This is a very important step in the process of building a house that we need to pay attention to.
On the upper floor, there is an extremely important thing to pay attention to.
If you are planning to build a house, you should not ignore it.
You need to clean the dust.
Clean it like when you live in your house.
After that, it will be clean.
I will use the anti-dust paint.
I will put the anti-dust here.
Close this hole.
There is a hole here.
Close this hole.
Then pour water into it.
Then soak it.
Check it every 5 to 10 days.
Hello everyone.
Welcome to my next video.
In this video, I would like to invite you to come to a project that is in the process of being built and is in the process of being completed.
My team is working on it for customers.
In today's video, I will review the house.
I will also give you some tips when you build your own house.
There are many customers who contact me and ask me about how to build a house.
If you want to build a house like the one I am building here,
I advise you to research carefully before you ask for help.
There are many people in our company who have some ways to build their houses.
The first way is to pay a deposit to a construction company.
The second way is to hire a construction company.
They will do the work for you.
When you hire a construction company, you will have to spend a lot of time and money to observe and buy materials in your house.
If you hire a construction company, they will do all the work for you.
This house has a 1-2-floor function.
There are 3 bedrooms, 1 bathroom, and a roof area above.
Currently, the house is in the process of being completed.
This is a very important process for you to build a house that you need to pay attention to.
First, when you build a house, you should have a drawing board.
If you don't have a drawing board, you have to find a way to draw it by hand.
When you build a house, you have to know what to do in the future.
Why do people need a contract when building an economy unit?
A contract is something that you have to draft before you do it.
When we build a house, we need to draft it.
If you don't have a drawing board, you will miss a lot of things when building an economy unit.
For example, this house has a very convenient location.
I will paint the roof of the house.
And I will cover the floor with canvas.
So I have to leave it like that.
When you build a house, you have to ask Mr. Phong if you can do it.
If Mr. Phong says no, you can't do it.
So if you want to ask Mr. Phong, you have to ask him when you haven't done it yet.
And of course, when you build a house, you should pay attention to your team.
Because when you build a house, you have to take care of it.
This house is a country-style house that Mr. Phong often builds and reviews for you.
The living room is on the outside, the kitchen is on the inside, and the stairs are on one side.
I only see that in places where there is a gap between the concrete and the brick wall,
Mr. Phong puts all the places here for the roof,
to minimize the collapse of the house.
And now when building a house, we usually don't have a floor.
But on the roof, there are a lot of water pipes that go up there.
So we put the technical boxes up there instead of going up like in the old days.
Inside, there is a kitchen.
And inside, there is a bedroom.
The bedroom is on this side and the back.
There is another thing that you need to pay attention to.
This is a floor at the end of the house.
But this house has two floors.
A floor on the stairs to get the wind out of the house.
And a floor at the end.
If we use all of this floor, it will be dark.
This is the first thing.
The second thing is that it will not get the wind out of the house.
It will be a waste of money for us to live in a house that is hot.
There is a toilet in the back.
This house is only built on the 10th floor.
When it is built on the 10th floor, it will have such pillars.
Why didn't Mr. Phong put the pillars in the front and put them in the back?
Because Mr. Phong wanted to put it there.
Let me show you a video about the 10th floor.
And this is the 20th floor.
Why do I make the 10th floor?
Because I want the bedroom to be large.
So I put it on the 10th floor.
So that the pathway is wide.
If there is a design, we can calculate such things.
If there is no design, it is very difficult to build.
Because the builders are very tired.
And if the owner keeps changing, the builders will not like it.
This is from the inside to the outside.
I have to measure the height of the house.
There are many people who are afraid that their house is too high.
The yard is too short.
My house is 21 meters long.
The yard is 7 meters long.
Inside, we only need 10 meters.
The living room is 5.5 meters.
The kitchen is 5 meters.
The bedroom and the toilet are only 4 meters.
The length of the house is 14.5 meters.
Now I will show you the upper floor.
There is one very important thing.
If you are preparing to build a house, you should not miss it.
This is the upper floor of this house.
The upper floor of this house is similar to the upper floors of other houses.
However, there are some items that are under construction.
I want to introduce to you.
There is a space in the middle and a bedroom in the front.
This bedroom has a very large and spacious design.
It is very comfortable and comfortable to live in this room.
The layout of the bed and the work table is very good.
What I want to point out to you is the toilet area.
The toilet here is not waterlogged.
When we build a house, there will be dust.
