Inside the World's Largest Glider Factory - Jonker Sailplanes

Aviation Technology
2 followers
25 Video Views·Jun 16, 2026
Jonker Sailplanes has opened a brand-new manufacturing facility in Potchefstroom, South Africa — around 10,000 m² of modern production space, and quite possibly the largest sailplane factory in the world. I got the full tour with Uys Jonker to see how the JS3 and the rest of the fleet are built, from the moulds to the final assembly. Here's a look inside.
AI Generated·May contain errors
This is the brand new Yonker Sailplanes factory, 10 000 square meters and quite possibly the largest
sailplane production site in the world. I got the full tour with CEO Ace Yonker, but a few years
back I actually got to fly one very special J3 in South Africa. Hi Ace. Stefan, welcome to South
Africa to our new facilities here and thanks for the effort coming all the way out here. It is
really huge here. I just saw the old facility at the airfield and this year looks completely
different, like a dream facility. Yes, it was never our dream to have a huge facility. Our dream was
always to make dream gliders and slowly as we were for 25 years on the airfield where we've been,
we slowly expanded the facilities and finally with this organic grow things wasn't in a nice
flow and we couldn't obtain more property at the airfield and at one stage we had to expand,
we had no more space for the aircraft and we start looking around for facilities in town
just to expand and we even approached this facility here just to move our final spray
areas and final assembly maybe here and then the owner often said why don't you take the
whole facility. They were thinking of stopping their business which was a furniture distribution
business and that's where it started. So that's not the new build here, it's something which
already exists and you renovate a bit or? Almost in between. Most of the area was here like
I think 75 percent of the building was here. It was about 6 000 square meters of facilities
and we could not fit in the flow inside the existing buildings so we had to expand the
sections where we do the processes that needs temperature control and dust control
and to create an internal flow but also a complete external flow for the final product.
So therefore we had to expand by about 4 000 square meters, we had to expand the facilities.
Now it's about 10. It looks a bit big but I think it's okay. It is just huge. Let's start over there
and let's make a normal production of a glider just to see all the different facilities and
let's head over there. Please enter, I think we're not allowed to enter. Let's try. Let's see what
goodies we find here. I think there's like a toy shop, you can find all parts that you would
like for your glider. Avionics, it's great here. Avionic parts, wires, I see there's gas strut,
there's a whole bunch of things. If you look through this, this is mainly I think the off-the-shelf
parts that we find here but it's actually phenomenal how many parts goes into a glider.
If you look every single of this part has a specific application inside the aircraft. So
these parts are now which we CNC the foam parts that are installed as a core material.
So we have a section and we'll see later in the distribution area how the foams are machined
specific to size to ensure repeatability on the product. You will see now a bit more of the parts
that we construct ourselves coming from the part manufacturing shop. So these are typically
off-the-site panels that go into the aircraft itself in the cockpit which is small cosmetic
related parts as covers. The metal parts produced from the metal shop for example,
this is a bell crank coming inside the wing transferring the push rod actions into the final
rod pushing down here. All of these parts are pre-manufactured in our metal shop area
and then kitted like this with all the bolts connected to simplify installation at a later
stage. These are the larger parts and this is mainly to protect the pilot. So these are the
shells, the double shell inside the cockpit transferring the loads especially in a crash.
You can see it is quite a supply line as you move around here with all the pipes and chutes.
Even these tubes are produced by our sister company On Tech Technology so they produce all
the carbon tubes for us. Inside the supply shop as you can see bolts and nuts, hundreds of thousands
of them, all the different type of bolts that we want to use. Part of the store supply is also,
morning guys, so also inside the supply is where we manufacture the instrument panels, complete
panels. So the panels are produced as a complete unit here. All the instruments are installed,
wiring done and it is just plucking clay into the cockpit. So once we come to the aircraft
there's very little wiring to be done, it's just some plugs that need to be plucked. And in this
area is where we do all the electronic work, the buck wipers, instrument panels and some electric
parts where required. So this is the second store, the second part of the store where you see the
incoming inspection is done and then distributed into the facility. And this side is more
the consumables of the factory, the cleaning materials, stuff that is normally not flying.
Here you can see this is where we lay out all the looms running inside the factory. So we have
these loom benches to ensure that all the breakouts of the lids are jacked at the correct space.
