The British People Keeping the Steam Train Alive

The Age of Rail
4 followers
Nov 28, 2026
Starting in the 1830’s the age of steam was made in Britain, and was one of the greatest technological breakthroughs the world has ever seen. The train powered Britain’s rise to power and changed everything from the food we could eat to work we could do. As we continue to power towards the future, a network of 22,000 volunteers and 4,000 staff are working together on 130 Heritage lines and carrying 8 million people each year through the age of steam.
0:10 The Age of Steam and the Heritage Railway Movement
3:53 Carnarvon Station and the Welsh Highland Railway
8:41 The East Lancashire Railway and Refurbishment Challenges
14:00 Restoring the Bogies and Reuniting the Carriage
17:00 The Great Central Railway's Revival and Legacy
23:21 The Final Checks and the Road to Service
26:27 The Grand Opening and the Afternoon Tea Service
32:05 The Future of Heritage Railways and the Next Generation
This video explores the dedicated world of heritage railways in Britain, highlighting the passion of volunteers and professionals who preserve the Age of Steam. It details the technical challenges of maintaining vintage rolling stock, the rigorous operational requirements of steam locomotives, and the strategic modernization of stations to ensure these historical lines remain viable for modern tourism.
The Age of Steam. Made in Britain,
it was one of the greatest technological breakthroughs the
world had ever seen. The train powered Britain's rise
to the summit of imperial power, and it
changed everything from the food we could eat to the work we could do.
Born in the 1830s, the Age
of Steam lasted 130 years and then was gone.
But today, as the rest of the world powers towards the
What's the future?
A network of 22,000 volunteers and 4,000 staff,
like station managers, signalmen, engineers
and drivers, are working together
on 130 heritage lines carrying 8 million of us every year.
To see the sight, the sounds, the smells, the steam,
the coal, everything, it's all there. Wonderful.
This is the story of the people
who are keeping our railway heritage alive. For them,
the age of steam never ended.
This is Steam Train
Journeys. Heritage
railways dotted around
the world, the oldest is the Ffestiniog and Welsh Highland Railway,
opened in 1832.
Carnarvon station manager, Stephen Gregg,
Yeah, the two banquets.
is in the thick of final preparations
for the latest addition to the line.
Yeah.
The cleaners will be cursing us.
The line runs for 40 miles,
from Carnarvon in the north,
through the Snowdonia National Park, all the way down to Porthmadog.
The railway attracts 400,000 passengers annually,
and its home, Carnarvon, is still dominated by its 14th century castle.
And tomorrow is a big day for the railway.
Stephen and his team will oversee the grand opening
of a brand-new £3 million station.
We're expecting about 170 people to arrive here on a train
from Dinas up the line, and they're going to come in here
have a drinks reception, have some speeches,
and then we're going to have a buffet,
which the girls are preparing for us in-house,
so they're doing a really good job.
And like many of the staff and volunteers on Heritage Lines,
Stephen's love affair with the railways goes way back.
I used to volunteer at the railways,
did what we call kids week, and that's when young
volunteers can come and get involved with the railway,
and carried on from there, started
working on the trains.
I was hooked, and became a guard and signalman,
buffet steward, worked on the trains for years
and years as a volunteer, I was a teacher by trade,
and then when the job as customer
services manager came up, I thought, well,
who doesn't want to go and get paid for working
for the railway they love, and I applied and got the job.
How are we getting on with the food, girls?
Yeah, it smells great in that cafe, I must say.
Excited? Yeah.
Terrified? Yeah.
Be fine. Any questions? No? Let's go!
So the Welsh Highland Railway is the most modern of heritage railways.
We've got modern carriages built by our team in Boston Lodge.
So we wanted a modern station that's going
to work out for the modern tourist
and be fit for purpose.
Getting enough vol-au-vent and vegetarian options ready in time
has pushed Stephen and his staff to the limit.
Right, how are we getting on? Quick update.
Oh wow, are they, they're the?
Vegetarian.
Sounds like hummus.
Hummus, beetroot, is it?
The beetroot wraps.
Beetroot wraps, yeah.
They're vegetarian, aren't they?
With hummus inside, lovely.
Everything else is all right?
Yeah, cool, okie doke.
People have worked very, very, very hard
to get the railway rebuilt
and this is a nice modern building
that's going to be able to be a present
to those people and a legacy.
The East Lancashire Railway runs for 12.5 miles
from Rawtenstall in south east Lancashire
through five other stations
to Heywood in Greater Manchester.
