ADOT starts next phase of I-10 widening project

Fox - 10 Phoenix
31 followers
2 Video Views·Oct 9, 2026
AI Generated·May contain errors
Video Summary
AI GeneratedADOT has begun the third phase of the I-10 widening project between Phoenix and Casa Grande. This 11-mile segment from Loop 202 to the Gila River will add a third general-purpose lane and HOV lanes to reduce congestion. While the highway will remain open, motorists should expect reduced speed limits and overnight lane restrictions until the project's completion in late 2029.
An important traffic alert for you this morning.
The next phase of the I-10 widening project between Phoenix
and Casa Grande begins near the Loop 202.
So ADOT spokesperson Marcy McMacken is live this morning at the
Firebird Mortar Sports Park with the very latest on this ADOT project.
Good morning, Marcy. Good morning.
All right, so let's jump right into it.
This is going to be another big win for those folks
that are traveling south of the valley.
What can they expect here in the next couple of weeks?
Yeah, so the third of four
Our project segments for the I-10 widening between Phoenix
and Casa Grande is starting
active construction.
And that segment is located closest
to the Phoenix Chandler area on a 11-mile stretch
from the Loop 202 down to about the Gila River.
And in this segment, crews are going
to be adding a third general purpose lane.
They're also going to be adding an HOV lane
in both directions between the Loop 202 and
Riggs Road, and then reconstructing the Wild Horse Pass,
Clean Creek, SR 347, and Riggs Road interchanges.
We want motorists to know that the speed limit
is going to be reduced to 55 miles per hour
throughout the corridor during active construction.
And the good news is, though, that I-10
will not be closed during active construction
in order to minimize the impact on motorists
in this highly traveled I-10 corridor.
But there will be overnight lane restrictions.
When you talk about those lane restrictions, Marci,
is it one lane in each direction, portions of those overnight hours?
Or what can we expect during that time frame?
Yeah, so there will be one lane restrictions overnight.
And those overnight lane restrictions will usually last
from about 9 p.m. to 5 a.m.
So motorists can get updates on these lane restrictions
by visiting i10wildhorsepasscorridor.com.
When all is said and done though, Marcy,
you're adding an additional lane plus an HOV.
So this is going to really, I guess,
help those folks that travel that I-10 corridor
a lot.
Yeah, yeah.
So if you've traveled this section of I-10 between Phoenix
and Casa Grande, you'll probably
have experienced that high traffic congestion
and increased travel times as you enter and
exit the Phoenix area.
So the purpose of this project by adding
that third general purpose lane in both directions
between Phoenix and Casa Grande is to help reduce
that traffic congestion and travel
time through that corridor.
How long can we expect this to last, Marcy?
This project began back in May of 2024,
and it should be completed by late 2029, so about
another three years.
And I remember we chatted with Marcy about
the Broadway curve, and if this is going to
look something like that, great job, Marcy.
Great job to you and your crew out there.
