In this video, we are reviewing the biggest Fassi loader crane ever, the Fassi F2350RL.2.8 HXP Techno, a machine that is set to revolutionize the construction and manufacturing industries with its precision lifting capabilities.
This version is the first Fassi in the world to feature the double flyjib!
We will be talking about the unique features on the build and crane, the engineering thought that went behind them, give it a quick load test and show you how to mount the second flyjib!
As part of our ongoing series on crane technology and logistics, we visited the Netherlands, a hub for heavy machinery and crane solutions in Europe, to get a closer look at this impressive machine over at Kluytmans facilities.
The Fassi F2350 HXP Techno is a game-changer for companies like Volvo and other major players in the industry, offering unparalleled power and precision. This crane stands in competition with top models of other crane brands, such as the Palfinger PK 200 002 SH, and the Effer 2055 and Effer 2255.
Whether you're a fan of Euro Truck Simulator 2 or a real-life trucker like Trucker Tim, you won't want to miss this in-depth review of the Fassi F2350 HXP Techno. From Bauma to the streets of Netherlands, this crane is making waves in the world of craneformers and beyond. With its advanced techno features and massive lifting capacity, it's no wonder this machine is going viral among fans of heavy machinery and construction equipment.
This is the biggest and most powerful Fassie loader crane ever built.
Earlier this month the new F-2350 HXP Techno received its European premiere at Kleismans
premises over in Netherlands where Fassie dealers from across Europe have gathered
to witness the queen in person. This particular crane model is the world's first to feature the
double fly jeep configuration built specifically for the tight streets of Amsterdam. In this video
we'll take a closer look at the build itself, perform a little load test and show you how the
second fly jeep is mounted. So let's get into it. Here we've got standard Kleismans double front
leg solution which is capable of holding about 16 tons of pressure between two of the legs.
In between we've got the radar for transport regulations nested in between two legs and
above it behind the cover we've got the towing hitch for all those situations when the crane
gets stuck and it needs to be pulled out in emergency. We've also learned that because of
the sheer size of this crane Kleismans has applied a reinforcement around the front legs to withhold
a greater pressure but we won't know until the crane undergoes final testing so as soon as we
know that we'll let you know. As you have noticed by now this Volvo cab is not the standard FH cab.
Holster transport have opted for the FM version which is quite a bit lower and why is it lower?
Let's find out. Right we've got only two steps to get inside and that's why the customer have opted
because it's less hassle to actually walk. No I'm joking. Actually the visibility is much much
greater and it's safer for the area such as Amsterdam which this vehicle has been designed
to operate in so you are in control of the environment and you're lesser risk for the
pedestrians and cyclists. While we're on the topic of Amsterdam let's talk about a 10 meter rule
which originally started in Amsterdam and it's been rolled out into different cities because of
the urban compacted areas, tight streets, a lot of pedestrians and cyclists around. Kleismans has
managed to condense the sheer size of the F2350 into under 10 meters. This currently magnificent
build stands at 9.99 meters. They've utilized a second function because the design of the crane
allows for these two legs to be extended by another meter or two so Kleismans came up with
the idea while the overall length of the vehicle is 10 meters the legal limit outside of the cities
is 12 meters so they said why not create additional loading deck. When you extend these
extendable legs along with the crash bar which has to be extended for road legality
you can put a demountable platform and make it turn into the loading deck for any small footprint
loads such as glass tillages, some kind of switch gear. The loads that not necessarily need to be
transported for the greater distances but sometimes you know like a few hundred meters
or maybe two kilometers it's sufficient so 10 meters inside Amsterdam and 10 meters inside
big cities and you can turn this vehicle into 12 meters and have additional loading space. Also
this vehicle like we mentioned is a double fly jib. Currently the this fly jib is not mounted
but they've come up with the place of the resting point this space here top of the of the legs
is a designated place for the basket and for resting point for the second fly jib. The basket
cannot be mounted to the second fly jib it can only be mounted to the first fly jib so you've
got one or the other you can't have both which makes sense but there is a workaround even if
you have the second fly jib attached and resting in the place where normally the basket would live
as long as you're not in Amsterdam or in a big city you can extend these legs and put a basket
on top of the temporary loading platform. Speaking of rear legs Kleitmans has come up with a
customization and workaround to keep the vehicle within the 10 meter rule for Amsterdam purposes.