Like all the major heritage lines, the East Lancs
is heavily reliant on rolling stock that's at least 50 years old.
Their workshop here at Barton Street handle over 90 examinations
of engines and carriages each year.
At least one major overhaul and several repaints.
All overseen by manager Lee Kenny.
For more courses for me, the essence of what Heritage Rail is,
what it embodies, is to actually bring back the years of the 1950s,
60s and earlier than that, of how rail travel used to be,
and the smell, the sound, it's so magical an experience,
and you fall in love with them, you do,
you really do, even though some mornings when it's...
Hammering down with rain and you're crawling around one
of these things at 4 o'clock in the morning preparing it for service,
you grumble, but once you're on the engine
and the engine's going down the line, it's second to none.
The day-to-day services run
by the East Lancs Railway operate like a well-oiled machine.
In 10 days' time, it will begin its hugely popular
and lucrative afternoon tea service.
But there's a problem.
The buffet cars have been undergoing a major refurbishment.
And they're not finished.
Worse still, the two bogies, the units that sit on top of the wheels,
have also been removed and need a major overhaul.
The vehicle's still got no bogies underneath it.
There's still all the brake system testing still
to be done. There's a multitude of other things
that we need to make sure the vehicle's picked
for service. Hopefully, it should all be here by the end of this week.
Catch.
All right, cat's eye reflectors. Cat's eye summit.
Yeah.
Not got nine lives, have you? That'll do.
Once I grow up.
Foreman Jonathan Valentine's job is to strip down the two four
and a half tonne bogies,
refurbish and reassemble them before finally
reattaching them underneath the buffet car.
Railways like East Lancs rely heavily on visitor revenue.
Failure to get the carriages back in
service for the lucrative summer season would be a serious blow.
Bogies basically takes all the weight
of the of the vehicle between two of them
so you've got one at each end and it allows the
As the coach to pivot and go around corners.
A bogey is the unit that sits on top of the wheels
and attaches to the underside of the carriage.
But Jonathan has identified a problem.
These bogeys have too much suspension,
resulting in the whole carriage riding too high.
In layman's terms, you should be able to get your fingers between there
when the weight of the coach is on it,
and at the minute you can't, so we're having to adjust the springing
and the height on the springs to bring that down
so we've got the right clearance
as to what it should be, as in the manuals.
People just think it rolls in a workshop
and magic happens over a night or a couple of days
and it comes back out all shiny and new.
Not the amount of work that has to go into them.
It's a long time.
The first job is to separate the bogey from the wheels below it.
Now your mind's off.
I know.
But it soon becomes apparent that a couple
of small hydraulic pumps are not up to the job.
Happily, there's a solution.
A giant crane.
With the top
and bottom halves of the bogey now separated,
The all-important springs can be removed
as Jonathan suspects they may be the problem.
If they were broken you'd have they usually break around here
so if that was broken it
had just come off because they don't usually crack don't coil springs
so they just break
but these are all right actually they're quite
quite good they're quite good they just want
cleaning up painting no no broken ones
probably 30 years plus of um rust and debris.
He's got something on his chest.
You can see how much damage water does over years and years.
The workshops of all the heritage railways
frequently perform miracles, restoring damaged stock.
The springs are rusty, but otherwise in good condition.
It'll be all right.
Soon, time will tell.
With extensive cleaning and protective layers of anti-corrosion paint,
the springs can be reused.
But if the springs aren't the problem, what is?
The springs sit on discs or packers.
which are badly corroded
and all the accumulated rust is now pushing the carriage upwards.
There's only one solution elbow grease.
All the rust has been removed from the spring pockets
so the next process is put all the springs back in place new packers
because the ones we've taken
out obviously a bit corroded and a bit naff
and then put it all back together and underneath the
boat underneath the coach which will be a few days time.
With far more rust on the bogey than is normal
jonathan knows he's up against it to get finished
on time seven working days from being like this
to going under the coach to go
into the other end to strip in the other bogey
to do the same to get it out
that door yeah yeah it's 5 00
a.m in the sidings at the great
central railways loughborough depot
and aaron crawford is training to be a fireman here
on the railways a fireman doesn't put fires out he or she starts them
At the moment I'm just collecting some Welsh coal.
We tend to light the engines up on Welsh coal
because it doesn't give off
as much black smoke, keeps the engines happy.
So unfortunately I'm going
to do this one manually rather than take it out the tender.