And then when the loom is installed we have a consistent installation of the looms, just to
reduce also time and mistakes on the floor. Pre-manufacturing looms is just one of the
better ways to go. How many days does it take to produce such a wiring loom? That you have to tell,
two days. Two days, okay. Two days of work for this loom. So now we will take you all the way to the
supply stages. So here's our two composite shops, our CNC shop and our metal shop. So we start here
metal shop side. It's so huge. Now we're entering our metal shop. So almost all metal parts that we
produce except for the highly specialized CNC parts, which is produced on the other side by
our sister company, all the other parts are produced here. So the store supply is sitting
on the section over there. All the raw material. Wow. And one can imagine it's a huge number of
pipes used throughout the aircraft. Most of these are 4130 steel. It's the aircraft
carbon steel, strong steel. And then you also have the aluminum rods and some stainless steel,
some place where we can use stainless steel. If you come down here, we have some traditional
hand milling machines because there's a lot of operation. You just do, have to do accurate
drilling or cleaning of some of the parts which cannot be, which needs to be in a process completed
coming off the CNC machine. So a number of these machines in operation.
You said you have more CNC machines at a different workshop or at the airfield? Yes. Yeah. There we
have a huge bank of CNC machines, CNC machines as well as high-tech milling machines. So this
is a typical example of a CNC machine down here. Morning Christo. Which part are you making this
morning? This seems to be the canopy rear canopy pin core, which looks like this is now halfway
through the process. You see that part still needs to be machined in here. Okay. So busy with
the setup of the part and once the setup is completed, we'll push out hopefully a year's
stock. So normally when we start up the machine and we set it up, we produce for a whole year.
We only have to do the same program once a year. Yeah. Thanks Christo. A lot of hand work is also
required in a metal shop. If you look in this section here, which is a bit more noisy, that's
where we isolated it, where parts are produced using hand methods. Typically some of the parts
are being reworked or reamed or assembled here with some of the specific bearings. I can see
here some assembly that's happening on a metal part that's externally produced by some of the
other areas. Okay. So this is our welding shop. Andries, nice to meet you. So our aircraft welding shop in
this area where all metal parts are being welded has been welded this morning. So if you can have
a look here, so these quite complex welding parts, I think this is some balkan autocoupler
at the wings that you might see in further processes. We'll get the bearings in there.
Here you have the roll part that we assemble in a jig when everything is tacked together and welded
as far as possible inside the jig. And then you move from the jig and then you will basically do
the bottom part. Yeah. Awesome. So this part of water jet cut, we'll show you now the water jet
cut machine is just around the corner here. We also have some good thunderstorm outside there. Yeah,
no flying weather today. Or very exciting flying because there's a water jet cut in operation.
So it's quite a bit noisy, but you see all the parts, the metal parts being manufactured by CNC.
So wherever we can, we try to use accurate CNC machine operations because of repeatability and
also cost savings. Which brings us into the normal CNC shop. The normal CNC shop consists
out of cutting raw material, but also machining parts for assembly. In this section, raw material
is being cut. If you can see now all of these material parts are being cut to the correct shape
and then it is packed for the layup sections to use the material really pre-cut into the correct
shape. Now you saw previously all these foam sections and metal plates. These are all the stock
of glass plates. You see all different sizes which is required in different areas. If you
look at this plate, it's quite a hefty like a 10 millimeter glass plate. But you also do that
in-house or you buy these raw? These are produced by our sister company at the airfield. Okay.
And they use the infusion process too because it's just bearing material. Yeah. So they use
infusion process in delivering our glass plates for us. So we don't buy any glass plates in with
other words. And you can typically see, this is typically a part that's machined out from a huge
thick plate of glass which is a structural member which needs to be installed probably somewhere
near the main bolts of the, if I look at it, it's a strong part. It must serve some function.
It's really heavy, yeah? Yeah. Cool. And that's done on this big machine here? This is one of our
CNC machines. We have three, two machines of this caliber, one of five axes also at the airfield.
But at this moment it's busy machining JS4 wing moulds. So it's not available for production.
