See how the F-35B executes a vertical landing using its unique lift fan system. This overview explains the engineering behind the jet's operational flexibility.
This video examines the F-35B variant, focusing on its specialized airframe modifications. You will see the redesigned mid-section that allows the F-35B lift fan to operate, enabling the aircraft to land vertically in confined spaces. We cover the specific mechanical requirements needed to keep this stealth fighter mission-ready, whether on a land-based desert runway or the deck of an aircraft carrier.
AI Generated·May contain errors
Video Summary
AI Generated
The F-35 program attempted to create a single stealth fighter for the Air Force, Navy, and Marines. However, the requirement for the Marine Corps' F-35B to perform short take-offs and vertical landings (STOVL) created immense engineering challenges. This \"commonality\" forced design compromises on all variants, leading to massive cost overruns, weight issues, and software delays.
The F-35 was supposed to be a single stealth fighter for the Air Force, Navy, and Marines,
but the Marines needed a version that could take off from short decks and land vertically.
That requirement led to the F-35B. To make vertical landing possible, engineers had to
add a lift fan and redesign the middle of the aircraft, and this is where the program's original
sin was committed. The core premise was that the needs of an Air Force pilot, a Navy pilot,
and a Marine pilot were similar enough to be met with one platform. They were not.
An Air Force F-35A needs to be agile for long-range missions from big, established airfields.
A Navy F-35C needs a brawny structure to survive the brutal physics of carrier ops.
And a Marine F-35B needs to operate from tiny, amphibious assault ships,
which means it has to land without a runway. By trying to be everything to everyone,
the Joint Strike Fighter Program created a situation where the most difficult requirement
for any single variant would inevitably dictate the design for all of them. The program chained
the fates of the Air Force and Navy to the incredible technical gamble the Marines were
taking, and that gamble was the F-35B's vertical landing capability. Making a fighter jet land
vertically isn't a new idea. The British did it with the Harrier jump jet decades earlier,
but the Harrier was a relatively simple machine from a different era,
and while some later versions could just break the sound barrier in a dive,
it was fundamentally a subsonic aircraft in combat. The F-35B was supposed to be a supersonic,
fifth-generation stealth fighter packed with more computers than any aircraft in history,
and it had to hover. The engineering challenge was monumental. It's a mechanical nightmare,
a symphony of moving parts, clutches, and actuators, all run by millions of lines of
software code. It has to work perfectly, every single time. From the beginning,
officials knew this was the highest risk part of the whole program. Early Pentagon reports
called the Estovil design the highest risk of all variants, and the most difficult to get right.
But the Marines were adamant. Being able to operate from anywhere, independent of long,
vulnerable runways, was central to how they fight. They needed the F-35B, and because of how the
program was structured, that meant everyone was getting a plane whose design was shaped by it.
The first domino to fall was the F-35's very shape. The F-35B needed a massive hole in its
airframe for that lift fan. This forced the fuselage to be wider and bulkier than it otherwise
needed to be, and because of commonality, this wider, fatter fuselage was passed on to the
Air Force's F-35A and the Navy's F-35C, even though they didn't have a lift fan. This might
seem like a small compromise, but it had major consequences. A wider fuselage means more drag,
which can hurt speed and fuel efficiency. It also meant the internal weapons bays of the A
and C models were smaller than they could have been. But the bigger problem was weight. All that
stovel machinery, the lift fan, the clutch, the driveshaft, the swiveling nozzle, was incredibly
heavy. Adding thousands of pounds of gear to a stealth fighter, an aircraft that's supposed to
be as light and sleek as possible, is a recipe for disaster. As development went on, the F-35B's
weight began to balloon. It got so heavy that it threatened its own core mission, landing vertically
with enough fuel and weapons to be useful. If you can't land with your unspent bombs or enough gas
to get home, your multi-million dollar fighter is just a very expensive one-way trip. The situation
got so bad that in 2004, the F-35B was put on probation by the Pentagon. Then-Secretary of
Defense Robert Gates publicly warned that the stovel variant was in deep trouble, with testing
problems that might need major redesigns, adding yet more weight and more cost to a jet with no
room to give. The crisis kicked off a frantic program-wide redesign. Lockheed Martin engineers
went on an aggressive weight loss campaign, scouring every inch of the jet for ounces to
They thinned the airframe's skin, redesigned structural parts, and rerouted wiring.
