#37 Raising the Stone Walls, Placing the Sky Light

capture the moments
102 followers
I have to fix the trailer.
The last time the wheel was really wobbling and that is because these holes are sort of...
They're slightly too big I think.
At least they're bigger now and they're kind of hollowing out as I ride.
So something needs to be done.
This wheel needs a lot of work.
It's kind of stuck now but I think I can reach the garage.
It's not safe.
This one is spinning freely.
This one is now stuck but the hole is too big.
But with a washer I kind of fixed it.
This one I can't get loose.
Okay, new inverter.
This is the inverter which makes 12 volts into 220 volts.
This one is 3000 watt instead of 1500, the previous one.
Because the miter saw together with the dust extractor was too much.
So now I have more power.
So in short the system again.
There are two separate systems.
This 12 volt battery array, solar charger, charge controller and the inverter.
That's one group and that powers the workshop and the cabins.
And the Blue Eddy is a system on itself.
It powers the tent and the kitchen area and the outdoor shower.
Rough night.
Temperature is dropping like seven degrees for this week.
Clear weather.
This was a stormy night.
I have to check the damage.
There's always some damage.
Everything's okay.
There's only a small branch that blew on the roof and there's a hole in one of the papers.
That's not okay.
Just a small hole.
It's always quite exciting this kind of weather though.
It gives me energy.
It gives me survival modes.
It's quite good.
I'm waking up.
So I'm creating buckets with all the same sizes of stones.
Because it's kind of building a Lego wall.
But then with a bigger variety of sizes of stone pieces.
So now I'm looking for these kind of sizes.
I have a bucket of very thin pieces.
And then on the scaffolding there's lots more bigger sizes.
It's really a puzzle.
So first part of the wall is done.
It's a little part I started here.
This was the first stone yesterday.
And yeah, it's really exciting.
So now you can also see how the roof is going to be finished on these sides.
This is the reason why I kept the roof sort of smaller inside the walls.
Because I didn't want to have a lot of wood visible here on the outside.
And now you only see the battens sticking out and the stone lying on top.
So Rick is painting these.
It's a lot of battens.
They will sit here.
It'll stick out just a little bit and they'll be placed every 25 centimeters.
Like that.
And then there's going to be another one going across here.
And on top of there is the sheet metal and then the stones.
And they stick out a little bit also.
And these are supported by the wall here.
You know, the bits that stick out.
So this is going to be built flush against all of the battens and in between here.
So I have to go all the way up.
And then also on the other side.
And the bits underneath the roof.
I'll do it when the scaffolding is gone because now I can't reach it.
It's a big job.
It's hard on the back because I have to work.
Pick up stones all the time.
But it's an enjoyable job.
It's very satisfying.
But it goes slow, you know.
You can't...
If you rush this, you'll just see it.
It's just not going to be beautiful.
Some people just came by bringing some cheese.
So they have this family farm and they make their own cheese and all kinds of products.
Nice.
It's nice packaging.
That smells very French.
Thank you guys.
Appreciate it.
One and a half day.
Or is it almost less actually?
Yes, but at some point you also get used to it.
And you also collect quite a few stones.
So that's extra work for the next time again.
Exactly.
Sometimes a big stone, that would be nice.
Big stones.
Yes, you want to have a bit of that variation between those many different sizes.
That's nice.
As a human being, of course, you tend to make a pattern very quickly.
Unpredictable.
Yes.
Morning.
The rain is taking longer than the weather app showed.
But it's been raining since yesterday.
So slow things down a little bit.
I was working on the roof window.
I'm trying to get it in place the coming days because I've got some help.
Rick is still here.
And tomorrow Tom is coming from outside.
Outside magazine.
He's writing a piece.
Because I need help carrying it in place.
Quite heavy.
All most of the other work I can do on my own.
But things are taking a bit longer therefore.
And I have the feeling things are taking longer as I thought they were going to take.
It always works like that with building projects, isn't it?
Although I don't have a planning.
If you don't have a planning, it's just a feeling that it takes too long.
And that's not a problem because I enjoy the work.
And I live day by day.
So that's the decision I made already before I bought this place.
I want to do this just in a relaxed way.
If you don't have a planning, the only problem can be the seasons.
Because some work you can't do in winter.
And that's a little bit of a problem coming up now.
Because the foundation work and the work on the wall, on the basement.
There's a bit more concrete and limecrete work to do.
The flooring, pointing of the walls, you know.
A lot of cement work.
And cement needs to dry properly at a certain temperature.
It can't be too cold.
And the night frost will come already in October.
So it's going to be tricky.
So that's the pressure I'm feeling now.
That I want to do that before winter.
Ding this out before also the ground gets frozen.
But I'm not sure if it's going to work out.
I might need to work with some heaters to do concrete.
And keep it heated while it's in its drying phase.
So that's a little bit tricky.
But other than that, you know, a rainy day is not a spoiler.
You just have to wait.
Do some other things.
Enjoy the beauty of the rain.
It's the mist.
The misty mountains are quite a sight.
So I always have to see the positive side of it.
Let's make some breakfast.
Bakkie do?
Yeah.
Bakkie is a cup of coffee.
Ah, yeah.
Sounds good.
