Good morning everybody! Welcome back to Diesel Creek. This is a very exciting episode for me
because today, today, finally, after nearly a year, well I guess what feels like a year,
more like nine months of anticipation, today we are finally going to start to transform
this piece of dirt that I put here into my dream workshop. This has been a long, long time coming
so I'm super excited. Today we're going to finally get this thing off the ground. I got all the
building materials here on the ground now and the builders are on their way. I think I might even
hear them coming down the driveway so I'll bring you back when we get started. Well, well, well,
we finally got some building materials showed up here. I think we're actually going to get
us a building built. Getting corners all laid out here. Things are, things are going to be
up here. We're going to be drilling holes here very quickly. All right, these guys are working
quick. They're getting ahead of me. They already got their third hole drilled there they're working
on. This is what's called a pole barn so we're just sinking poles in the ground but these poles
are pretty special. The advantage of the pole barn is that it's cheap-er, nothing's cheap these days,
but it's cheaper because you don't have to do any foundation work. The poles are your foundation.
The downside of that usually is that the poles will tend to rot off at ground level so these
posts here supposedly have a lifetime warranty. Hopefully it's not one of those lifetime
warranties that the company's gone before you ever get to try to claim your lifetime warranty,
but basically they dip these in like a butyl rubber compound and then they put a heavy wrap
on them and that gets you above grade with the posts and all the lumber is treated too. So yeah,
hopefully these last a long time. Everybody needs an inspector and a shovel leaner.
So while those guys are augering holes, let me go ahead and explain to you what's made this
take so long. I'm not going to bash any companies here. If you've done extensive work with contractors,
builders, any of that stuff you know that good ones are hard to come by. So the company that
I originally ordered all the materials through was also the same company that was supposed to
in and put the building up for me. And they came in, they had a nice sales pitch, I liked them,
they said they had better materials, which I still believe they do have better materials.
But after a while, well first of all they rushed me to get the dirt work in and that's why
at the beginning of this series I was saying that we had to scramble and get all this done.
After I get the dirt in, I finally call them and say hey we're ready to go,
site's ready. They tell me, well my building crew quit. Where's that leave me?
So they tell me if I can find somebody else to put it up, so I do. And then after about a week
they call me and say hey we got a crew together we're going to come put your building up.
Well I already hired a different crew. So the different crew was working me into their schedule
so I was already a few weeks behind from that. And then weather and a few life events,
which I completely understand, kept them from coming out as quickly as was first intended.
But all that aside, we're past it now. The building is going up and it's not snow on the
ground yet so I'm happy with it. Boy would you just look at that! Would you just look at it?
That is real 100% genuine progress on the dream shop here finally. And just to clarify,
I've had a few people kind of say oh you're calling this your dream shop but man I figured
you'd want something a lot bigger and better. I mean of course I would. I'm only calling this
dream shop because it's a realistic dream shop. Contrary to what some of those spammy videos on
YouTube might have you know, I'm not a millionaire. Paying for this all out of pocket so it's
over the top here. The footprint of the building is going to be 40 by 80 and look at how nice and
true they got these walls going on here. Look at that. The footprint of the building is going to
be 40 by 80 and you see how there's a big gap here between these two posts? That's not framed
up for a door. This back half, not back half, but back part here from that post to this post
is going to be a big open air porch that goes underneath here. So the main roof is going to
extend out over this whole thing. The main roof will be 40 by 80 and then this is 16 between these
posts and then from this corner up to the very front there we're going to enclose that whole
thing. We're going to enclose that whole thing. We're going to have three 14 by 14 doors coming
into this thing. We're going to have heated floors. We're going to have insulation in the walls.
It's going to be great and then eventually we're going to have that overhead crane that I bought
at the auction and we're going to have that so that it runs the length of the enclosed portion
of the building. End of day two here. Actually starting to look like a building now. Today they
got everything framed in with all the purlins which are these two by sixes running across right here
and they got the headers on for the trusses which are the LVLs at the top there.