In the end, they managed to slash more than 2,700 pounds from the F-35B's design.
The F-35 story is a fascinating case study, and a journey we cover regularly on this channel,
so if you're interested in the complex world of military technology and the stories behind
the hardware, consider subscribing and hitting that notification bell. We'd love to have you
part of the conversation. It was an incredible engineering feat, but it came at a staggering
cost. The redesigns took years and burned through billions, and since all three variants shared a
common design, fixes for the B model rippled outwards, forcing expensive adjustments and
delays for the A and C models too. The promise of a cheap, common family of jets was unraveling.
The program was now in constant crisis mode, just throwing money and people at problems that
all traced back to the Stovall design. If the hardware was a nightmare, the software was a
waking terror. The F-35 is basically a flying computer. Its original software had about 8
million lines of code, a number that has only grown. This software controls everything, the
advanced sensors, electronic warfare, communications, weapons, and flight controls. And for the F-35B,
it also had to manage the impossibly delicate ballet of the Stovall propulsion system.
The transition from forward flight to a stable hover is a moment of extreme stress,
and it's all handled by software. The sheer complexity of this unique system was a major
factor in the now infamous delays of the F-35's computer upgrades, particularly Technology
Refresh 3, or TR-3. TR-3 is a critical modernization of the jet's core processing
power, the foundation for all future capabilities, known as Block 4. These upgrades are supposed to
let the F-35 carry new weapons and improve its sensors and electronic warfare. But the program
has been bogged down for years by hardware and software problems. TR-3 hardware and software
issues were the main reason for late aircraft deliveries in 2024. The Pentagon even had to
stop accepting new F-35s for a while because the TR-3 software wasn't ready. The consequences have
been severe. The cost for Block 4 has jumped by over 6 billion dollars, and the schedule has
slipped by several years. This brings us to the ultimate consequence, cost. The F-35 program is
now projected to cost over 2 trillion dollars to purchase, operate, and sustain over its nearly 80
year lifespan. Sustainment costs alone, the price of just keeping the jets flying, have soared to an
estimated 1.58 trillion dollars. That's a 44% jump from the 2018 estimate. The cost to operate a
Air Force F-35A is now around 6.6 million dollars a year, way over the original target of 4.1 million
dollars. These crippling costs are a direct result of the program's complexity. Production delays
have become chronic, with contractors delivering aircraft and engines hundreds of days late while
still, in some cases, receiving incentive fees. In 2024, for example, all 110 aircraft delivered
were late by an average of 238 days. Now, it's not fair to say the F-35B was a complete failure
that only caused problems. For the Marine Corps and allies like the UK and Italy, that STOVL
capability isn't a bug. It's a revolutionary feature. The F-35B is the world's first and only
operational supersonic stealth fighter with this ability. It gives them a level of flexibility
that is simply unmatched. An F-35B can take off from a small amphibious ship, a damaged airfield,
or even a reinforced road, bringing fifth-gen firepower to places high-performance jets could
never go before. That's a real strategic advantage. And despite all its problems, the F-35 program was
never cancelled. Today, with nearly 1,300 jets delivered to forces around the world,
the F-35 is the backbone of NATO and allied air power. The pilots who fly it are almost universal
in their praise of its one truly game-changing feature, its sensor fusion and situational
awareness. The F-35's network of sensors gives its pilot a god's-eye view of the battlefield,
letting them see and track threats long before they are ever detected themselves.
In exercises, it has demonstrated a stunning level of lethality against older aircraft.
The program did, eventually, deliver a formidable weapon. Supporters argue that the painful
development, the delays, and the cost overruns were the necessary price for a generational leap
in capability. They argue that the B variant, for all its trouble, didn't cripple the program,
but merely exposed how hard it is to build something so far ahead of its time.
That was me, the Mori Report. Now I want to hear from you. Do you agree with my analysis,
or am I completely off on this one? Drop your thoughts in the comments. See you on the next one.