Today Aaron's locomotive 73156 will be running
for eight miles between Leicester North
and Loughborough Central.
In principle a steam engine is a wonderfully simple machine.
Water is boiled to produce high-pressure steam,
which expands into a reservoir
and then released into a cylinder,
which pushes a piston and turns the wheels.
Four hours from now,
Aaron needs to have the steam pressure up at 180 psi,
which is enough to move the train.
The first thing we do is we cover the grate in a layer of coal,
in this case, Welsh coal,
as almost a nice, even bed.
This is a bed for the fire to get a hold on.
Afterwards, we will add
a layer of wood,
and on top of that, some paraffin soaked rags.
Now, the fire then takes hold in a,
what I like to call a chain reaction.
We set fire to the paraffin rags,
paraffin rags set fire to the wood,
I'm sorry.
and the wood set fires to the coal.
Great Central Railway's success depends
not just on an army of volunteers,
but also 100 full-time specialist employees like Peter Maynard.
I just filled an oil reservoir there, and it's sealed with a cork,
which is similar to a wine bottle cork,
but it's got a reed in there which allows the cork to breathe
because when the oil goes down, it needs to be replaced by air,
otherwise you can't get the cork out.
This morning, his job is to ensure the loco has enough oil.
But he's got his work cut out.
A steam train can have up to 100 oiling points
on axles, bearings, wheel sidebars and brakes.
And Peter has just three and a quarter hours to get the job done.
While Peter sorts out his lubrication,
fire starter Aaron needs to put his foot on the gas.
We've got a nice even coverage over the surface of the grate.
And now what we need to do is put a wood layer on top of that.
Getting the boiler up to pressure can take up to eight hours.
The solution? A warming fire left burning overnight,
which then gives the firemen a head start first thing in the morning.
With a warm engine you're probably looking
at about four hours to get up to a
decent working pressure and once all
the preparation's been completed as well.
So these rags have been nicely doused in paraffin.
What I tend to do is just spread a few here, there and everywhere.
Then with a lighter,
you start your fire.
So now what will happen is the paraffin rags will set fire to the wood
and the wood in turn will set fire to the coal.
Shut the door, treat her with respect and she'll do anything for you.
It's just one of, I suppose it's just one
of those sayings you know and it's very true you have to be,
you find, I certainly know many former British rails,
British rail crew you know as they're going
along they'll say you know come on love let's get
on with it and all this sort of thing and
they can be big brutish men
but they'll be so genteel with the locomotive it's a funny thing
It's a good thing, really.
I suppose they evoke that sort of affection, yeah.
The workshops
of the East Lancashire
Heritage Railway.
Right, everyone ready?
Jonathan Valentine and his team have spent days
removing tonnes of rust from two bogies, or wheel frames,
to hopefully solve a big problem.
The passenger carriages that sit on top of them are riding too high.
The bogies have had tonnes of rust removed,
have been repainted and are ready to be reunited with their wheels.
But it's an operation that requires patience.
and real engineering expertise.
The bogie frame is four and a half tonnes, imperial tonnes.
And with the wheelsets in all up, it's six and a half tonnes.
The wheels must be aligned precisely with the bogey hovering above it.
We'll bring it down and then...
Wait, mine's miles away.
Going right. Right, we'll bring it down closer.
Jonathan only has a couple
of millimetres to play with...
Do I go back a bit?
...during this delicate operation.
This side's nearly in.
We're in down.
Right, mine's in.
Yeah, mine's in as well.
Might have to square the wheel set up there.
How far is your off, Wendy?
I'm not far off at all.
Right.
Hold it there, then.
Because at the minute, it's sat like that.
An exaggeration.
It needs to be square.
This is heavy metal precision engineering.
Liam, you all right?
Yeah, but everything's gone on this side.
Bolt block's in.
You're in.
You're in, Wendy.
Yeah, it looks that way.
It went easier than I thought, actually.
Too easy.
Yeah, I think I've got it.
I've got it.
I've
got it.
I've got it.
I've got it.
It went easier than I thought actually, too easy.
There must be something wrong if it goes together too easy.
It means I must have done it right.
It's quite easy when it's on the crane
because it just flows about quite nicely.
But setting the wheel sets square
into the axle boxes like we had to do isn't so easy.
Because sometimes it can be quite hard work.
With bogies and wheels finally reunited,
there's one last stage to complete.
Next step will be lift the coach and roll the bogies underneath
and let the coach back down onto the bogies and hopefully...
