US Navy unveils the world's largest aircraft carrier from dry dock

Fluctus
2 followers
Oct 30, 2026
Hello everyone and welcome back to the Fluctus channel.
For more than a century,
Newport News Shipbuilding, a division of HII,
has been responsible
for constructing every nuclear-powered aircraft carrier in the US Navy.
From the groundbreaking USS Enterprise,
CVN-65, to the advanced Gerald
R. Ford-class carriers,
Situated in Newport News, Virginia,
this historic shipyard covers more than 550 acres along the James
River. It continues to serve as the sole designer
and builder of nuclear-powered aircraft carriers
for the U.S. Navy. It is also the only shipyard equipped
to conduct mid-life refueling and highly
complex overhauls. The U.S. Navy currently
operates 11 active aircraft carriers.
Every one of them was constructed here at Newport News Shipbuilding.
Among these, ten belong to the Nimitz
class, commissioned in 1975,
while one is part of the newest class, the Gerald R. Ford class.
The lead ship,
USS Gerald R. Ford,
CVN 78,
was commissioned
on July 22, 2017.
Named after the 38th President of the United States,
the ship honors his service to both the Navy and the nation.
This massive vessel measures two and a half football fields in length
and half a football field in width,
capable of supporting approximately 4,540 sailors
and operating more than 75 aircraft each day.
Although the hull designs of the two classes are largely similar,
the Gerald R. Ford features cutting-edge technologies,
including the Electromagnetic Aircraft Launch System,
Advanced Arresting Gear,
Ship Self-Defense System,
Dual-Band
Radar,
and an
improved
weapons
handling
process.
Modifications to the flight deck have increased sortie generation
to about 160 per day,
with surge capacity reaching up to 270.
The Gerald R. Ford is set
to replace the Nimitz-class
on a one-for-one basis. At present,
two additional Ford-class carriers are under construction at
Newport News Shipbuilding,
USS John F. Kennedy and USS Enterprise.
USS John F. Kennedy is expected to enter service in 2027.
The ship's keel was laid on August 22, 2015,
and since then, numerous major milestones have been completed.
On June 22, 2017,
the lower stern was installed,
marking 50% completion of the superstructure.
Less than
a year later,
In February 2018,
HII announced that the ship was 75% structurally erected.
In late May 2019, the bridge
and island were lowered into position,
and two months later,
the final section of the flight deck was installed,
completing the structural assembly of CVN 79.
After structural completion,
heavy systems are installed and tested to confirm reliability.
Among the most critical systems on board
is the new electromagnetic aircraft launch system, EMALS,
which is responsible for launching aircraft from the flight deck.
The system was initially demonstrated through a no-load test
before progressing to the dead-load phase in February 2024.
During this phase, a wheeled,
car-like platform weighing up to 80,000 pounds
simulates a real aircraft to evaluate the stress placed
on the catapults during actual launches.
From Kennedy's bow into the James River,
the platform is launched, recovered, and relaunched
repeatedly to verify that EMALS meets
the operational requirements for the Navy's
Navy's fixed wing aircraft.
In late October 2019,
another major milestone was achieved with the flooding of the dry dock,
where John F. Kennedy, CVN 79, was constructed.
It was a powerful moment, celebrating
the dedication of all the teams involved.
Gradually, more than 100 million gallons
of water filled the dock over several days.
As the water level increased,
the ship began to rise from the blocks
that had supported it since keel laying.
For the first time, USS John F. Kennedy was afloat.
Once fully floating, the carrier was carefully
guided out of the dry dock and into the James River.
Six tugboats maneuvered the enormous vessel
to Pier 3 at Newport News Shipbuilding,
where it would undergo outfitting and begin its testing program.
Sailors assigned to the Pre-Commissioning Unit John F. Kennedy
trained alongside their counterparts on other carriers,
practicing a wide range of operations and systems
prior to the ship's official entry into service.
They are guided by five core values—
integrity, humility, professionalism,
teamwork, and legacy—
that embody the spirit of John F. Kennedy.
As part of their preparation,
the crew takes part in underway replenishment,
UNREP exercises. During these operations,
sailors work together to simulate the transfer of fuel,
food, and supplies, performing complex maneuvers with supply lines,
and managing critical equipment
to ensure smooth
and efficient coordination between vessels.
In addition to carrier operations,
Newport News Shipbuilding plays a crucial role
in supporting other vital fleet assets such as destroyers.
