Setting up the Biggest Factory in Central London Since WW2

World Cultural History
11 followers
6 Video Views·Sep 28, 2026
London is witnessing a large-scale factory project—a rarity since World War II—located in the city center. The project is expected to create jobs, boost manufacturing, drive technological innovation, and repurpose urban land, while also helping to reshape the capital's industrial landscape.
AI Generated·May contain errors
Video Summary
AI GeneratedA software engineer turned project manager oversees the challenging installation of heavy machinery at a new factory in Southwark. The process involves navigating strict London traffic regulations for abnormal loads and precision maneuvering of a DN Solutions SMX 2600S lathe through a tight space of structural columns.
So this is the new factory, this is Southwark. As you can see it's pretty bare bones right now,
no machines is the big thing. So here today for the first time, literally this is about
three hours ago this work was completed, this new gap is wide enough to actually fit the machines
through and this has been something that's sort of keeping me up at night to be honest because
we've got new machines coming on Monday and this was finished just a few hours ago
and for the reference it's Tuesday before the Monday at the moment, so we've got about six
days to go. It's not Tuesday is it, it's Wednesday today. Yeah it's Wednesday, oh crikey.
I was actually hired as a software engineer back in October and then through a variety of
happy accidents I ended up managing a fit-out project in a four-story building. I really did
not expect that to happen but I absolutely love it, it's really good fun but yeah it just sort
of goes to show you never really know what life's going to throw at you. So an abnormal load is
anything above a certain height, width, weight or weight per axle which is then split into different
weights for driving there's an odd driving axle. Some of our machines are over 2.9 meters wide
which necessarily means that the vehicle will be over 2.9 meters wide so it's definitely an
abnormal load. Different constabularies then set different rules as to when you can travel but the
one that really hits us is that between 6 a.m and 8 p.m Monday to Friday and I think it's like 10 a.m
to 8 p.m on a Saturday and a Sunday you cannot have any abnormal loads within three miles of
Charing Cross station, that being a measure of how close you are to central London and we are
2.3 miles from Charing Cross station so as a result I suspect everything's going to have to
come before six. There are at least four machines out of seven which are very likely to hit that
limit so that'd be some early mornings probably. I also suspect that Southern Council probably
won't like the fact that we're bringing these things in at crazy hours in the morning in a
residential area, it's just a challenge. Interesting. We like to challenge so you know
you've done enough thinking I think about where it's all going. I actually am slightly more
stressed in a way because if we get this wrong then it will cause a problem for all of the ones
downstream right so you're right that there's nothing no other machines to manoeuvre around
but when we come to number seven this will be the thing which is the thing to manoeuvre around
and so actually if we get this wrong now it's going to hurt us later.
So we are looking at the DN Solutions SMX 2600S. So it's up there so this is the sub spindle and
this is the main spindle. Main spindle's kind of hidden away at the moment but the chuck is the
thing that has three drawers poking on it and that's the thing that like grabs the workpiece
and spins the workpiece around so that is effectively the lathe portion of this machine
and the good thing about it having a main and a sub spindle is you can machine sort of five
sides of a part if you think of like a dice you can machine five sides it'll come over grab it
and then it'll finish the sixth side and then this bit here actually is like a catchment box so
inside the machine is a conveyor it will literally grab the finished part and it'll come out here
so with machines like this you can run 24-7 effectively. Are you going to be
manoeuvring around all these pillars? Try not to knock one out.
When it gets to this size of a forklift it's the drama and the consequence of getting it wrong
so they have enough power and momentum that you know if they were to catch one of these
columns like the building will come down. It's off the truck now and now comes the
at least in my opinion trickier bit to actually manoeuvre it around everything
and get it onto the floor. I have to be honest with you this is the thing that's been
keeping me awake for the last four weeks and yeah here we go I think we're about 10 seconds
away from the machine actually crossing the boundary. Very little gap this side. It's through
the gap the next challenge is getting it through this maze of columns and plonked right next to
this column over here just has to make sure he gets the right s-shape as he goes round.
He managed to get that within one centimetre which on a forklift like that is quite impressive.
That looks about right yeah I mean assuming that the engineer's happy with that I think
we're happy with that. The machine is in the building and we think it's in the right place
we think it's straight. To be honest though if it's in the wrong place we can always move the
pillar can't we? Sure. It's starting to feel like a real factory now it's got a long way to go I
think it feel it'll feel a lot better when you see this powered on so the machines at the moment
they're just metal boxes but when the power goes on and the lights turn on they do come to life
it's like they sort of you know been reborn almost it's a
at that moment it feels like it's a proper factory.