How Service Businesses Operate Like a Production Line.
Business Ideas 2018.
Something I have noticed is that every service based business operates like a production line. They have work centres, capacity constraints, planning and production problems, not least filling up the production line with jobs and completing them on time.
Why on earth would you want to LOSE clients? It's quite simple really; life is too short. Some clients are a pain in the backside. Sometimes we simply don't have enough time in the day to service all of the clients we now have. Times change. Businesses change direction. Maybe our product changes and we need to head in a different direction. But, at some point, you will have to have some difficult conversations. Here is the why and over the next 7 days you'll get to know the how.
Welcome back to the seven day how to lose a client in seven days challenge. Today's topic
is something called the production line, which again is not about saying no to things,
or it's a little bit around understanding what capacity might be available in your
business to do things. But this actually works really well for creative agencies especially,
but anywhere where you've got a service which has multiple steps in the process,
because ultimately, and this is why it's so apt, with a production line there are so many
sort of components which you can squeeze into a production line in order to make your car,
or whatever the widget is at the other end. And a lot of moving parts happen in here,
which is what I'm going to try and explain to you now. These little boxes here are called
work centres. So if we were to think about website design, for example, it could be
taking the brief, could be going through the first stage of the design process,
maybe creating a prototype, maybe designing out some of the pages and then actually building it,
adding some of the content. So each one of those steps in that service, that process,
is called a work centre. Now at any one point in time, you can only push so much work through each
one of these work centres. Typically in service-based businesses, these work centres are
basically the people in the business. But it could be that maybe actually you outsource some of that
work. One of the problems, the biggest problems that I see in a lot of service-based businesses
is that this guy who's working on this work centre also every now and then has to go and
work on this work centre. And you can then see that it creates a break, a problem, here. Because
if he goes off and works down here on a different project, a different work centre,
there's nobody manning this bit of the project. And then all of a sudden,
all of the projects that stack up behind this one particular work centre stop. Now typically,
for most businesses, we tend to get the money either here, or we get 50% of it like a deposit
here, and then we get the rest of it here. So if at any point the work centre, the production line
stops, there's going to be a delay between us getting that money. Now when the work is actually
taking place, and this is a common mistake, people think that here is where it actually
costs us money. So this is like the time-based element of stuff getting done. But actually,
that's totally wrong. It's actually here that it costs us money. The time taken in between the
different steps of your customer journey, your process that you take to deliver your projects.
The longer this amount of time is, the longer it's going to take for you to get paid, and therefore
it takes more money. Because normally we can measure how long that work centre takes to
deliver, we can measure how long that work centre takes to deliver, we can measure how long that
takes to deliver. And delays tend to be, in here, the client. So if web design, if you're waiting
for a client to come back with some copy, you could be waiting eight weeks, but you don't want
that to affect your cash flow. At the end of the day, they talk about profit, turnover is vanity,
profit is sanity, and cash is king. I think cash is the most powerful thing in any business,
and if you're having to wait any extra time to get your cash because the client is being a dick,
then you need to do something about that. So have a look at the production line, and what I want you
to do in the worksheet is to identify what the work centres are within your business,
where bottlenecks tend to stack up. So this here is a bottleneck, where you are under-resourced
and your staff is spending time working on other things, or you're spending time working on other
things. And these other things could be marketing, sales, accounting, bookkeeping, any of those
things that aren't the three core primary functions of marketing, sales, and delivery, basically. So
this is still very much in the delivery space. This stuff, if you're a one-man band, could be
in the marketing, accounts, sales, systems space. But I want you to identify the work centres,
I want you to identify the bottlenecks, I want you to start to get a picture of
the capacity project which we did on day two, how that fits in with this, and how much you and your
staff are being under- or over-utilised. There is a magic number. The number is 72,
and that's actually 72%. You should never be working at 100% of your capacity. You should
only ever be working up to 72% of your capacity, and there's a very long-winded reason why that is,
which I can go into another time, possibly during the Q&A, I might take some time to explain that
number. But we never want to be working at full capacity. I mean, basically, the principle is
that if we're working at full capacity across all of our work centres, if something goes wrong,
we don't have any capacity to- well, we don't have any way of moving our capacity around.
Whereas what this extra 28% of efficiency or capacity does is it means that if we have a
bottleneck here, we can move some of this resource to help fix that bottleneck. That's the short
version of it. One of the key things to remember through the production line is what- ultimately,
this is the output. These are called the inputs. So what we don't want to be doing is just chucking
way too much input into our production line, because it would just clog up capacity.
Something which I've been told, and I tell a lot of people now, is slow down to speed up.
So we want to slow down the amount of work coming into the front end of our production line
to stick within this capacity figure here, 72% of efficiency, so that it allows our production
line just to flow. So yeah, so work centres, bottlenecks, where you and your staff are being
under- or over-utilised, and where you feel you might potentially be losing some money throughout
this process. So that is the production line. That's day five of the seven-day how to lose a
challenge, and I look forward to seeing you on day six.