for 70mm insulation,
and then allow for about 80 or 100mm screed
depending on where we are.
So, what do we need, Grant?
Our depth?
Our depth.
If you've got 80mm screed on top,
you're all right.
Pretty much bang on there, wouldn't it?
Plus 70mm.
Let's have a look over here.
Right.
We've got 70mm insulation, 80mm screed.
Are we above that step you want me to take a little bit off there?
Yeah.
Drop that level down a little bit.
Get your level, mate.
What you're doing is,
you've got to crane yourself a sand pile here,
and then the level sits on top of that,
and that will give him his government line that he's going to work to.
You've got to get these levels,
before it starts running,
you've got to get it level to start it off.
If it's on a little bit of a slant, it won't start.
So, we'll tell now.
I can see me beam over there.
I see it's levelling itself up now.
It's pulling itself in.
We'll have a look around that door.
What we don't want to do is come in.
That's about right, isn't it?
You see on that?
Return there, bro.
What we don't want to do is obviously come in any higher.
How are we there, mate?
You're a bit higher still, mate.
Where are we? Can you see it?
Yeah, you're on the bottom of the door.
Do you know what I want off that inch?
25mm lower or more?
Yeah, go about, yeah, try that.
Yeah, 20mm, 25mm.
We're trying to go as high as possible we can here
so we're not too low that side.
We've done this already.
We've gone over it with a level,
and we're thinking we've got to be about 40mm lower.
About 40mm lower that end.
But we're trying to pinch every mil we can this end.
That's it, it's calibrating itself.
Clever, isn't it?
It's always a user, isn't it?
It's never a tool, it's always a user.
That tool, there's a manufacturer default on that tool.
Don't give you instructions.
It tells you with an arrow.
Here we go, mate. Are we still on the door?
Oh, now I'm down, aren't I? I can see it.
You're still touching the door on the bottom.
Am I? So another, what, 20?
Yeah, 20.
No.
No, because you're off there. That door's a drink.
Is it really?
You're touching the door there, but we're not touching the door there.
We're going to get warm in a minute.
We'll start shoveling that sand away, won't we?
Labour, ain't it?
We've lost our labourer.
We've got no labourer.
Who's out there?
There's a man upstairs.
That's a spark. He's showing his personality.
He's having a bit of fun. That's a rarity.
That's good.
That'll be our finished screen, yeah?
Yeah, so that's going to be our finished product.
Yeah.
Obviously, it dips there.
Yeah.
If we look around the room...
If our finish is there, that's cool.
If we look around the room...
Where are we on that door there, Simon?
Yeah, we're...
That's the lowest.
Higher there, that's our point.
Whatever it is, it is there.
We'll just have to maybe...
What am I here?
I think it was, look, I'm about 50mm, we said, didn't we?
Yeah.
I'm where I want it to be.
If you have a look at what we were explaining earlier,
we're trying to pull this through at one level now.
So this was obviously our existing level.
If you turn your light down a little bit, Sam.
And then this is going to be now
our level where we're going to run through
with our new finished product.
It is a little bit lower, obviously,
but we can always make that good.
So as we were saying earlier,
that's going to do us two things.
We're going to now lose a step
from one side of the building to the other
and we're going to be consistent with our underfloor heating
the way it heats up,
which is perfect for us.
So that's where we're going to be finished at.
We'll take a few more measurements now.
Obviously when we're blinding this sand through
or filling the areas up,
like we call it blinding,
what we mean there is flattening it all out.
The sand's going to be different.
It could be 10mm in some places,
it could be 30mm in some places,
because obviously the floor at the minute is uneven.
So we'll take a few measurements.
I think what Brad will do,
because this is Brad's game to screen him really.
I'm following his lead a little bit on this.
No, no, no, start all over.
We'll get the measurements worked out.
260.
Where is that?
On the cellotex, mate.
What have we got?
70mm in the cellotex,
80mm screen.
We've got 260,
there's 150.
175 we want.
175?
What for?
100mm screen if we go 100mm.
Well we've got 70mm insulation, not 75.
Should we go 100mm or 80mm screen?
100mm screen then.
We can go 100mm.
So we've got 170.
How was we in the front room, do you remember?
Is that going right through?
On the low point in the front room?
So what we need to do now,
is try and catch that level.
We've got a bit of sand going over there then.
Where? Over there, yeah, 260.
We've got a fire going.
This is how we roll on site, look.
It's cold, isn't it?
We had a toaster as well.
This is our supplies room,
so this will be getting the same all the way through.
I think we're a little bit high,
we might have to skirf a little bit of that off, you know.
Or maybe not.
So we've got 260.
That's where we're coming through.
Measure that there a minute.
So I reckon you go 80mm.
I think that's right, 80mm screen on top, not 100mm.
Let's do this 20mm sand line over the top.
And then that'll bring us down a little bit.
We don't have to go high over here with sand.
Get a deep level of sand in it,
it'll gradually be about 20mm sand over here.
Yeah, it won't be much over here.
Can we do that then?
So we're now for 80mm screen,
70mm, 70mm.
Yeah?
150, top of sand.
Top of sand to laser level, 150.
Yeah?
You good with that?
Yeah, that's it.
Bring that up to 150.
So we're up there with the sand, are we?
90mm of sand over in that corner.
What are you over here?
170.
See the bottom of that tape?
Right, let's move this out of the way.
So, the bottom of our tape here now...
That's where the sand's going to come up to.
That's where we want our sand to come up to.
Then what we'll have is...
70mm.
70mm of our Sellotex, which will come up to there.
And then we're going to have 80mm screening,
which will then bring us up to 150.
So that's going to be our height all the way through.
Our sand, it's going to be deep in here,
it will dip down over there.
Because what we're trying to do is put it through.
We're going from that level here of sand,
and we're going to end up to about that.
At the back there.
And that will pull us through nice and level then.
Yeah, you good with that?
Yeah, I'm perfect with that, mate.
12 on the gauge of damper of membrane going on this.
Up the walls a little bit.
We're going out Saturday night,
so I've got to get rid of that.
You know what I mean?
Us boys are out on a razzle.
12 on a gauge of damper of membrane.
Then you sand, as I said, from there to there,
wherever it ends up.
Insulation, Sellotex 70mm.
And then we put a 500 gauge membrane
on top of that insulation.
And that acts as a slip mat for the underfloor heating.
And then the underfloor heating goes on,
and then 80mm of screed on top of that.
And that's it.
Shall we give him a talk about the underfloor heating
and how it works?
Yeah, we'll do that afterwards.
He'll talk you through that.
He's done a refresher course,
so he wants to show you his business.
Right, that's our date in there, mate.
That's top.
That's top, so I'm marking down from that.
So 150 from that, of course.
You know what we ain't got?
We ain't got a screeding ruler,
so I have to use a level.
You alright there, mate?
Yeah, I'm fine.
You getting stuck on that door?
I'm not stuck on the door.
As you can see,
as I slowly get undressed throughout the day,
I get right skinny.
Hey!
Look!
I'm half the man I used to be.
I'm not that tiny now.
I'm like 8 stone wet through.
Right, what we've got to do, Sam,
is a little bit upside down
and back to the front,
but what we had to do yesterday,
we had to bring this sand in.