With what we've done,
all the weight will distribute evenly through the bogies
and it'll sit lovely and level, but we never know until we do it.
We're ready.
With their shoulders literally to the wheel,
each man and one woman is pushing more or less a tonne apiece.
Rail joint, no, keep going, keep going.
Keep going.
Both refurbished bogies
are now being positioned close
to the passenger carriage,
which will then be lifted, lowered and reattached.
Fantastic.
This single track line was built
by the owners of the slate mines
at Blaenau Ffestiniog
to connect to the waiting ships down at Porthmadog.
And one of the rarest engines to ever work this route
is now lovingly cared for by David Fisher.
Well her name's Chaloner
and she's built in 1877 across the road in the factory over there.
She was built for Penrhysgoch Quarry in Nantlle
and she worked there from 1877 till 1954.
And then she was laid up in 1954
and my father bought her in 1960 for scrap.
They were used for initially getting the slate from the pit.
In the case of Penrhysgoch,
the slate was in a pit and to access the pit they had a tunnel.
So she used to work through a tunnel to get
the stone from the quarries into the mills.
So in the mills they then
Sliced it, split it rather,
and put it into the sides and made slates from it.
And after that, there was a lot of waste.
So like a lot of small railways,
there were hundreds of engines like this supporting the main lines,
delivering the local quarry materials
to be taken away by a larger railway.
This locomotive has a unique engine configuration,
with the boiler arranged vertically, a completely revolutionary design.
You'll imagine this was like
the latest iPhone in the time it was built.
This replaced horses. Before this, you could need 20 horses.
It saved them a fortune.
But this was now iconic to them.
To have an engine on your quarry was like something special,
so they named it after their daughters.
And with the train from Dinas due any second now,
it's time for David to take Chaloner back home.
It's 8am in the Loughborough depot of the Great Central Railway.
For the last three hours, trainee fireman Aaron Crawford has
been firing up the boiler of steam loco 73156.
So the inside of the box is starting
to take hold now you can see that it's not just the rags burning
you can hear the wood crackling away as well
so she's off us uh she'll be on the way now hopefully
the better look you give the cab
a decent clean yeah oh yeah of course yeah yeah absolutely
uh sweep her out and whatnot well once you've got
your bottles i'll start cleaning her up
We've got a bit of a sunroof, so it just adds a bit of ventilation
to the cab and a bit of light as well, which is always good.
Just trying to keep an eye on the black smoke as well,
because obviously we've got neighbours around,
so make sure we don't create too much smoke, you know.
Hopefully they haven't left the washing out or anything like that.
Right.
A once mighty network,
the Great Central Railway began a long decline,
starting in 1948, finally closing completely in 1969.
But over the last 40 years track has been purchased,
stations rebuilt, signals restored
and old iron horses rescued from the knackers yard
and a hardy band of enthusiasts like steam fitter
Simon Horobin refused to let the patient die.
So this locomotive is a BR standard class 5
number 73156 built 1956 in Doncaster Works.
And these were built for mixed traffic use, primarily, on the railways,
so that is secondary passenger duties and fast freight, in effect.
A bit of a workhorse of anything that they needed it to do, really.
Simon's job is to complete all the mechanical checks on 73156
by the time Aaron has the boiler up to pressure.
Most of it's a visual examination of the locomotive.
There's lots of parts that could work loose,
Such as...
the tires which are fitted to the wheels
or nuts and bolts all around the motion
because the engines as the engines working obviously
the wheels are turning and all the rods
are whipping around these sort of things are liable to work loose
so it starts as a visual
examination and then i've got the fitness to run hammer
a small hammer just tapping all the parts
and you're listening to the sound of them to tell if they're tight
and also as you as you do hit them
with a hammer you can obviously see anything that's working loose
things like here this large nut here keeps
the the little end of the connecting rod into the
cross head it's quite an important nut that's nice
and tight and it's got the safety cotter through
it through the slots in the nut prevents it
from working loose as it were then it's again
Bit of a listening and feeling kind of thing, but mainly looking,
if that was to drop out the connector rod would drop down
and it's the engine's in motion, so it's quite serious stuff.
To check all these nuts and bolts are nice and tight,
as you can hear there, that's a nice tight nut that is,
there's no play in any of them.
This examination will probably take me about half
an hour, three-quarters of an hour,
and then it'll last for four days, is our railways policy,
and after that four days, another person will have to come
and examine the locomotive.
