UP 903224 is a modified CA 3 caboose. It is assigned to the Salt Lake Derrick Train Service. UP North Yard. Salt Lake City, Utah. June, 1983. Photo by Warren Johnson.


TSG Multimedia
157 followers·352 content items
Videos from TSG Multimedia
In case you missed it, we have an epic program coming up tomorrow!
https://www.youtube.com/live/v486rO3-2VE?si=jHkFbeWGbdSTlioo
3
UP 18, a 3600 horsepower 20 cylinder engine SD45, is about to say a final farewell. It will soon be cut up and sold for scrap. Durbano Metals. Ogden, Utah. May, 1986. Photo by Warren Johnson.
1
The most re-numbered unit on the UP System. It started life as UP 423, a 2400 horsepower SD24. It went through 4 re-numberings. Provo, Utah. March, 1972. Photo by Warren Johnson.
1
Remember those Western Pacific GP35 units that were wrecked, that were posted yesterday? Here they are after rebuild by the Salt Lake City shop employees. 793 was WP 3014, and the 798 was the WP 3020. Photos taken at Salt Lake Diesel shop, and Logan, Utah depot. 1985, and 1988. Photos by Warren Johnson.
Two Western Pacific locomotives were brought to Salt Lake after a run-away roll over. Both units were completely rebuilt and put back into service. UP Diesel Shop. Salt Lake City, Utah. May, 1984. Photo by Warren Johnson.
All four of these units are forty series EMD locomotives. They are all on the high bay side of the shop, and are in for various work to be done. UP Diesel Shop. Salt Lake City, Utah. October, 1984. Photo by Warren Johnson.
1
D&RGW 3501 and friend are pushing a loaded coal train towards Soldier Summit. Castle Gate, Utah. Otto Perry photo.
UP 806 and 805, both GP30 units, are the power for the Park City Local waiting on the ready track for their call time. Riverdale Yard. Ogden, Utah. June, 1984. Photo by Warren Johnson.
Two Union Pacific Maintenance Of Way cranes that are used to distribute ties, and later to pick up the old ties. They crawl along the top of low sided gondolas. Salt Lake City, Utah. May, 1985. Photo by Warren Johnson.
UP 3709, a 3,000 horsepower SD40-2 is lead unit of a coal train delivering the first train of coal to the new IPP (Intermountain Power Project) power plant south of Lynndyl, Utah. July, 1985. Photo by Warren Johnson.
UP 3626, a 3,000 horsepower SD40-2, has just been lifted off of its trucks. The 35 ton crane is moving over to pick up the trucks for rebuild. UP Diesel Shop. Salt Lake City, Utah. July, 1983. Photo by Warren Johnson.