To build this toilet, we need to clean the dust.
Clean like the floor of our house.
After cleaning, we will use the anti-dust paint.
The important thing is that the paint must be applied at a high level.
The paint must be applied at a height of 20 cm.
So that the water does not soak the floor.
So that the water does not get into the floor.
And the holes in the wall need to be painted with anti-dust.
I have already done this, so I will not show you.
We have to make a hole in the toilet.
In the next video, I will show you how to build a toilet.
There are many people who have built a house and the toilet is clogged.
You guys keep asking me how to fix it.
Because right from the beginning we did it wrong.
In the next video, I will show you how to fix it.
This is the toilet that I am building.
I will not show you.
I will cover the whole wall.
I will cover the whole wall to make it clean.
And the water can flow freely on the wall.
Please pay attention to this part.
This bedroom is very spacious.
The front door is outside the balcony.
I will put the bed here.
I have already painted the floor.
The important thing is that you should paint the floor with wet sand.
Do not paint with dry sand.
Wet sand will make the floor more solid.
When painting with dry sand, then we let it dry.
Then we cover the floor.
Then the tiles will not be loose.
Right here we have a total power supply box.
We will distribute power lines and internet here.
There is a staircase up here.
There is a bedroom in the back.
The bedroom in the back is also very spacious.
If you notice, there is a hole at the bottom.
When the wind blows in, it is very cool and wonderful.
When we have such a spacious and cool bedroom,
when the air comes into the house, it is very convenient.
So when you build a house, remember to call me.
Free consultation, no charge.
If you love it, call me to build it.
I will build it.
This is the second bathroom.
All the tiles are buried in the wall.
This is the bathroom.
I also paint the bathroom in the same way as the bathroom below.
I paint the bathroom in the same way as the bathroom below.
After painting the bathroom, it is dry.
I will pour water here.
I will see if the water soaks in the bottom.
It is not over when it is full, everyone.
This is the second floor with 2 bedrooms.
I will go to the third floor.
I will share with you to let you see.
In the 3rd floor, there is a tomb, and we will have a prayer room in the upper area, as well as in the front and back areas of the temple.
This is the outside area of the temple. It is very cool outside.
Today is April 30th, May 1st. However, Mr. Son is in need of money, so he still goes to work.
Standing here, we can see the 1,500-bed hospital, the police station of Thu Dau 1 city, Dinh Hoa residential area, Phuong Chi hospital,
the new city center of Binh Duong, and the center of Thu Dau 1 city.
This house was built for sale, so if you are interested in buying a house in Hiep Thanh ward,
you can watch the video and contact Mr. Phong to book a place in advance for this house.
This is the roof of the temple. There is also a part of the tomb, so you have to pay attention to it.
It will be like a toilet. When we finish the foundation, we have to clean it up.
After that, we have to paint the tomb and raise it up.
After that, we have to fill it with water.
When we fill it with water, we have to close the door, close this hole, close it, fill it with water,
then we soak it for 5-10 days to see if the water is absorbed.
If the water is absorbed, we continue to soak it.
After that, we let the foundation dry, then we will install the bricks.
This is the city center of Binh Duong, and it is in the south, not in the north.
So when you watch Mr. Phong's video, there are a lot of people in the north who complain
that why the house is built with broken bricks.
Everyone in this house is built like that, not just Mr. Phong's unit.
The house over there is being built, 100% broken bricks.
And there is another building over there that is also being built with broken bricks.
That is, all southern areas are built like that.
And whether this house is waterproof or not, it is thanks to the paint layer, the protective layer on the outside,
not because the brick is waterproof.
This brick, whether it is vertical or horizontal, it is still waterproof.
The important thing is that we pour it in and we paint it, paint it, it's like we're wearing a shirt.
If you wear a raincoat, when you go out in the rain, it won't get wet.
And if you wear a normal cloth shirt, when you go out in the rain, it will wet your shirt and wet your body.
So please note that between the coastal areas and the way we do it in the north,
you can only build this house for about 1.5 billion VND.
But this house is built for more than 1.5 billion VND.
So the fact that the owner spends a lot of money on this house will do a lot of things.
It will be more laborious and more difficult.
If you find Mr. Phong's presentation fun and helpful,
remember to like, share this video and leave your comments.
We will discuss together about building houses or beautiful houses.
And if you are interested, contact Mr. Phong to own a house.
Right from when it's new, new, new, new, right?
Bye bye, see you next time.