For now, just two days
until the restored
buffet cars
are needed for the
East Lancs Railways
first afternoon tea service of the season.
At the East Lancs Barron Street Depot, two bogeys have been reassembled
and await the carriages to be lowered back onto them.
But first, foreman Jonathan Valentine has
a vital task to perform with an unusual material.
With more speed the coach rocks more, so it
tends to tilt on the body side to side a bit
when it's rocking.
What we do is put the horsehair in, pour it in oil and then it
just nicely lubricates the top bearing blocks.
You're playing with old toys in a modern world.
48 hours, two days
so it's getting a bit close to the crunch, as we see.
It'll get there. It always does.
With last-minute checks complete, everything's set.
Now we're just getting the lifting jack set up with the cables
and everything to the control unit over there.
Lower the vehicle back down, making sure all
the pins and everything engage.
Then basically it's...
Final components underneath on the bogies are connected up
to the brake system and once that's done then the vehicle will go back
to the carriage works across the road for basically a final exam.
We've got to make sure the job's right, everything's right.
20 tonnes of railway carriage must be gently lowered back onto
the bogies. First, each one must be wheeled into position
at either end of the carriage. Millimetre perfect.
Whoa.
Push it, Mike. Just push. Sorry, that's your finger. Whoa.
Gosh.
It's like a Starship Enterprise.
Right, everyone happy?
Right, going down.
After
a few anxious
moments,
the carriage docks perfectly with the bogey.
Yeah, you're entering this end.
That's a big weight off my shoulders
having it on its wheels.
It really is.
Oh, that's lovely, that.
I think once the vehicle's settled down,
I think it'll be about right.
It'll be pretty much bang on.
Happy as a pig in love, I told you.
All that remains is for Jonathan
to tighten any connecting bolts.
And with that done, this train is a step closer to active duty.
All the doors have been checked, the
brake systems have all been checked.
In fact,
Everything, basically, part of our exam routine has been checked
and signed off, ready to go.
So that side of things is great.
So it's just basically off we go now.
Refurbishment work is labour-intensive and time-consuming,
which means that Jonathan and his team would rather do a good job now
than have to do it again later.
Seven years before it needs a repaint and the interior will go
for longer because it's not highly used. It's not out there every day.
It's just afternoon teas or dining train.
So it's, I don't know, 15 years.
Hopefully the bogeys will see me out now.
I should hope so anyway, after the amount of hours I've put into them.
And despite the grime that he can never get out from under
his fingernails, like every other railway man and woman,
it's the romance that truly endures.
I absolutely love it. I love the railway. I love the people.
Hey.
Coming to work is just like another family.
We are just one big family and we all look after each
other. If we've got a problem, we'll try and help each other.
It's not just a team, it's family.
The railway is a family.
With just a few hours to spare,
the buffet carriage heads off for its
final safety checks.
Gone. Done. Over the road
for finalisation.
Thank god for that.
After that.
The Great Central Railway runs for just over 8 miles
from Loughborough to Leicester
and it's currently the only twin track heritage railway in the world.
Heritage railways are keen to recruit and keep young staff,
which means the long apprenticeships
of the past are a thing of the past.
Back in BR days, for example,
they'd have been doing 20 plus years on the shovel
before they'd even have been dreamed
of being promoted to being a fireman.
Whereas these days,
It's really based on your ability.
Have you, do you know enough about the locomotives?
Do you know enough about railway operation?
I love it.
You've got to love it.
There's no point doing this job if you don't,
because you need a bit of dedication
and a bit of patience.
Even here, you're probably not going to be.
We get some people coming down and they want to
Go straight for driving well unfortunately it doesn't work
that way you know it's uh you need
to uh serve your time as it were it's a hard old job
at the end of the day and it's uh can be very
dangerous if it's not done correctly
so uh yeah you need to take your time and enjoy it. It's now
7am and Aaron needs to ensure that the pressure
is heading up towards 180 pounds per square inch.
How you doing mate? I'm doing good mate very good.
Is the level going the right way? It's going up
40 pounds.
That's pretty good, oh.
Spend it. Lovely jubbly.
Well now we've got a nice wedge of pressure on there we can start to
test the injectors. The injectors are the bit
of equipment on the engine which put water into
the boiler or replenish the water in the boiler.
We use these valves down here so we've got two
valves there indicated by the colour
and another set here so I'll give that a try now.
