PHILIPSTOWN – Each spring, summer and fall, thousands of hikers take to the trails along Breakneck Ridge in Philipstown and Fishkill.

However, with the start of spring hiking season, the State Office of Parks, Recreation and Historic Preservation has advised park-goers that the Breakneck Ridge, Wilkinson Memorial, and Lower Brook trailheads and the adjacent Breakneck Ridge Metro-North Station, which closed on April 21, 2025, will remain closed throughout 2026 as a result of multiple road construction projects.

Lori Moss, communications manager of the Hudson Highlands Fjord Trail, said that the trailhead and station closures allow for the complete renovation of Metro-North Railroad’s Breakneck Ridge station and construction of the Fjord Trail Breakneck Connector and Bridge. 

“The new Breakneck Connector trail and pedestrian bridge will provide hikers with an alternative to walking along State Route 9D to access popular trailheads and will create cohesive access to and from the new Breakneck Ridge train station,” said Moss.

Moss also noted that construction will address longstanding issues of safety, accessibility, and environmental health in the project area. The addition of sidewalks, organized and formalized parking, including small lots on the west side of Route 9D, enhanced crosswalks, and wayfinding signage will facilitate a safer experience for both motorists and trail users. Improved access points for first responders at Breakneck Ridge will also increase safety in the area.



Original article