We are a couple who are building our own home from the ground up in the mountains of West Virginia. After living near the city our entire lives we finally decided to sell it all, pack up our 3 kids and live in an RV on our 73 acres while building our own debt free, off-grid house and learning to live a more self-reliant life. Our house build is documented entirely on our main channel "Wild Wonderful Off-Grid" and the buiness/work related side of our life can be found on our secondary channel "Josh and Erin- The After Show". Here you will see us renovating our Cafe, opening/operating the Cafe with goods from our farm, building/furnishing/running our short term rentals, finding/operating our other real estate investments and more.
AI Generated·May contain errors
Previously, we worked our way around the foundation,
laying the sill sealer and installing the sill plate itself.
We drilled in anchor bolts where they were missing
and began building onto the backside of the existing A-frame house.
We're just tying the existing house into the new house
with these new floor joists going into the old 2x10 floor joists.
Now it's time to start working on the drain system,
backfill the foundation, and start building up.
I knew you were going to say it already.
Time to test this.
This morning has been spent back in the trench around
the foundation getting all of the dirt and
the rocks that have once again fallen in there all cleaned out
because we need to get in there
and do some waterproofing. This is going
to be a multi-step process that's going to start with
painting on the rubber membrane onto the side
and this is going to allow us to actually backfill
everything that's around the foundation.
So step one, break out the rollers and start waterproofing.
Get this thing back, there'll be a huge safety improvement.
No more tripping hazards. I know you're talking about it.
This has tried to kill me about 10
different times. So we got our five gallon buckets.
We'll start on the east side of the house.
It's received a lot of sunlight so far.
We'll start working around the sides and go towards
the back. The back side has seen zero sunlight
so far so it's still a little damp a little
little wet. The foundation wall is good.
It's just where the footer itself is at because we want to
paint the footer itself and also the wall
this little crack area right there. There's no water
seeps in so we want to get that but that area
on the back side still a little damp.
So we'll wait. We'll start the east side first and work our way around.
This looks like this is going to be messy. Uh-huh.
We just got started and you already have it on you. Do I really?
Yeah. So we are going to go ahead
and chalk a line just so that we know where
our stopping point is at. Back window time. Look at that. 20 inches.
Is that right? I have no idea. That's 16. That's all part of my job.
Let's do 16. We need to come up a little bit. Let's do 16.
Yeah, you're the one who does the measuring.
I know. Unless it's three little lines.
It's above my pay grade. Yep. You do all the emails.
Thank you very much.
It'll sail easy. We'll be done that time, girl.
In the high road.
I'm starting
to speak now.
You started dating me
all those years ago.
I think that you'd
be tarring a foundation
wall with me.
Nobody else I'd rather be tarring
a foundation wall with than you, babe. Thanks.
We're only going
to be applying
this waterproofing
membrane to the portions
of the foundation
that are going to have a crawl space.
So that means we're not going to be touching
the portion of the foundation that is around
the safe room because it's not going to have
a crawl space and it doesn't need it.
And we want to protect this crawl space
and do the best that we can with this last portion
of our house build because we really need a break from house building.
and of course we might be building houses with the boys
and ellie later on but there's going to
be a good gap in time there of like what six years
at least before one of them wants to build a house
so let's do it right the first time around we're good we're
on that side of the drive and we'll move on
Before you guys know it, we're going to have it backfilled
and you're going to be able to walk directly into the mudroom.
That's going to be nice.
All right, so take that dunnage, put it over here.
Take those 4x4s and these 2x12s
and put it on top of that dunnage to stack that nice and neat.
That's all scrap lumber.
This is still stuff to be used.
Okay.
All right.
You got it?
Yeah.
You sure you got it, girlfriend?
Yeah.
Now the foundation is...
Now the membrane...
Now the membrane...
Now the membrane...
Now that the...
Okay.
I talk too fast. I know you do.
Now that the membrane is dry the next step for us to do is take
our corrugated pipe our French drain
and we're going to wrap it around the entire foundation
itself then once that's installed we'll put 57 stone
on top of that then once the 57 stone's done
It's done.
Our...
Sediment shield goes on top.
When the sediment shield is on top, then we backfill everything.
This already has a, like I say, sediment shield you can call it,
or a sleeve on top of this corrugated pipe.
I'm not taking it off, we have it.
We'll put that in there, put the stone on top,
then sediment shield, and we're gonna rock and roll,
backfill this thing, and then we'll jump, tuck, and roll.
Got it?
Yeah.
Perfect.
That was the
awkward thing
to try and move.
I don't know that.
Are you okay?
I'm going to be so glad for this trench to be gone, like seriously.
I hear it all the time.
We worked our way around the entire
foundation with the perforated pipe.
So the next step for us to do is tee this thing.
So we went all the way around
and we're going to take our tee.
We're going to cut it right here. Perfect.