Yeah. So you can see now the machine has been set up with a plate and then the different parts are
machined from this raw material. And then obviously you just have your standard machines where
sometimes you just have to cut the parts loose. But as you can see they're cutting templates and then
there's a bit of hand machining required just to cut the parts loose. So this section is what we
call the, of the composite shops, it's called the large composites. Large composites consist out of
tail planes, rudders, spar caps. So the slightly larger components that doesn't fit into the main
line but which we see as a part that's supplied. So all the parts here first goes into the,
all the parts here go into the shop, into the stores and from the stores it's then kitted and
distributed into the line. These are wing spars probably or? Yeah so if we look down this line I
have a suspicion this could be, this could be JS3 moulds if I look at this. And the spar caps
have just been produced. Yesterday produced, already been cured. And you can see the number
of layers are marked down here. You see I think up to that point it's 64 layers of that tape.
And 64 times 32 lines times 12 000. So it's a huge number of carbon fibres at least. And it's all
manual laying down and? Yes, here is the process how we do the manual laying down. You can see down
here we already have the JS4 spar caps being manufactured. So these are the first prototype
spar caps of the JS4 in process. Typically here you see what the machine looks like with
32 rolls of carbon is going through a tree and then through a resin process. Okay if we move
over here to the to the large component, typically a rudder installed with an antenna here. And if
you look on this side we're producing a tailplane here. And I think we're different from the other
manufacturers that we have the pyrostatics inside the tailplane. At this moment they're putting
them in the bonding glue which is a combination of cotton flocks and aerosol to the correct mixture
for the bonding process. And once it's closed it comes out of the mould and it looks like the
tailplane just on the other side down there. This is the top skin which will be bonded onto that
thing in a few moments time. You can already see the cranes are ready to lift it up and do the
closing process in a few minutes. The small composite area has its own curing oven. So here
we have the internal curing oven. I don't want to open the door now but if you look through the
windows you can maybe see some parts that we post cure independently before it goes to the
curing process. So we're curing parts before we install them in the aircraft so that they're
ready settled and that the post curing process is to a more advanced stage before you do final
post curing. The small composite shop also has its own spray booth and inside there you'll find
most of the small composite being manufactured that you saw on the other side. But as you can
see we created sufficient space for the small composites to enable production of a very high
standard and quality. So much space it's crazy. Yeah so that brings us now to the to the next
stage. Okay now we enter the line where the product is actually produced. So normally all
the spare parts are coming and flowing to kits into this area and this line operates here. I
thought the other hangers were already big but that's huge really huge here. We are a bit nervous
because if the JS5 melt has not arrived here they still at the R&D site and the the JS4
melt coming in here so this line will be fairly under pressure. So we'll have to have place to
store the melts as well. Okay. So maybe we start on this side if you can if you have a look in the
melt here. So this is the assembly line of the melt. You can also see wings in an advanced stage
of the skins being produced. So this there will be spaces for each aircraft on a specific line
where the construction is happening. Once the construction is completed the melt will be
cleaned and go into the spray booth area. So it starts in the spray booth area on this side around
here and then it goes into the clean room. So maybe we just walk through it. Yeah. So this is a spray
booth. The spray room. Whoa please enter. So pardon the noise the vacuum is on. So this is a JS3
inside the melt and the jacket has been sprayed in the melt. It moves into this and then it moves
into the wet layup room. So it rotates now and moves into the room. But as you can see we have
a huge spray room here enabling a very good operation of protecting the people from any
overfumes. So then we enter obviously the the wet layup area. So this is our clean room.
As you can see we try to keep it clean. The spray melts with the jacket enters here
and then the wet layer process happens. You can see all the all the drawings of the different
products are on the wall here. According and they produce obviously according to the plan
the raw materials down here. Now quite interesting what you see happening here is we're currently
building a DG1000T fuselage here at this moment. As we're also producing the DG1000 fuselages
with our combined company JSDG production. So yes a DG1000 fuselage in the in birth process.
So once the layup has been completed at the end of the day it goes through these doors
into the curing oven. So that's the overnight curing. It's a low temperature curing process
just to excel the curing of the material so that the manufacturing can proceed the next day.
So this is a huge oven. As you can see this the idea of the oven is that the molds are
parked in here but even if you do overnight curing and you join a mold that you can also
have in process into the mold. So it serves the wet layup but it also serves the assembly line
for overnight curing processes. All right once it's been cured once it's cured inside the
curing oven it moves directly into the trimming area. Now this is your dirty area.