Because steam engines rely on huge amounts of pressure,
it's vital that all valves have
been fully tested before the train leaves the depot.
So that one's working. We've tested the injectors,
everything's pretty good and ready to go.
I think I'm going to go get changed
and get into something more presentable.
It's comfortable.
After just over
two years under
construction,
the hotly anticipated £3 million Carnarvon station will have
its grand opening today.
And manager Stephen Gregg is hoping
that his prawn sandwiches will be the talk of the town.
The station is designed to serve as a gateway to the 26-mile
Welsh Highland Railway line through Snowdonia to Porthmadog.
And it's hoped it will add an extra 5,000 passengers each year.
So it's vital that today goes smoothly.
Do we want to make it so that people can walk around both sides
and then the staff are at either end?
Yeah, because otherwise you're going to get a little... people queuing.
Yeah, I think so. Something that needs to come out a little.
We're going to do diamonds or...
I think the thespian in me likes the theatre to be right.
So this is all part of the art of performance
and the artist side of me.
So I just want to make sure everything looks amazing.
Yep, that looks good.
Boredah, boredah, boredah.
Do you see?
Suited and booted, and confident
that the sausage rolls will be ready in time,
Stephen is ready to join in the excitement.
So, I'm now going up to Dinas to go
and do meet and greet with all the guests
and come on the train with them down to the station.
Time to go.
When the Welsh Highland Railway opened in 1997,
it only ran for three miles between Carnarvon
and the next station, Dinas.
Exciting!
So here we are in Dinas, this is the Goods Shed,
and this is where we're doing our meet and greet.
So this is where the 170 guests are congregating.
And over here they're going to collect a name badge
from our volunteers that are working on the tables here.
And then we're going to get on the train, and from here we're going
to go down on the train to arrive at the new station.
And 25
minutes
after
leaving
Dinas, hordes
of expectant,
and
hopefully
hungry,
guests
arrive
in Carnarvon.
The new station is designed to cope with 200 people at arrival
and departure times.
Which means today is the perfect test run.
But before Stephen's sandwiches
are put to the test,
it's time for the chairman
of the Heritage Lottery Fund, Sir Peter Luff.
My lords, ladies and gentlemen,
welcome to the Ffestiniog and Welsh Highland Railways
and welcome to our new Penygyn station.
This station is modern. There wasn't any old station here to restore.
This is an old railway site, it dates back to 1828,
but it was never a station site.
So this railway, very deliberately, looks to the future.
Sorry, sorry, sorry.
Now it gives me real pleasure to declare it open.
I'm just so impressed
with the staff. They've
done it all themselves.
Have you really?
What do you think, Dave? What do you think?
This is the first time we've been here,
Here is this, it's been finished.
And with his work here done, Stephen and some fellow travellers jump
at the chance for a free ride back up the line.
Someone else will be doing the washing up.
After labouring for ten days straight to rebuild a pair of bogies
and reattach them to a refurbished buffet carriage,
foreman Jonathan Valentine and his colleagues
at the East Lancs Railway can finally pause for breath.
Today is afternoon tea day,
the pair of them roll out the shed together and then
put on the back of the service train that's up there
and then all the customers at 11.55 can
get on and have a nice afternoon tea
and I can watch my hard labour roll up the countryside
and hopefully go with it on the first trip
to make sure they're all right, touch wood,
they'll be fine.
And for all these railway romantics
Today is all about much more than just a job well done.
I am very happy these two are ready to roll, happy and relieved,
Thank you very much.
and you know really proud of the team
and what they've achieved in the time scale they had.
And today's afternoon tea service is not just about whether there
are enough scones and doilies on board.
It's a chicken and egg situation where you've got
to invest in the vehicles, get them out there
earning money so then we can actually back invest
in bringing people into the organisation to
actually help us run the railway.
The team have done such a wonderful job that you just
you can't thank them enough.
You know I've put stupid amounts of hours in to get them ready.
This was a wreck when it came in, there was so much rotten panels
in it, so many rotten corners, you know,
they've all just done a brilliant job and I can't thank them enough.
For the one hour,
45 minute trip
through Somerset
Ramsbottom
and Irwell Vale.
Today's 85 passengers probably agree that today has
been the grandest of grand days out.
It's the only way to travel, isn't it? It's something that's been saved
and the engines themselves have a life.
We were brought up with these steam trains.
When we were lads we wanted to be an engine driver.
A chance to travel in the old railway carriages.
And to experience what people experienced years ago.
