Your queries How to read tender document Study of tender documents tender documents list tender documents examples sample tender document pdf tender documentation how to prepare tender documents pdf how to prepare a tender document tender document checklist tender document download How do you read a tender document What is included in tender documents How do you make a document tender What is meant by tender document Reading Tender Documents – What's Important how to analyse a tender document how to study
Note- NOTE: ALL THE IMAGES/PICTURES SHOWN IN THE VIDEO BELONGS TO THE RESPECTED OWNERS AND NOT ME... I AM NOT THE OWNER OF ANY PICTURES SHOWED IN THE VIDEO ---------------------------------------------------------------------------------------------------------
Copyright Disclaimer Under Section 107 of the Copyright Act 1976, allowance is made for "fair use" for purposes such as criticism, comment, news reporting, teaching, scholarship, and research. Fair use is a use permitted by copyright statute that might otherwise be infringing. Non-profit, educational or personal use tips the balance in the favor of fair use.
Hello friends welcome to the knowledgehub channel In this channel we discuss
general conditions of contract special conditions of contract and more
Then we talk about tender drawings In tender drawings
all the drawings of the project are kept Then we
talk about specifications In this the details of the
construction and execution of the tender are mentioned
Now if you want to see the specifications
then if it is civil it is different like MEP
HVAC Electrical Plumbing etc It is also
mentioned separately That detail is specification
Then there is bill of quantity or it is
called financial bid In bill of quantity the
whole detail is BOQ Like I'm talking about
atom rate tender In that
the whole BOQ is there
In the BOQ it is mentioned which item it is and what its quantity
is And if it is an atom rate then the rate is not mentioned
If it is a percentage rate then the rate is mentioned In
percentage we have to quote the plus or minus percentage
So first of all is Volume 1 Conditions Now
in conditions like now it is commercial
conditions it is technical In commercial we have to study the action related data
Whether we are qualified or not
Whether you have done this much quantity or not
Whether you have done this much value work in the last 3 years or no
So all these things are there
In that what is its EMD how much is it
So what is the mode of submission of EMD
How to submit is it cash bank guarantee
what is it That detail is there In that mobilization advance If mobilization
advance is there then what is the percentage
With interest or without interest
After that is secured advance
After that is machinery advance
If it is there or not
All these are there in commercial conditions
After that in technical how much machinery you have
How much manpower you have technical manpower And
after that they were mentioning some schedules So
according to those schedules you have to fill up all
that So whatever data you have company's credentials
That is also mentioned there So while
looking at the tender first of all
we need to take a notebook and a pen
Whatever conditions are clear in that
Like I just said EMD mobilization advance
Its recovery its interest rate After
that how is the project duration So we
have to note all this
And while noting this
Along with that we have to note the tender
conditions Are there any
special conditions So
we also have to note that In this
if there is a pre-bid meeting so in the pre-bid meeting
What are all the discussions in the pre-bid meeting
What are all the client's replies
That is called a corrigendum or addendum
We also have to note those points
So whatever pre-bid
reply corrigendum or addendum
is there we have to incorporate that while
working If you see out of date where is the
particular used Sometimes options are there
This or this So we have to check that as well Along with that
specifications drawings
and BOQ We have to
study this properly And
the addendum After collecting all of this
Along with that we have to start tender working
or rate analysis And one more important thing:
How is the mode of submission of tender Now
mostly tender is online submission or e-tender
So for e-tender submission how to upload
those documents we
have to check that also
so according to that we have to keep all our copies ready and
financial bid or BOQ
Generally when there is a
tender submission a little
before that everyone uploads financial bids or BOQ
rates So how to do that
also If we have to
take the key from the client we have to see about that key
Or we have to arrange it by consulting the IT
person because last time during online submission
the server went down or there was some problem so
there is a chance of missing the tender
So we have to do proper arrangement of that as well
So according to that
In document study
First of all Volume 1
General conditions special conditions
Whether it is commercial or technical
Along with tha
In the tender whatever client you are they ask for
your company's credentials
staff technical staff your
work done how much equipment
and machinery you have
they ask for that list you
have to prepare that data
Along with that you
have to see ongoing
projects or related to
site visit if something
is mentioned in that
you have to see that also in some tenders there is SOI data
Bore log is also provided
Bore log report
The site
The report of SOI investigation
You also need to check that
If there is a building tender
The area statement is included in it
So that area stateme
You have to cross check it
according to the drawing So
according to that Like now
Technical commercial Along
with checking these
conditions While
checking BOQ
Check every item properly According to that Basic rate
If something is mentioned
in that like ceramic
tile or vitrified tile
basic rate Rs
60 per foot If
something is mentioned
so according
to that while
analyzing that you have to check most important thing
If an escalation clause
is provided you have to
check that If the escalation
clause is applicable
If a formula is given you
have to check that also
So in short while studying
the tender document
Like technical commercial BOQ
Specification
Along with that
Other data
Like bore log data
Drawings All
these You have to
study carefully
Or make short notes
And study that So if you study
this properly You
will be able to
Analyze it properly and incorporate it in working
If there are pre-bid
points you will be able to
incorporate that also So while working we can do
competitive bidding So friends
this was our today's topic
How did you like today's
topic Please comment If you're watching my channel
for the first time please
subscribe and press the
bell icon so you can get notifications of all my
upcoming videos Thank you