So far in the dust but there you'll see it moves directly into this area
trying to keep the dust outside of the manufacturing. But this is where the
similar thing happens to where fuselage and the wings are meeting for the first time
where the integration process happens. So these are the drilling jigs where the two wings are
mated and once they're mated the flaps are being installed and then it's mated with the fuselage.
So this is what we call the dirty integration shop and as you see we try to keep it as neat
as possible but this is the most dirtiest part inside the factory. Right and you have these huge
vacuum suction things to get the dust away. These things are designed to make life quite
easy and clean the product. We are still used to it in the previous factory we had none of these
fancy dust extraction units but it really helps us to keep the dust control and to enhance the
quality of the working environment. And of course not better for the employees. Much better for the employees.
But what we believe is that we can produce a higher quality product if the
housekeeping is to a maximum level and that the facilities support the processes. And now for the
first time we have really processes or facilities that create the process in the environment where
Coming out of the integration shop is the paint shop where it should be a bit cleaner.
Take into account that it's still a work in progress so we're busy commissioning the
paint shop. So our challenge on the previous site was that we didn't have enough paint shop spaces
and to prepare and sand and this is the first time where we actually designed the process
what's required. So the first step if you can have a look here is the dry sanding area.
Most of the dust is created so you see inside the paint shop there's absolutely no dust.
We try to keep the dust free and if you look inside here I'm not sure if we can enter here.
Okay so this is the the dust area so dry sanding is happening here in the preparation for the
paint shop. You can see good lighting and temperature control here and most of the
process is happening in that creates dirt is made outside of the paint shop.
And how long does it take to make all the painting from where the surface finish here
for one glider? We normally allow aircraft to be four weeks inside the paint shop because
if you take it a bit slower then the process of curing is more advanced. So if you rush the
process but we have seen you have more shrinkages and surface distortion at later stages. So just
to slow down the process slightly is more beneficial. Okay but you have space here for
more than one aircraft. Luckily yes. It just looks huge but these are not all paint scooters. No this
is a this is the curing oven so for after paint shop we can go into the curing oven. As you can
see it's not prepared as yet but this is the the intention of this is to cure the product after
it's been painted. Okay how high temperature is here? Only 45 degrees so it's low low temperature
so you don't want to do any post curing again. And then we have the two spray booths. So one
spray booth is dedicated for the white top coat and the other one for the colors. But it's also
redundancy so whenever we have a issue with one booth for maintenance purposes we have a redundant
system without affecting production. Yeah so obviously over the years we were never satisfied
that we have reached the stages of the paint quality we what we aim for. And introducing
Vanner into the process and with the new facilities now I believe that the products coming out is
really something to be proud of. I think we did well. So Vanner so thanks for your work and tell us
what were the secrets? Well experience is a secret. Years of experience, production changes,
procedure changes, just looking at more modern procedures, more modern products.
As you can see we've obviously invested in ourselves we've really I think prioritized
paint and in a factory like this you can see we've prioritized paint. So it's very important
to us to have like very low customer complaints snags and paint now so we really address and speak
to the customers and ask them what they want and really like we're at the moment trying to
get through to the customers and show them that we've changed our processes and we're really
proud of what we're doing at the moment. So that's very important to us. So the customers
obviously in the past we had some here and there few little issues as anyone has but we are not
ashamed to admit it and we are very proud that we could deal with it in a good way and get the
quality where it should be and I believe we're probably the best in the world now.
Or we at least work towards it. It looks insane I didn't see that on any other
sailplane manufacturer to have that line. I think we need to look there at ultralight or plain
painting booth. I've worked in a few areas and I must say this is the first area that looks like
this without work. I've never seen a spray booth like this, a spray shop like this. Even our
bathrooms inside the factory we try to keep it the same level as our product so if you look here
we try to keep a high level of industrial bathrooms just because I think a bathroom
almost define your identity if you're serious about housekeeping or not. You are not scared
that the employees just sit there because it's so nice and watch on the phone? At least they have
excuse it's nice enough to do it. So the final assembly area after the rough area which was
dirty is now happening here so this is the more clean final assembly section where we're just
prepared before it goes into paint shop and in this corner that you see down here is the dedicated
DG1000 workshop. You can already see some preparation work is done here for the fin section
with all the DG1000 tooling so this is the small Brugsal area in South Africa but as you see
the first lot is still in construction at this moment so it will be arriving here shortly.
