Exploring the factory behind Europe's largest military aircraft production

Fluctus
2 followers
1 Video View·Nov 12, 2026
Hello everyone and welcome back to the Flectus channel.
Military operations always require transport
aircraft capable of supplying cargo efficiently
and quickly.
This is why new aircraft of this type
are constantly being developed,
always seeking to improve various aspects such as cargo capacity
or reduction in fuel consumption.
An example of these aircraft
is the Atlas A400M developed by Airbus.
to replace aging transport aircraft such as the
Transall C160 and the Lockheed C130 Hercules.
Different European countries needed aircraft
with greater capacity for strategic and tactical
airlift missions, including transporting heavy
and oversized cargo, performing airdrops and
medical evacuation. That is why
Airbus began developing
the Atlas program in 2003,
beginning its assembly in 2007 at its facilities in Seville.
in completing the aircraft with its first flight in 2009.
This A400M was part of the first 180 planes ordered
by seven European countries,
being delivered
from 213 onwards.
Airbus has factories located in different European countries
that manufacture this enormous aircraft.
These sites are responsible for creating specific components
or sections of the aircraft
to be later put together in a general assembly site.
In Germany, skilled technicians and engineers work in the Bremen
and Stade sites for the fuselage
section, manufacturing and the pre-assembly process of the hydraulic,
electrical and flight control
systems.
Two components like the center wing boxes
and the plane's radar
and measuring systems are
manufactured in the Nantes factory in France.
With dedication,
the workers at the Tablada facility in
Spain focus on preparing the power plant,
flap support bearings and horizontal tailplane.
This facility also implements a digitalization environment,
linking people and systems in an
operational ecosystem to streamline production.
Once each sub-assembly and component are manufactured,
they are transported inside
the giant Airbus Beluga carrier,
which has an extraordinary
carrying capacity and long-range capabilities
to move large components like the wings and fuselage
sections. These components are sent to
the main assembly site in San Pablo, Spain.
where various stations are responsible
for assembling specific sections.
At station 72,
a dedicated team of experts oversees
the structural integration of the wings
and the installation of the engine pylons.
Advanced testing methods in station 70 are
employed to check for wing fuel leakage,
detecting even the smallest irregularities.
With the fuselage assembled,
the technicians mount
the plane's
four Europrop TP400 engines and the auxiliary power units.
The avionics and digital systems are routed throughout the assembly,
and the necessary software is installed
and tested. With the plane assembled,
its exterior is painted with the aircraft's livery,
markings, and protective coatings
expertly applied. Finally, the A400M makes
its first flight after completion,
showcasing its robust structure,
advanced avionics, and powerful engines.
When the A400M begins an operation,
whether in real missions or during exercises such as Mobility Guardian,
the same preparation procedures are carried out before takeoff.
The mission overview, including the objectives and instruments used,
is specified during the mission briefings.
With such information, the crew is prepared
for the possible conditions that might be ahead during the flight.
If cargo must be transported,
it is distributed inside the plane depending on the type
of weight of the load to ensure proper weight distribution.
After the pre-flight inspections on the landing gear,
control surfaces, and engines,
the plane is taxied onto the runway.
Here, the pilots check with the air traffic control
to ensure they have the final takeoff clearance.
Thanks to its design and the capacity of its
engines, the A400M can perform steep angle takeoffs.
Its four Euro prop engines can produce
approximately 1,100 shaft horsepower,
giving the necessary thrust to achieve those climb rates.
This plane can create more lift at lower speeds
by combining high lift devices like the leading
edge slats and trailing edge flaps. This helps
the A400M to take off in short runways or on
prepared airstrips, which is ideal
for the tactical capability of this aircraft.
During the preparation of aircraft such as the A400M,
even during moments such as assembly or maintenance,
technicians seek to implement tools that make it easier
for them to carry out these procedures,
ensuring greater speed and precision in their results.
Of these tools, there is the Electrical Hoist Kit,
developed by Airbus' Ground Support Equipment Team,
which is used to install the engines on planes or test beds.
This kit is designed to facilitate the precise
and efficient handling and mounting of heavy
aircraft engines. It comprises a ground power supply,
a central control unit, and two rear and
front electrical hoists. Such hoists are connected
to the control box that is already pre-programmed
with precise loads and characteristics
for the entire Airbus fleet.
Although Sweden was not a
direct participant in the Cold War,
the country is still renowned for maintaining its fleet of
of fighter jets in that period.
In 1979, the Swedish aerospace and defense company Saab
started developing a multi-role fighter jet
that could obliterate both air and ground targets,
as well as provide surveillance.
The outcome of these efforts
was the JAS-39 Gripen,
a delta wing and canard configuration aircraft,
which looked like something out
of a science fiction movie.
Despite being designed in the 1970s,
the Gripen did not have its maiden flight until 1988.
particularly due to an extensive testing and improvement process.
Saab has partnered with multiple other companies
to produce various components of the JAS 39
Gripen, such as fuselage, wings, tail, landing gear, and weaponry.
The process of assembling this aircraft
is mind-blowing. Initially, various components
are put together by hand at one
or more facilities and shipped to a main plant
for final assembly, where these components
are joined together to create the final aircraft.
Later, the technicians integrate major systems with the aircraft,
such as flight controls, navigation, communication, and sensor suites.
Gripen was specifically designed
to conduct missions in harsh environments
and from dispersed air bases.
It can be airborne right after the scramble signal,
requiring only engine start and final automatic start-up tests.
The key to operational efficiency
is to get fighters airborne when needed,
which is why Gripen was designed in a way
that maximizes its availability.
The aircraft requires a road strip
as long as 16 by 800 meters to operate.
Hence, it can be deployed from extremely short runways,
taxiways, and even highways.
Moreover, the aircraft has been designed
to have a minimum turnaround time.
For instance, one technician
and five conscript mechanics can complete an air-to-air combat setup,
including refueling and rearming in less than 10 minutes.
The Gripen is capable of performing a wide range of missions,
including air-to-air combat,
air-to-ground attacks, reconnaissance, and electronic warfare.
The Gripen's unique delta-wing design
and canards drastically improve its overall stability,
whereas its fly-by-wire control provides exceptional agility
and maneuverability.
Although Sweden primarily operates this aircraft,
it is common for airmen from different allied
nations to encounter the Gripen in flight.
Aircraft manufacturing is a complex process
that has faced several challenges,
which have been overcome thanks
to the work of engineers and technicians.
This work can be seen at Boeing facilities,
where the company takes advantage of its resources to
manufacture its enormous fleet of airplanes.
Within this process, building the fuselage is
one of the central points in creating an aircraft.
The company has undergone significant advancements
in recent years, implementing automated systems
as aiding tools for the factory workers.
This includes the use of pairs of robots
in the forward and aft sections.
However, in recent years,
the human component has still been the main focus,
so the company has kept using robotics as a tool to enhance
but not replace the work of
the technicians. Once the main sub-assemblies have been built,
one of the steps to continue
involves the painting process.
In places like the Everett facility, the factory has established an
area dedicated to painting airplane wings,
using the latest painting technology and automation.
An example of this innovation is the automated spray method,
where robots are used to apply multiple coats
of paint with precision.
This ensures consistency and good quality while not wasting paint.
After drying the pieces,
sub-assemblies would be finished to assemble the entire aircraft.
These steps are followed for all Boeing models,
built to ensure consistency.
That's the end of this video.
I hope you enjoyed it.
Make sure to subscribe
to this channel so you don't miss any
of our new content. See you next time!