Normally FASI legs they come up with the fixed downward position but to keep the vehicle under
that 10 meter rule Kleitmans has turned these legs into the tiltable legs to keep it short
and it works like a gem. This magnificent build is absolutely a jack of all trades. A second ago
we covered the rear legs compartment which can be turned into the extra loading capacity space
and here we've got additional space nested next to the crane arm for two big aluminium pads
whenever then there is a need for greater load distribution due to soft ground. Also this build
features heaps and heaps of storage solutions four on this side four on the top and nine
toolboxes on this side bringing the total of 17 toolboxes on this build and here is the fun fact
and you can see between the second and third axle there was a place that the tank diesel tank used
to live and now has been removed to accommodate additional two drawers and the diesel tank
if you ask me where it is now it's placed over here next to the hydraulic tank right on top of
the front stabilizer leg covered behind this laser cut patterned shield and now let's admire
all the details on this beautiful build. AdBlue tank covered by this shield and the batteries
nested in this toolbox. One of the two sets of ladders to provide access to the diesel tank.
LED lights nicely nested within the bodywork one of four on each side. Flipping ramp for rolling
circular stabilizer pads with the FASI logo engraved on them. Quality stainless steel toolboxes
with plenty of organizational options. Integration of beautiful 3D rear lights and the rubber neck
light all 3D. Holster logo engraved on the side of the big pad. All welds on the FASI crane columns
which are welded by the robots are tested by the humans with the ultrasound tests to detect any
inefficiencies and any inaccuracies. The bodywork color is perfectly matching the crane color. FASI
tests their crane for a minimal duration of thousand hours with spectrophotometers for a
variety of tests such as salty spray or UV tests to ensure uniformity and consistency of the color
especially for those proud operators who love to wash their machines quite often. Here is the
unique feature of this FASI F2350 crane not only this inner boom is actually one meter longer than
its predecessor F2150RL but also like its predecessor on the back of the crane column
you can mount hydraulically extra ballast for increased stability with the choice of three
and four tons. As you already know this FASI F2350 is the largest and the strongest FASI crane
in the TECNO range which is the latest technology advancements of the company so that means that
this crane has all the updates that the TECNO range brings such as ACF, IWC, Internet of Cranes,
X-Design boom. We have already covered some of the features of the TECNO range and if you want
learn more you can check this video somewhere in the corner and you can find out more. Now let's
take a look at the event itself and bring a little bit of taste of the atmosphere. Nearly 100 dealers
and industry professionals have gathered to KLAGMANN's facilities to have a crane and an
engineering talk. And keep watching till the end because we're gonna put the F2150 to the test.
So last week we've been participants of the European
premiere of the strongest FASI ever produced up to date but now behind me the F2350 is
being set up by Jelle, one of the KLAGMANN's salespeople. So kindly thank you to Jelle who
stayed longer for us especially so we could extend the crane fully and admire its length
but also verify the statements put on the load chart. But first let's talk a little bit more
about the crane and more specifically about the fly jibs. Two fly jibs. This fly jib is L958 version.
The eight stands for eight hydraulic extensions on the fly jib giving the total outreach of
around 20 meters. The maximum capacity of this fly jib is 10 tons when it's fully retracted position.
The maximum outreach of the fly jib when it's fully extended along with the main boom of the crane
is 340 kilograms at 47.3 meters and if you take the whole crane up to its most vertical position
it will reach the point of 51 meters and will still lift 700 kilograms. And as we know techno
range stands also for x-design boom which is the 10-sided decagonal section of the boom
and for the first time in the range they also extended this technology into the fly jib giving
the greater performance especially in the vertical lifting configurations as well as a greater
torsional resistance. If anybody wanted to ask what's the weight of the fly jib on its own
the dry weight of the fly jib is 2300 kilograms without myself sitting on. Normally you choose
the crane with a specific job in mind that's why F2350 comes with variety of choices for the fly
jibs. For example in this instance this one is the L958 which means like we mentioned before eight
it has eight extensions but you can also spec it with six extensions and seven extensions fly jib.