Some of the areas that's not been 100 completed is the canopy area so this last area will be
the canopy area where you put the canopies on which needs a bit more temperature and dust control
area and this is why we call this a clean room and should be in commission in a couple of months or
ready with it with our night offices on top that will make some some factory offices and now as we
move through the factory it becomes more clean so this section is the final assembly section where
where the final touches happens the installation of the instruments
and the engine systems are happening. On this side you will see the final wiring looms are
being pulled in, the cockpit is being constructed, the final fitting of the tailplane and rudders
happening here and then if you if you move out of this section it's quite empty now so you can
see there's just one aircraft in production here so the next one's coming from paint shop will be
entering production soon and then we have a bit of a pile up in the in the engine installation
section so firstly we have the new solo 2625is or silent engine we call it the Sheru engine
which as you saw before it's absolutely phenomenal addressing the vibration issues
the bay is being constructed here prepared for the for the dropping of the pylon so you can
see here all the all the preparation work has been completed here the engine pilot is then
constructed separately and the drop-in installation into the fuselage it takes about a week for the
final stages of the engine to be completed. And is the engine did the engine run before already
outside of the glider or is it installed and will be on the for the first time in the glider?
It is tested at solo in the production line so they run at least an hour on it but they have to
comply with the engine run in protocol which could be I think it's about an hour on full
power which they test the engine to ensure before they dispatch it for installation.
So we have Leonor here one of our specialists installing the engine here now this is the final
product you can see all the wires and cables nicely neatly hidden and we try to make a fairly
clean installation. Let's have a closer look here to the cockpit and we see here all the smaller
parts also the optical carbon fiber parts on the side ah yeah here these sliding pockets and
invention of you. My personal but my only contribution to the design team that is my
level of engineering that I accepted. Yeah yeah if you if you look at some of the cosmetic parts
as you said the interesting thing that we made different to this aircraft is the prop stop so
the propeller doesn't have sufficient friction in the system to stop by itself so therefore the
propeller brake is required so if you pull that propeller brake which is hydraulic brake
it stops the propeller at any position once it sends that it stopped and you already put it
when you stop you can just retract it so if you retract it and the propeller is not in position
you see the prop brake coming out so now you see the prop brake coming out and it advances it to a
small position downwards because of the the speed of the propeller it will slowly go over the
compression phase and it will continue until it needs to stop once it needs to stop it will then proceed
and do the full retraction yeah all done automatically. What does it cost extra if you
want to have like such a nice paint scheme here on the front or is it included? No there's all
options for different paint settings depending where you select it so every every section
has got a specific price on it if I remember correctly by having these complex paint schemes
about three and a half thousand euros extra so it's quite a bit of extra money involved in it
but we try to break it down so that each design costs the exact hours that it's costing which
are built towards the customer so you can actually build it up so that it's not always the the full
complex okay complex price and you can also see we try to to match the the upholstery with the
colors of the aircraft as you can see here inside they are nicely the the upholstery matches the
the paint design so these are the the thinking area where a lot of thinking happens simultaneously
and all the time so we have some garden offices here so you can actually open the the doors here
and experience a bit of but it's quite smart because you see all the green you see a bit of
light and so on but you can't see the cumulus if you're sitting in here what community yeah
maybe it's not the best country for glider flying I don't know used to be so that ends our tour of
this small production line here and I hope it was interesting it's it's it's huge it's super cool to
see the complete process of a glider from start to finish and yeah the facility is amazing so I
hope you can travel by glider and tell us if this is the ideal product for travel by glider
yeah we'll see thanks Stefan
and face was also playing always playing with me flying gliders with my dad and eventually
think he's losing out on something so we joined the going out to the airfield on the hard days
and do some gliding but in the end we built this company but at the end of the day
is make this all happen you know me and bossy take out the new stuff design the new gliders
it's all fun for us they do the hard work he makes this company the heart and soul of yonker
sailplane is yonker I just want to thank my brother for for taking my dream and making his dream and
running with it far further and wider than I I never thought or envisioned what would happen I
wanted to build one glider for me but I couldn't do why I'm chasing this guy I can't I can't catch
him he's flying a jasonite