From Scrap to Supreme: The Ultimate Million-Dollar CAT D11 Restoration! 🔥
Can a completely wrecked, twisted hunk of metal worth millions be brought back from the dead? In this episode, we take you inside the ultimate mechanical resurrection: turning a destroyed Caterpillar D11 Bulldozer into a brand-new, factory-spec powerhouse!
The CAT D11 is the king of the mining world, but this specific unit took a devastating hit. Watch our team of expert heavy-duty mechanics strip it down to the bare frame, overhaul the massive engine, replace the entire undercarriage, and precision-weld every single component.
It’s a grueling, high-stakes, million-dollar rebuild journey. Will it roar back to life, or is it too far gone? Strap in and find out! If you love massive machines, extreme restorations, and heavy machinery engineering, don't forget to like, comment, and subscribe for more epic rebuilds!
Dozers look like when they arrive here at the end of whatever life they may be, first,
second, third, or fourth life, anywhere from that 12,000 to 16,000 hour range, depending
on the customer.
Dozers come in here, they're visibly tired, they're worn out, they're ready for a full
rebuild.
So this is the line of dozers that are awaiting rebuild.
Fitting Regina has rebuilt over 100 of these.
As you can see, they have many more waiting to go in the shop to be rebuilt.
Heavy equipment, think of it as a convenient arrangement of components attached to a long
life sturdy frame.
So when the dozer arrives in the shop, it comes in fully assembled at the end of its
life, whether that's first, second, third, or fourth life.
The dozer is stripped of all of its components, those are then dispersed throughout Finning's
shop for full reconditioning in-house.
Then the frame is left for inspection.
Depending on customer requirements, Finning either performs non-destructive testing or
a thorough visual inspection to identify cracks in the frame that need repair.
So what do the repairs look like?
They'll go ahead and gouge out the crack and then re-weld it.
When you're welding on a cast frame, it's not as simple as you think.
You have to do a lot of preheating and post-cooling treatment to allow the metal to cure so that
the frame retains its OEM rigidness.
This is what a frame looks like.
This is one of the early stages of a rebuild.
Everything's stripped off.
They're looking at the wiring harnesses on the frame, they're doing a frame inspection.
As we progress through the shop, as you'll see, components, as they're rebuilt, start
to appear and get assembled on the dozer until it's finally assembled into a full D11.
Components from the D11, like transmission, torque converter, final drives, the diesel
engine, hydraulic cylinders, cab, and many more components are all taken off and rebuilt
in-house.
So it's no secret CAD equipment is built to be rebuilt, and that's why Finning rebuilds
99% of components off those D11s in-house here.
So this part of the shop is where they rebuild the engines.
So once the engine comes off the tractor, it gets stripped down basically to the bare
block in which they measure everything.
So for instance, they'll do what's called decking, is which they'll deck the cylinder
head and take some material off to get it back into a spec or a tolerance.
If the cylinder head deck is too low, they can actually do what's called spray welding.
So they actually add material on, then take it back off to bring that deck height back
up to an acceptable tolerance within CAD spec.
Additionally, they can hone out each cylinder because the C32 takes liners.
The liners fit in here and have to meet very tight tolerances.
So if they need to build material back up, they can add it in by welding, or they can
take it down and get it back to a true spec.
And that's all done by this machine right here called the Rottler.
Accurate to one-tenth of a thousandths, this is a machine that does all the work on these
engine blocks to get them back to a true spec so they can be built back up and go right
back into the very tractor they came out of.
Cleaning up every piston, changing them.
When it comes to undercarriage on the big D11s, a lot of the components do get replaced,
but many actually get rebuilt.
The track group, which is the rails and pads, often gets replaced with new, and the same
goes for the rollers.
However, for the idlers, those are rebuilt in-house by finning.
The idler is first put on a lathe to remove imperfections and bring the surfaces true.
The idler is then placed on a flux welding machine, which uses two flux-cored arc welders
to build back up the surfaces to a true spec.
Using this technique, finning can rebuild the idler for less than 50% of the cost of
new.
After welding is complete on the idler, it goes through a post-welding heating and cooling
process, which both involves heating and also placing the idler in an insulated box that
allows it to cool at a specified rate, allowing the metal to cure properly.
These are the track frames off a D11, as you've seen in the shop, where they rebuild the idlers,
which go on either end.
Most of the rolling stocks or your rollers get replaced, and then your minor bogeys,
which are this, and your major bogeys get welding.
If there's cracks, it's the same thing with the actual track frame.
The cannon inside gets resealed, and any other components get replaced so that the whole
cannon and piston assembly that tensions the track is fully refit for another life, but
this is what it looks like before it gets painted, and finning, again, does this all
in-house.
As for the blades and the push group, depending on the customer, sometimes finning will rebuild
the blades and the push group.
Some customers elect to rebuild the blades on their own, while finning does the push
group and focuses on the rest of the tractor, but this is one of the key components to a
bulldozer, is track on ground.
This is where they rebuild the cabs off the D11s, so they come off the actual frame and
chassis and get rebuilt here.
You can see this is a TKN series, or next gen, because they have a forward hinging door.
We go back here, this would be a JEL or a D11T, because we have the door that hinges
rearward, so that door opens forward, this door opens rearward, but as you can see, they
do all the wiring harnesses, all the seats, everything inside, those are basically as
good as new when it goes back to work.
Hydraulic cylinders like hoist and tilt cylinders on the blade and ripper cylinders are rebuilt
in-house in Finning's cylinder rebuild bays.