This one was specifically built for the second fly jib in mind to increase the full capacity
and possibilities beyond 50 meters reach and still able to place with great precision loads
such as glass or any objects that require ultra care at greater distances. Also there's
existing another option with the 10 extensions on the main crane and you can pair it up with the
smaller capacity of fly jib L626 which gives you slightly better duties at the closer range. Now
let's talk about the second fly jib which is the L153 the equivalent of around six ton meter in
lifting momentum. This fly jib weighs 480 kilograms and it has three extensions. Theoretically the
L153 can be mounted on the smaller cranes of the size of 30 or 40 ton meter as long as you have a
different adapter so in theory you could share this type of equipment between two or three
different cranes. So we're attaching the 1.34 tons test weight onto the first fly jib and we're about
to perform a little test to verify the accuracy of the crane against the duty chart. So we are
expected to lift it horizontally nearly 30 meters so let's find out.
29, 30 so yes the crane pushed 1340 kilograms at distance of 30 meters horizontally but this
crane is not the point of lifting the horizontally. This crane has been designed to lift above 40
degree angle so it's specifically optimized for high reach over 30 meters, over 40 meters, over
50 meters and for example with this fly jib configuration basically in its most optimum
angle for outreach you can set the fly jib at 45 degrees and send the fly jib fully with the weight
of 1000 kilograms reaching 40 meters outreach. Thanks to the JDP-X which automatically calculates
the performance of the fly jib based on the extensions on the main crane boom. Now this is
the first time for me to put the double fly jib on the queen. Obviously first of all we need to
detach the hook so it doesn't dangle about. First of all we're not in the super optimal position to
mount the fly jib so first thing you need to do you have to make sure that the fly jib
is actually in line with the boom so sometimes you have to shift it to make sure that the entry is
directly with the last extension of the boom. The second angle you need to adjust, this angle
you need to match this angle with the angle of the boom of the crane. In this instance
it's a fly jib and when you get it closer you need to make sure that the alignment the top and
bottom is pretty correct. So this is a bit of the guesswork but we'll do our best
to try to fit it. It's about right, it's going. I have to just detach this pin because that's
your locking pin. Get the wire rings and quick connector on the right side so it doesn't get
jammed or damaged. As you've got the sleeve into the last extension of the fly jib you've got all
the alignment it's sliding right to the bottom so next step you have to take it slowly and gently
so the hole are aligned holes are on the outer sleeve are aligned with the sleeve inside it.
I would think it's through let's check it yeah we've got it through a bit small space but you
have to make sure that the nut is on so it so the pin doesn't come out that's in make sure you've
got the safety pin to lock it stop it from coming out and then you've got a quick connector.
This is a godsend in the past you had to connect every each hose with electrics and everything
that's aligned yeah but electrics on the right bottom side which is the lining there that's it
it's all locked this is a good thing and always make sure it's always with you because otherwise
we'll just damage the end of the connectors get it dirty get it dusty and all the seals are just
knackered. Let's start the remote control again to reset the crane in order for the fly jib
small fly jib to be seen by the crane computer now let's see if we connect it correctly let's press
a few buttons in order to make the crane move yeah it's moving it's a success and that's how
you mount the second fly jib the L153 on the F2350 strongest FASI ever produced crane the
full vertical reach of this crane is over 58 meters to lift it horizontally you can still
lift 150 kilograms at around 50.6 meters however the x-design boom has been optimized to lift
everything above 40 degree angle that's where you utilize and harness all the power this crane can
give you. As you have probably noticed by now there's no fire going behind me it's absolutely
roasting today here in Britain it's got to be the hottest day of June by now so far and on this note
we're ending this video I hope you enjoyed it I would like to say a massive thank you to FASI
and Kleikman's team for giving us the opportunity to film the queen and as usual thanks for watching
and see you in the next video and don't forget keep on lifting