Copyright Disclaimer Under Section 107 of the Copyright Act 1976, allowance is made for "fair use" for purposes such as criticism, comment, news reporting, teaching, scholarship, and research. Fair use is a use permitted by copyright statute that might otherwise be infringing. Non-profit, educational or personal use tips the balance in the favor of fair use.
In today's video we
talk about PQC which
stands for Pavement Quality Concrete
When it comes to this type of road
Rigid Pavement
He is looking about him
First we will watch a practical video
PQC by Mechanical Pavement
How to do PQC from Pavement
Watch them
And about him
This is a practical video on PQC
These are what you are currently seeing
An exception to the Delhi-Mumbai
Express Highway is its length
The PQC is ongoing
This is the Mechanical Pavement you are seeing
This is the PQC being carried out from the Mechanical Pavement
And these PQC samples are take
This is fully concreted in front
And here you can see on the side
Here are the dowel bars
placed here you can see
And these dowel bars are placed during
PQC laying every 4.5
meters here as well
What the panel decides
is set in place
Outside dowel bars are installed
Here you can see
while it is in the PQC
Its generally PQC thickness is
300 mm and it is
every 4.5 meters
They insert dowel bars and
these are not dead words
This is the finishing part
That was the finishing part
This is now another project
You can see it here
This is PQC at night
They also do it in PQC Night
Because he has to keep track of the temperature
And they also perform
PQC during the night
You can see it here PQC has poured the entire concrete here
The PQC applied
to this is concrete
He lives in the M40 Grand
Pour the concrete and
then give this paper later
Leng moves forward
And after this the complete
finishing from behind
It keeps leveling up
and this is its stance
This is where the entire leveling and
finishing takes place and after that
A machine is used for texturing
and it also does texturing
When you can see it is
completely from the paper
As the village bar after it had closed
Pour the entire concrete into the hole
And they will take it and move forward
This is what looks like plastic
And these
grow cuttings
like PQC after
being in 4.5
He cuts it
pavement quality concrete
PQC
PQC is a cement concrete
intended mainly for rigid pigme
He is considered to have a large size aggregate according
to IRC specifications
And that is PQC dry lean concrete
And PQC is
generally applied on
M40 layer and its thickness is
It remains 300 mm
This includes DLC
and PKC in between
125 micron polyethylene sheet is
inserted as a
separation membrane
This is what
remains DLC
and PKC to stay separate
It is pouring down
on top of PKC
It occurs and these are PKC
M40 is located and
its design as per IRC
This includes 15-2002 PKC
is applied while working
They make panels of 4.5 m
and these are also 4.5 m
Panel has provision for
dowel bars
to be inserted
32 mm
make 300 mm
They fix it and
this is
every 4.5 m
They are placed on
joints
or on junctions generally
Mild steel round bars are available
These are mild steel round bars that remain after cutting
As one side is bounded and
the other side is bounded
Staying in
the transfer
joint is what they fix
It mainly facilitates partial steel load transfer
such as from one slab to
an adjacent slab such as bo
We cast them side by side for it
These are the ones
that are subjected to
axial thermal expansion
and also perform work
Such as axial thermal expansion
also works contraction of concrete
Then they are usually
mild steel bars
And the half side of it remains
covered and the half side is exposed
It stays in the concrete slab
and these are its main features
Mainly load transfer is one of
the main functions they perform
The end of the
pipe is covered with
a cap to keep it clean
And the other end
remains open
in concrete
So that it can allow the
movement mainly for the purpose of
avoiding the
settlement and cracking
of concrete due to settlement
Cracks that develop in
concrete can be avoided
Its main purpose
is to transfer wheel
load which is the load
on a vehicle's wheel
The main role of the dash bar is to
transfer across the
panel group cutting
Where only 4.5 m of water flows
through the dam's private gates
It is necessary to perform group cutting there
Why is group cutting
done to provide control
to joints in concrete
to create cracks
Avoid joints
there there are
joints group cutting
is done there
And this can
prevent long-term
damage to concrete
by reducing cracks
It can be controlled and this
is a group of joints whatever
The depth remains as per drawing
It is mentioned in it that it is the best
And after grouping there
is a sealant inside
It is applied like
gold polysulphide seala
This sealant is inside the group
Caring is very important
Some people are involved in caring
They use the Pounding method
They plant it as if it were made of gold
They apply this curing
compound in different methods
We saw that PKC's practical
video shows how
PKC does rain
These videos will cost you
money Definitely cut it
If you've just subscribed to my channel
Subscribe to my channel
But don't forget the first job of the side is to press
So that all my upcoming videos are
Your notification can be
received Thank you