Built for speed, maneuverability, and firepower,
destroyers represent a powerful striking force within the Navy fleet.
Maintaining operational readiness
is essential to fulfill their mission
of protecting major ships like carriers.
As a result, crews perform routine maintenance
every day to keep the ships at peak performance.
Essential tasks include lubricating mechanical systems,
replacing worn components, and conducting corrosion control
to withstand harsh maritime conditions.
Every system is carefully inspected
to preserve combat effectiveness.
For more extensive
maintenance,
destroyers are placed in dry dock
for phase maintenance or damage repairs.
One notable case
is the Arleigh Burke-class guided-missile destroyer USS Fitzgerald.
In 2017, the ship entered dry dock following
a collision with the merchant vessel ACX Crystal.
To rapidly
stabilize the ship,
USS Fitzgerald was towed to the ship repair facility in Yokosuka,
where technicians
and shipbuilders made significant progress in dewatering, defueling,
completing hull and superstructure repairs,
and placing essential systems into layup maintenance.
USS Fitzgerald was later moved from the dry dock
to a pier-side location in preparation
for transport to Huntington Ingalls Industries
for further repairs and upgrades.
At the HII shipyard,
Fitzgerald underwent both repair and new construction processes
to achieve full restoration and modernization.
Numerous components required replacement,
while others needed partial or complete refurbishment.
This work included hull mechanical and electrical systems,
along with command, control, communications,
Computers and intelligence and combat system equipment.
Critical systems addressed included the electronic warfare suite,
radar, switchboard, gas turbine generator, and air conditioning plant.
After two years of restoration
and modernization,
USS Fitzgerald returned
to the fleet stronger than ever,
ensuring an extended service life.
Like surface ships, submarines also undergo
regular dry docking to remain mission ready.
To start the process,
the submarine arrives at the port under its own power.
Tugboats then assist by providing lateral control
and ensuring a precise approach to
the assigned dock.
As the submarine nears the dock,
a crew member swings the weighted end of the heaving line
and throws it toward the quayside operators.
The added weight allows the line to travel farther,
enabling shore personnel to catch
it.
Once secured, the shore crew pulls in the heaving line
and loops the mooring line around the bollard.
The submarine crew carefully adjusts line tension
to maintain a stable position alongside the quay.
Additional lines are passed
and secured to prevent any movement.
When it is time for dry docking,
the submarine is unmoored and transferred into the dry dock.
Throughout this operation,
the submarine's commanding officer and navigator
coordinate closely with harbor pilots
who possess detailed knowledge of the port
to ensure safe execution.
Step by step,
the submarine is carefully maneuvered into the dock.
At the platform entrance,
tugboats disengage
and crew members assume control.
From both sides of the dry dock,
Multiple mooring lines are continuously adjusted
to keep the submarine centered
and prevent contact with the dock walls.
Once aligned, the dock is gradually drained
and the submarine settles onto keel blocks shaped to match the hull.
With the submarine secured, crews can easily access the hull,
inspect vital systems,
and begin required repairs and upgrades.
After months of maintenance, the submarine is ready to undock.
The dry docking process is reversed
as water is pumped back into the dock,
and the submarine gradually regains buoyancy.
Once afloat, personnel along the sides monitor its position
before tugboats take control
and guide it back to the pier.
Only one step remains before returning to operations – sea trials,
where comprehensive tests ensure all systems
function properly after maintenance.
From the towering flight decks of nuclear-powered aircraft carriers
to the precise dry docking of destroyers and submarines,
Newport News shipbuilding remains central
to the United States Navy's ability to project power,
sustain operations, and adapt to future challenges.
Whether it is the next-generation Gerald R. Ford-class
carrier preparing to launch aircraft with EMALS,
a battle-damaged destroyer restored
and modernized for decades of continued service,
or a submarine carefully returned
to the sea after months of detailed maintenance,
the work never truly ends.
This continuous cycle of construction,
overhaul, testing,
and training is what keeps the fleet ready today and credible tomorrow.
Newport News Shipbuilding is more than a shipyard.
It is a living connection between American industrial strength
and naval dominance,
ensuring that when the fleet sails,
it does so with confidence, reliability, and unmatched
capability. That's the end of this video.
I hope you enjoyed it. Make sure to subscribe
to this channel so you don't miss any
of our new content. See you next time.