Taking on a first CLT project comes with new considerations—from early design and coordination to manufacturing, prefabrication, logistics, and installation. For AERA, getting those decisions right upfront was critical to creating a more efficient path to construction.
In this case study, hear directly from the project team about their experience working with Sterling Structural and how early collaboration, design and manufacturing integration, and prefabrication helped simplify complexity, reduce risk, and keep the project moving forward.
At Sterling Structural, we believe successful mass timber projects require more than supplying panels. They require a partner who understands how to turn ambitious designs into buildable, repeatable solutions.
Learn more about Sterling Structural and our mass timber solutions.
AI Generated·May contain errors
Video Summary
AI Generated
Justin Colzeal, CEO of Aerosystems, discusses the company's mission to combat the global housing crisis through sustainable, modular construction. By utilizing Cross-Laminated Timber (CLT) and a hybrid prefabrication approach, Aerosystems reduces construction time and labor costs while significantly improving energy efficiency compared to traditional building methods.
My name is Justin Colzeal. I'm the founder and CEO of Aerosystems.
Our mission is to rapidly deploy sustainable housing around the globe.
There's an affordability crisis, but there's also a crisis of just housing quality.
Our whole thesis as a business is to use modular construction to speed up construction time
and to reduce construction costs. Costs need to really be thought of holistically,
so it's not just material costs, but you also have labor costs to take into account as well.
So mass timber, while it might be more expensive than, say, the materials to frame out a wall,
enables us to build the home using much fewer labor hours, much fewer man hours,
and also reduce the amount of trade labor on site.
So when we were starting our business, we were looking for a long-term partner.
As a CLT supplier, we talked to quite a few companies in the industry,
and Sterling really stood out because they were willing to partner with us at the very front end.
So they were willing to provide kind of the engineering experience and the expertise so
that we could properly value engineer all of our projects and get the most out of their CLT panels.
And then also their pricing structure, their lead times, and their operational
excellence was something that really stood out after we started working with them.
You have to be very, very efficient because any cutoffs you have or any waste that you have is
just mass that's not being used, and that's money out the door. You lose all the efficiencies of
prefabrication if you're having to make modifications or if you're having to customize
stuff down the supply chain. So it's really important for us to kind of design everything
up front, have a really well-coordinated BIM model, which is a Building Information Modeling
Systems model that has every single trade. It has all of the mechanical, electrical, plumbing,
all the structural coordination is done ahead of time so that we can get the most out of
Sterling's capabilities when they're pre-routing the panels, and we can get the most out of the
panels themselves. So compared to a traditional construction project, we prefabricate, I would
say, about 75% of the home in our facility. So we have kind of a hybrid approach of volumetric and
panelized. That allows us to do a lot of the complicated work in the factory, but we don't
have to deal with the logistical hassle of shipping huge parts of homes long distances.
The general installation process took about eight days from when we first received CLT on-site,
from when we first received our prefabricated assemblies to when we got the house completely
dried in, which means that it's watertight. We say that sustainability means, one, energy
efficiency. So our homes use about a quarter of the energy that a typical home would use
to heat and cool the home. While the material cost might be 30 to 40 percent more than a
traditional home, the overall cost of the house can actually be about the same or even less
than a traditionally built house. And then also, because you're building homes that are
repeatable designs, the design gets better and better and better each and every time you build
it, and the cost goes down each and every time you build it. So we really need a collaborative
partner who is willing to be creative and willing to kind of try out new things and experiment a
little bit, but also provide that expertise and knowledge to give us feedback when we have some
new ideas. So we use Sterling as our exclusive supplier of cross-laminated timber, and I usually
point most companies, especially ones that are just starting out and need to really learn about
CLT and need a partner who is willing to grow with them, I point them Sterling's way.