A350-2000 & A220-500 News

Warship And Aircraft
72 followers
AI Generated·May contain errors
Video Summary
AI GeneratedAirbus is evaluating the potential launch of two stretched aircraft models, the A350-2000 and the A220-500. Commercial Aircraft CEO Lars Wagner indicated that a decision on whether to proceed with both, one, or neither will be made within the next 12 months, with a potential timeline extending to 2027. The decision depends on feasibility studies, supplier talks, and financial viability.
A very warm welcome back to the channel.
Airbus, while they're inching closer to deciding the fate
of their two upcoming stretched models,
the A350-2000 and the A220-500, with a decision expected
Within 12 months, Airbus' Commercial Aircraft
Chief Executive Lars Wagner set, well, really
2027 as a timeline after what has been a 12 months
of speculation about the fate of these
upcoming models.
Speaking, Wagner said the decision was expected within 12 months
and would centre on whether
a launch will proceed for both variants, one or the other.
Or neither. The two aircraft, which don't have firm names,
must be known, but have just been
recognised as the A350-2000 and A220-500 by us,
represents the next iterations within their
respective families, and you can probably evidently tell through
the numerical value that
it suggests, yes, these are stretches beyond
the largest current members in each respective family.
To address a wide range of opportunities,
so much as requests that are present from airline customers,
The launch in both cases,
Well, it depends on whether Airbus gets
the all clear for so many pillars, whether it's the
feasibility studies, direct talks with suppliers.
It's not just airlines being willing to buy them.
Can Airbus actually move forward
with these without it hampering itself financially beyond
just an order standpoint?
The proposed A220-500 is where I'll begin as this has been a topic of
discussion within the industry for most of the 2020s,
representing a stretch on the family.
And the goal, well, it's to carry more pax.
passengers and ultimately bring the aircraft closer
to the A320neo in capacity. Bringing
the A220 platform closer to the A320neo
is largely the appeal of the type. Instead,
for airlines seeking large capacity across regional
and secondary city operations,
they can bring the A220-500 on without being forced
to introduce another aircraft family.
While the A220 and A320neo are produced by the same manufacturer,
as cited by Breeze Airways
before they abandoned their own interest in the larger model,
the jump between the two families
was enough to add complexity and derail operations financially.
As a result, having something like
the A220-500 maintained commonality
and meant that they could avoid bringing in the A320neo
in an ideal world and all the associated responsibilities,
for it's not just a new
aircraft that they have to get used
But there's the crew situation, pilots,
cabin crew, and all the maintenance,
air parts, training, and more that has to be considered
when putting it on the network.
As a result, well, if something like the A220-500 existed
in an era where secondary cities have
become even more important, well,
it means for airlines not the requirement to bring on the 320
NEO. Airbus has said the Dash 500, well,
it could launch if it secured anchor airlines. So what's
that? Well, several airlines that would support
the launch with purchases. However, even if the
manufacturer got those anchor airlines,
it still needs the all clear from the board. Suppliers and
And studies are currently underway.
to determine whether this project is even feasible,
even with those anchor airlines.
AirAsia has been the most recent supporter of a stretched model.
Coming out remember with the largest ever order
for the A220 family at 150 and it was pretty
clear that if Airbus ever moved ahead
with developing the new high capacity variant it
would if anything double its order
and really commit in numbers to the Dash 500 that being
the clearest case of interest.
Questions though remain about the engineering, the addition of
seats on the aircraft
and how overall you'd be looking at a limitation on routes so much as
the performance you don't want to necessarily
Is the trade-off going to actually be worthwhile?
More capacity, but maybe say cuts elsewhere.
That is something that has to be considered
because naturally Airbus would like to do
anything possible to limit the overall performance loss.
Ultimately, the Dash 500 is not as complicated
as moving forward with a clean sheet design.
However, it still requires significant development research
to understand what changes can be
incorporated to improve efficiency.
The largest stretch being studied is the Dash.
2000 from the A350 family, an answer to the 777-9
and help also answer airline's calls
for larger twin jets to meet their capacity requirements.
Similar to the A22500, the 350
stretch remains a concept that is intended to ultimately,
well, if we're being honest,
improve overall capacity,
and the commercial logic therefore also being different. If pursued,
this model would become the largest jet in production.
It released, remember, after the
The plane maker needs to be able to assess whether
or not airlines truly need the additional
capacity.
It's fascinating to see what airlines want,
what manufacturers are studying, and now we're
reaching a point where a decision needs
to come within the next 12 months.
Is it going to be a detrimental to the overall production,
which we know has struggled so
much in the last few years?
Or is the benefits very evident?
I'd love to hear your opinion down below,
but we're getting closer and pretty soon we'll
know whether or not we have both of these two new variants launching.
Maybe it's just one or it's none at all.