They got all their blocking on ready to accept the trusses tomorrow. Everything is
starting to take shape. They also got the garage doors on the front of the building framed out
there. That's two 14 by 14 garage doors. That's going to be really nice. We'll be able to get
anything in here. That's the end of day two though. Tomorrow they're going to set all the trusses on
and then they're going to start framing out. There's a lean-to that's going to go from this
corner to this corner and I think it's 16 or 18 feet out 12 foot high. Yeah it's going to be
awesome. We're going to have so much room under here. Well they were going to set trusses first
thing this morning but we had some rain last night so we'll start framing up the lean-to.
These guys are quick man. They drilled the holes and before I know it they turn around they have
the post already dropped in here. Going to have a lean-to on this thing before we know it.
Here we go. These guys are picking up the first gable end truss here. Going to start
slamming some trusses. Getting exciting. Oh one shot.
Well we had to put the big dirty hoe to work here. She's doubling as a man basket at the moment
but she fits in the shop pretty nicely. Can't complain about that. All right look at that.
Getting pretty late. Those guys got a long drive home so they took off for the night but
I think tomorrow they're going to have all the siding finished up probably.
Not a whole lot left to do here. Man this is looking good. Really really liking that
color combination there. Starting to look like a building. Look at that huh? We got this whole
side done. Looking good. Feels like we're coming down the home stretch now. They got the soffit
fascia done on this end. The gable's done. Oh yeah looking good now.
You know when you do a project like this and you plan it for so long this building's been in my
head for probably 10 years or more now and uh standing here actually looking at it in person
it's a good feeling. Are you guys ready to see this thing? Oh this is going to be so great. Boom. Shop.
As you guys know this has been a long long journey to get here and I couldn't be more thrilled with
the outcome. Now I hear what you're saying but Matt but Matt there's there's there's no back
wall yet. It's just wide open. What are you going to do there? Well the construction crew just left
and they will return once the concrete floor is in. So the guys that put up the shell of the
building here are not the guys that'll do the concrete floor. I have a different crew coming for
that. So what I'm doing here is I'm going to put in a six inch thick concrete floor, fiber reinforced
and I'm going to be putting insulation board underneath of that with pex tubing run all
through the floor and I'm going to have a heated floor that we're going to eventually connect to
an outdoor wood boiler. After the floor is done we're then going to have the building crew come
back in and they're going to frame off a stick built wall back here. Not a post style wall like
the rest of the building is because if I want to expand in the future and enclose this back 16 foot
of overhang here I'll literally be able to disconnect the wall from the framework, slide the
wall out to the end here, re-secure it and then we'll have another 16 by 40 added right onto the
building with probably minimal work I would imagine. So when the concrete out here is poured
it's going to be the same exact grade it's going to have just the slightest little pitch to it
so that any water doesn't collect under it right now because it's not closed in yet but the pitch
is going to be so minor that it won't matter if I close it in it's not going to affect anything.
So the building stats here the building itself is 40 by 80 the entire roof the entire footprint
of the building is 40 by 80. 64 feet of it you can see where the siding is that's the part that's
going to be enclosed after we get that back wall frame and all off so 64 feet is going to be
enclosed and I am leaving this 16 foot overhang here you can see where the skid steer is parked
at right now that's going to be open air for storage or if I'm doing a lot of heavy cutting
and grinding and welding and you know you got a lot of fumes and stuff we're going to be able to
work under a roof and still have protection from the elements a bit and not be putting all that
smoke and dirty dusty nastiness into the building so that's going to be good we're getting six inch
gutters put on yet and downspouts all be color matched so I'll actually end up if you count the
gutter in I'll end up with an 18 inch overhang all the way around the building well not the
the sides when all is said and done there will be three 14 by 14 bay doors here this one is going
to be a dead bay this one is going to have a matching door directly at the other end of the
building so you'll be able to drive straight through and loop around the building with
something long like a trailer or whatever I don't even remember what the lean-to came out to be
exactly because I just told him to buy 20 foot material and make it as wide as we could so I
think we wound up somewhere around 17 feet at the overhang which is great so I have 17 by 64 foot
here I've got an overhang on this and I'll be able to keep stuff tucked in there out of the weather
when it doesn't really need to be in the shop taking up space and I think this thing turned
out fantastic I'm a I'm a big fan of this I really like the way this looks another thing
I'm considering doing in the future here is I'm going to take two of these cells on the lean-to
and probably close them all in and tie it into the building put a floor in there and everything
and actually add a bathroom and make it kind of a parts room slash bathroom slash storage room