Biscuits in that bag.
Oh, nice.
Canted oats.
Depending on which part of the wood.
Because this dries very dark, of course.
And this dries very light.
Watch the beams.
We have to pick it up.
Hold it on the brackets.
On the things.
Yeah.
Down a bit.
A bit towards you.
I'm almost in there.
How are you?
Almost.
Can I go down a bit?
Towards you guys.
I have to go that way a little bit.
Okay, cool.
Shall we have dinner?
Yeah.
What do you want?
We have some burgers.
We have some vegetables.
Tomatoes.
Do you want to make something?
I can make something.
I can keep painting.
Sunset.
Okay, now I'm gonna finish this one.
So roof light is in place.
It sits pretty high.
Let me explain how it's going to be layered.
Because it's going to be the sheet metal layers.
Two centimeters.
So that's about this size.
Yeah.
And then the stone will sit on top of that.
It will rest on the sheet metal there.
And then it will rest on another stone here.
The stone sides are about this thick.
Some are thicker.
Some are thinner.
And sometimes they're this size in length.
But they could be bigger as well.
So they come up quite a bit.
I think they'll be like that.
So that's pretty perfect I think.
Because they're flush with the window.
Or just above it.
So the trailer is also fixed.
I asked the mechanic to drill new holes.
And make a new bolt in there.
Because it was completely ruined.
The original holes were kind of like gotten way too big.
So that's why it was almost impossible to attach the wheel.
And also the bolts were ruined.
So new bolts.
New nuts.
And new holes.
It's really steady.
I wanted to talk a little bit about the next project.
After the roof is finished.
I think it'll take two more weeks to finish the roof.
But there are basically two challenges.
One is there's rainwater coming into the cabin.
Seeping through the walls.
Because they're built of stone and mud.
There's no barrier.
And the second thing is the structure.
Because I want to build a floor of 190.
So I'm able to walk underneath the beams.
But the walls are actually starting higher than I want the floor.
So I have to dig deep.
And basically work almost underneath the walls.
Which is very tricky.
So I have to build sort of concrete foundations.
To tuck in the walls.
And kind of like secure them into place.
So basically this is the current situation.
I've dug out quite a bit out of the basement.
And this is the height of the floor I wanted to have.
There's still a lot of dirt in here.
But I've stopped digging it out.
Because I need to dig it out first on the outside.
Otherwise you'll have a lot of pressure coming from this side.
And not from this side.
So there will be an unstable wall.
So once the scaffolding is gone I have to dig all of this out.
And then I'll be working on a situation something like this.
This is the first drawing.
So it will be dug out until the ground floor basically.
And then I'll build a concrete retaining wall against the cabin.
To make it waterproof.
Against that will be what's called an EPDM layer.
Which is sort of a tar layer.
To make it really waterproof.
And then at the bottom will be a French drain.
Which is basically a continuing pipe.
Not like this but continuing all around with holes in there.
So it will catch all the rainwater that goes down here.
And leads it towards the valley side.
So this wall is going to be all around the cabin until here.
And then the same on the inside.
I will build a sort of concrete smaller wall here.
Not underneath the wall but against it.
Now the tricky part is digging this all out.
Because let me just...
Here you go.
This is basically the walls.
It's kind of gassing still but I've been checking it.
Here the walls are sort of on the level of where I want the floor.
But on the hillside the wall starts higher.
So that's a bit of a challenge to dig this out.
And pour this concrete floor.
So then after this, after the concrete is hard.
This will be filled up with dirt again.
And you'll see nothing of it.
It will look from the outside the same as it currently looks.
You'll just see grass and stone.
So this is quite a big job.
And one of the challenges is doing it on time.
Because winter is going to come pretty soon.
And the problem is working with cement, concrete, lime, mortar.
All this stonework is difficult to do when it's cold.
The other option would be to do it in spring.
But then I have to wait until the ground thaws out.
Last year it was frozen until March, late March.
The ground was still frozen so you can't work with it.
I dug the trenches in, what was it, half April.
So yeah, I don't want to wait that long.
I want to do this as soon as possible.
And get it ready before winter.
Because then I can work slowly on the outside.
Or on the inside.
And the plumbing etc. I can do that.
This is sort of the only way I can really judge how it looks.
Because from the scaffolding you're too close up.
It's going a little bit slower now.
Because I'm through the best looking stones.
I've used them there.
And now I have to search further to find good looking stones.
With just a beautiful flat facing.
And also a few big ones.
It needs to be a nice mix.
But this is as far as I got.
It's going well.
I think next week I might be able to finish the other side.
Skylight is on.
I should be able to pick up the sheet metal for the roof.
That goes underneath the stones.
Hopefully today or tomorrow.
I think tomorrow.
Rick has just left.
He was here for a week.
I know him from high school.
We go way back.
And it's nice to have him.
We don't see each other very often.
He's selling some of his artworks.
I think he had one sort of finished painting.
And the other ones are sort of quicker studies.
You can make a bid.
I'll put a link in the description for an auction.
All the money goes to the artist.
If you want to support this channel it's also possible.
I have a PayPal link and a Patreon account.
Which you can also find in the description of all of the videos actually.
The links are always there.
All right.
Time for some dinner.