It's going to come just like that in the foundation.
We're going to get a non-perforated
pipe that comes off of here that goes out towards the driveway
and flows away from the house.
I think I'm pretty good at doing a lot of things,
but there's a few things I'm not very good at,
like painting, decorating, wrapping presents,
and especially gifting presents. But this year,
Ridge is making it very easy on me with one
of the biggest sales of the year for Father's Day.
This video is brought to you by Ridge.
The new leather wallets are durable, classy, minimalist
design, lifetime warranty. It means they're perfect for my dad.
I even ordered some for myself.
This wallet right here is my construction wallet
that goes into my pocket with all my tools.
This wallet right here is sleek, sophisticated,
it makes me think I need to buy a new suit.
Ridge wallets hold up to 12 cards plus room for cash
while remaining as slim as possible.
I'll admit it, I used to have an old bi-fold wallet
that was all blown out, just like my dad did.
No offense, dad, you're gonna step into the 21st
century just like I did a few months back.
There are 30 plus colors and styles
including carbon fiber, burnt titanium,
Forged to Ember, Burnt Damascus, and many more.
Designed with RFID blocking materials
that protects you from digital pickpockets
and optional AirTag attachments
so that you never have to lose your wallet again.
The Ridge team is so confident
that you'll like it, they give you 99 days to try it.
If you don't like it, you can send it back for a full refund.
But with over 50,000 five-star reviews,
I'm sure you guys are going to enjoy it just as much as I do.
You can find the best Father's Day gift using
our link, ridge.com slash wwog.
And right now, you can save up to 40% through June 15th.
That's ridge.com slash wwog.
Hop
in.
While we wait for our rental
equipment to arrive
so that we can get the french
drain and also the foundation back filled,
we figured we would go ahead and finally get these barn doors hung.
It's about time girl.
Long, long overdue.
Long overdue.
I'm pretty sure that we actually thought we were going
to get these hung either last week or the week before last.
And then we got distracted with the house build again.
And then now we're back to this.
Let's cafe.
We've got a lot going on.
Yeah.
I'm starting to think that we probably are like ADHD.
Very hyperactive.
Very easily distracted.
Very productive.
So we put it to good use.
Definitely productive.
But we're also a little crazy.
Taking on a lot.
We like it that way. I do.
Oh, so you're walking all the way back in.
There's two ways of doing this.
There's an easy way and a hard way.
It really doesn't matter which way we do it
because if we do it the easy way or the hard way
it's still not going to really line up
because the way we built this portion
is different than that side.
So nothing's really straight here, it's an old barn.
It's the only structure that we had here when we moved here.
So nothing really lines up.
Why would we do it the hard way and not the easy way if they're
both going to turn out the same?
Because you're not going to like it the way I want to do it.
Why?
Yours is the hard way. It's going to be because I know you.
That's why. All right well let's hear
them. Okay so we're going to attach it directly
to this right here on the front of this and on
the front of the other side so it overhangs
a little bit and you're going to see it kind of
Sticking out inch and a half coming up and coming in.
It's gonna be attached directly to this. That's the easy way
Okay, the hard way is to actually pull it back flush.
You won't see anything bulging out
Okay, we do that. It's still not gonna really line up
because the entire thing's like this. What do you think?
I knew it.
I knew it. I knew it. I knew it
We do it the easy way, see, the answer and the smile,
no answer and the smile behind
the camera, I know which way you want me to do it,
and I'm not doing it that way.
Then why'd you ask?
Because if I didn't, if I didn't say something,
you'd be like, how can we do it like this?
And I alleviate that entire situation by saying,
giving you both options and telling you the
option of which way I'm going to go.
Okay, so we'll just do it your way and have it look like .
it's just a barn let's start
with the uh 2x12 we'll bolt it directly to here going across and
tie it in we're going to run a 2x12 across
the entire opening we're going to lag it directly
to the post once that's done we're going to go ahead
and mount the rails directly to a 2x12
then the doors go on
That 2x12 span is roughly 12 feet so we want to take this block
and put it directly behind it right
there in the center and lag everything together
so it's all stationary so it's not wobbling back and
forth. So it was a 50-50. She was right, I was right.
And this is why we work so well together guys.
Like I said the barn was built kind of like like
that so I attached it to the one side it was
actually even with the siding popping out
and they didn't use siding on that portion they just had
the entire post sticking out too far that way
so I had to cut down shove it in behind the post kind
of just a nice good even flow.
So he was right on that side and I was right on this side. You know
I like the way it looks better this way.
You know what I mean? And we are going to stain this just
Let's just see you guys now.
Probably not today because it's more important that we get back to the
foundation when the machine arrives.
We'll get it next spring.
That's right.
Stop, stop, stop, stop, stop, stop, stop.
You
call
that
a moo?
You see Dexter's here because he's looking for Elsie
and he lost track of her
and she probably intentionally left him behind because he's annoying.