bumped out from the side of the building under the lean-to here that way I'm not wasting good
overhead space here because we have 18 feet to the bottom of the rafter and there's scissor trusses
so I think we're close to 20 22 feet I think at the peak I'm really excited about this I keep
saying it but this is opening up so many possibilities and going to make my life so
much nicer when working on stuff so I actually have a guy from a spray foam company on the way
right now he's coming out to give me a quote I'm going to have spray foam put on the entire ceiling
we're going to leave the rafters open but we are going to put metal on the walls so it'll be uh
nice and smooth we won't have to worry about if we're shooting sparks at the walls or anything
we won't have to worry about uh setting the place on fire and uh yeah it's going to be nice once
this is all insulated so after so many comments it's good to actually see this thing sitting here
I was getting bombarded in every video with comments of what about your shop what happened
to your shop are you putting it off are you putting it off no the first contractor that
was supposed to show up and build this thing uh didn't long story short there's a bunch of drama
involved I don't like drama I'm not going to share drama with you guys but long story short
I found somebody else to put up the building because I was asking this person to step into
a role that they were not with from the beginning contractors don't like to do that they don't want
to walk into somebody else's mess and pick up the pieces it's uh it makes their lives much more
difficult and can create drama for them as well so I don't blame most contractors for just saying
nope nope I'm not touching that you already started it with this other company we don't
want to do that so I got a hold of edgel construction and they came out and ended
up putting up the building for me and they've done a great job I can't complain about that
there were some issues regarding materials and again that all comes part and parcel of
stepping into somebody else's project the people that were going to put it up originally the people
that ordered all the materials they don't build buildings identical to the way that these guys
normally did so there was a little bit of guesswork and well maybe this is what we're supposed to use
for this and that and I don't know I'm not a builder I mean we could just speculate all I
could do is tell them what I wanted and we made it happen so long story short at the end of the day
here's the building to save some money I'm not paying somebody to do what I can do I'm going to
do all the prep work in here myself I gotta grade out the floor again make sure it's nice and true
and we're gonna have to lay down some gravel and we're gonna have to put some insulation board in
and pex tubing for in-floor heat but before I can get to any of that I need to dig and pour
some piers for the crane system that I want to put in this building that is my biggest concern
right now I went with flat bottom trusses out here because I figured that would give it a more
finished look at the end here I thought it would be kind of weird if we went with a scissor truss
all the way out to the end and closed it in and in my mind it also gives a little more stability
out here since we only have two posts but an engineer might tell me that I'm not exactly
correct on that one but there's the machine for scale that machine's actually seven foot tall
and you can see it uh it doesn't look very big in this building and of course I wish I could
have gone bigger still you know no matter how big you build it it's never quite big enough but
I think this will suffice I'm going to have more than enough storage in the future here I'm working
on some other things just to get me some more equipment sheds lean-tos kind of things to get
things out of the weather this building here is really only going to be for working if it's not a
project that needs active maintenance repair work restoration whatever it shouldn't be in here the
only thing I might keep in here is anything that needs to be climate controlled because the building
will be heated and I'm even considering doing some air conditioning in the future here might
have to price that all out anyways guys that's the shop I'm going to end this video right here
because I need to jump in that skid steer and start doing some concrete prep I know that this
has been a long time coming and I had built it up and then ended up stalling out over the summer
trying to get another builder lined up and in here but as you can see it's finally here so
thanks for sticking around and hanging in there trust me nobody wanted to see this thing up more
than I did I'm just glad I'm able to get it up hopefully and have it sealed off before the snow's
flying here that was my main goal and my main concern I don't want to spend another winter
working in the cold if I don't have to so if you like the video do me a big favor hit that thumbs
up button down below if you want to help support the channel head on over to dieselcreek.com and
pick yourself up some sweet new merch I have all new fall merch coming in it's so new that I don't
even have it yet that's why you don't see me wearing it but we have all of our regular stuff
we have hats t-shirts koozies now we have hoodies we have pocket t-shirts we have long sleeve t-shirts
and we got some new stickers over in the store so if you haven't been over there yet head on over
check it out pick yourself up some sweet new merch and get geared up for the winter that's all I've
got for now as always thanks for watching and I will see you on the next one later