He's annoying, right?
He's crazy.
He can't even moo right.
Right.
He's a disgrace of a cow.
Wow.
Ha, ha, ha.
Look we see Lily. Lily? Yeah. Right there.
Oh wow. I see her okay. Yeah. Look at her too.
She's running back to us.
Leon's calling for us.
Leon, gentle. Gentle Leon.
You came to say hi huh?
Do you like her Leon?
Ha, ha, ha, ha, ha, ha.
Lily go over there. They all want to play.
Don't worry about those unstained boards babe.
I'll get some next night. I agree.
That's good for my house.
I like it.
That's
what
it is.
It's not cool.
What's not cool?
He's wearing my flannel.
And you're wearing my flannel.
Twinsies.
I called a car this morning.
I said, Carter, I need an errand.
Hey, Haiti, you're looking good.
I need a flannel.
Come on.
Both of you guys are wearing my flannel.
I don't.
Well, yeah, not you, but him.
Come on.
Both of you guys wear my flannels on.
I don't.
Well, yeah, not you, but him.
You haven't gotten my size yet guys. He wears your t-shirts.
What? Am I sure you're wearing them?
It is your turn.
I can wear that one.
So we are all ready to start backfilling.
We've got the machine here and a nice big pile of gravel.
So the first thing we're going to do is start getting that stone
into the trench. Then we're going to put down the sediment shield.
Then Josh is going to work his magic on that machine
and get us all backfilled. Yes.
And it might be a little bit overkill.
What's a little overkill?
Putting that, putting the, uh,
the grand towel in.
You look good with that shovel, kid.
You don't have water issues up here on the mountain.
So, you're a good guy.
We'll see.
Take it in place, guys. Come on.
We have a few areas we can't reach with the machine.
The ditch is a little too wide,
it's a little too far back,
and, uh, too high up.
I can't get the bucket over top of that ditch.
So, we're shoveling everything in by hand.
The closer areas,
we're obviously gonna dump in with the bucket.
It's not too bad.
We should be done in
about 20, 25 minutes.
So we
are good all
the way
on that side
of the safe
room and all
the way down
this
back side. The last area that we need to fill
is right here in front of me and then just that
small portion around the front and then we can start backfilling.
This is a non-perforated pipe.
It connects to a perforated pipe and it takes the water away from
the foundation out into the yard.
Right now we're going to have it and bury everything and we're
going to get a machine and dig down a little bit
so we can bring everything out and have it
sloped down properly. We're burying it right here
to get the foundation covered up. You can see the
pipe actually land up on the land and we're going to come back
and dig everything down so the water
The water flows away from the house.
Lily, don't even think.
No, Lily.
Lily, get out of here.
Come on. Out, out, out.
Get out of here.
I'm silly, girl.
Be back.
Looks
good.
Oh, my goodness.
You're peeing.
Just testing the drain lines, Josh.
Thank you.
Okay.
Woo!
Who does that?
Seriously.
I'm back, though.
Silly.
As a side note we are going to be backfilling
but the final grading is not done so ultimately
when it's done the land is going to slope away from the house
and then it's also going to it's
going to like swell so it's going to come both directions
and then run off but right now we're
just backfilling and we're not actually like digging
into the entire final grading around
You want some rice strawberries?
How about some fajitas for dinner?
You can stir up the sweet potatoes while they cook, okay?
Stir.
After you're done with your salmon.
And so I cannot wait for it.
And then, if we got pear ones, we don't have to buy anything.
Once I started backfilling around the foundation,
I realized really quickly that we got to start
cutting a lot of dirt out behind the house
because the top of the foundation wall was
roughly like this and the dirt mound was about that high.
So we took the skid steer and started
cutting everything out down below
and we started backfilling everything. I tracked in around the
foundation itself.
Now it is safe for kids, Aaron and I, to walk around, hop in, hop out.
There's no more hills and big ditches and everything.
It's all backfilling and we're
Down to grade.
Temporarily for now. Right now this machine's
not really big enough to pull all this dirt out of here.
It's way too much cutting.
A few months from now we're going to get a dozer here
and we'll start pushing everything out
and pushing everything back away from the house
and drop the grade down so everything flows away from the house.
But what's happening here in the near future is we're going to start
laying block, build the subfloor, build the walls, house goes up.
That's what's happening next. You guys can't tell I'm excited.
I'm ready to build the ****. You know what I mean?
Can't say that.
She'll beat
me out.
Are you cooking, Peters?
I don't know what's called.
I don't think I want you to know the proper way
to pronounce it because I like the way
you say it so much.
What is it again?
Fajitas.
Fajitas.
I can't say it.
Fajitas.
Fajitas.
What is it?
Fajitas.
Fajitas.
Fajitas.
Fajitas.
There you go.
It's amazing.
I
can't
wait
to
eat
it.