The rebuild process involves a full reseal of the cylinders, repacking, honing out cylinder
barrels, rebushing the ears.
There are only a few things that finning doesn't do in-house.
While they inspect the chrome on the actual cylinder rod, if there is any damages and
it needs to be re-chromed, finning partners with an outside vendor to achieve this.
Additionally, hydraulic pumps are rebuilt by an outside vendor.
Finning also has the ability to produce all these hydraulic hoses you see on the big dozers
right in-house.
So for these D11 rebuilds, how do you make sure all the parts are available?
Well, that's where Finning's warehouse team comes in.
They use 30 to 180 day outlooks to build a parts list for each individual rebuild.
So how do you organize all the parts?
Well, they go by color coding, so each rebuild has a different color code, and it's broken
down into what are called segments, which is right here.
So each rebuild has 177 segments, and each segment has a box.
So that basically equates to a whole lot of boxes and a whole lot of parts.
So each of these boxes is filled with different parts depending on what phase the dozer is
in and rebuild, whether that's engine rebuild, pivot shaft and equalizer bar, cab, wiring
harnesses, each segment or phase of the rebuild has its own box.
So it's a whole lot of parts, and that's where this large warehouse on-site here comes into
effect to make sure everything is on-site, at the ready for each rebuild.
The reassembly process is no different than disassembly.
Once the frame is ready and components are rebuilt, following the guidelines within CATS
Service Information Systems, or SIS for short, each component that was originally taken off
the dozer is then replaced and the dozer is built back up and once again begins to resemble
a D11.
With both the construction and mining industries booming, across Finning's dealer network in
the last year, which was 2025, Finning hired over 200 technicians to meet the demands of
their customers and the industry.
In the next two years, they hope to hire over 600 technicians as both the industry which
Finning serves and their customer base continues to grow.
So if working on big mining equipment like this is your thing, now's your chance to get
in with Finning.
Once the dozer is fully reassembled, a final inspection and testing of all systems is completed
within Finning's yard to ensure that the dozer is ready for final paint and decals and commissioning
with the customer.
So this is the paint bay here at Finning Regina, as you can see it's quite large, you can easily
fit a D11 in here.
After a D11 is fully rebuilt, one of the final steps is paint and decals, the dozer will
come in here, it takes roughly two days to paint it, and they don't use as much paint
as you think, it only takes 10 gallons to paint this whole dozer.
So they tape off the parts that are black, they paint a beautiful cat yellow, and then
they unmask and remask and paint the other parts black.
So the point of painting it black is to minimize glare, so when you're working out in the field
on the tractor, you don't see the glare from the sun off the bright yellow paint, that's
why some parts of the tractor are black.
But this is it, this is where these big tractors get painted, right here in Finning Regina.
So now you're probably wondering, how long does it take to rebuild a D11?
Well, roughly 10-12 weeks, or 2400 person hours to rebuild one of these machines from
when it rolls into the shop, all the components, to get it looking like this, with fresh paint
and decals.
You may wonder, why not buy a brand new dozer, why rebuild what you have, well, considering
that a rebuilt dozer like this costs half of what a new D11 from Caterpillar costs,
they can rebuild this faster than the lead times on a brand new D11, and these tractors
offer the same physical availability on site as a new D11, it makes sense why a lot of
customers are choosing to rebuild their D11 fleets.
A rebuild basically does three things, it extends the life of the machine, it reduces
operating costs because you get a like new tractor with zero hour components with warranty,
and it improves the reliability of the machine on site.
A rebuild decision is based on the inherent quality of the OEM's machine, meaning it must
support a second, third, and even fourth life rebuild.
If the tractor itself isn't worthy of rebuild, meaning it doesn't have a good frame, doesn't
have components, and doesn't have the support from the OEM, there's no point in rebuilding
it, but with Caterpillar equipment, you can rebuild it not once, twice, three, even four
or five times.
Some of the tractors that Finning has rebuilt here have up to seven lives now, which is
90 to 100,000 hours based on that 12 to 16,000 hour mark, so these dozers have been lasting
a long time, and this one here is going to go out and work another 12 to 16,000 hours
and end up back here again for another rebuild.
As mentioned earlier in the video, Finning has rebuilt over 100 of these large track
type tractors in their Regina facility, representing over 240,000 hours solely dedicated to rebuilding
D11.
In fact, the 100th D11 to be rebuilt here was actually the 40,000th D11 built by Caterpillar
out of Peoria, Illinois.
Finning's branch network operates as a coordinated system where specialized facilities like Regina
handle complex rebuilds, while other branches focus on response and repair work and rebuilds
on different types of equipment.
For customers, this means access to the right expertise for every job, no matter where they
are located.
So a big thank you to Finning for not only hosting us on site, but helping organize the
tour of their shop to show you how these giant D11 dozers are rebuilt.
If you want to learn more about Finning, I will leave the link to their website down
below.
Whether you're looking for a career with Finning or you're just interested in what they do
in their business.
Thank you so much for watching, I hope you learned about how they rebuild D11s like this,
and we'll see you.
The 785 is hauling, this is obviously sped up for demonstration purposes, they do not
drive this fast here in New Zealand on mine sites, but any data that comes off the trucks
such as fuel burn, load counts, payload, anything like that that can help windstills as an operation
operate better as a business, Commaster Smart Corridor collects and then relays back to
this hub.
So you've got a tally of all your equipment or plant here, and then a live feed which
can be summed up at the end of the day and shows all the data.
So in each machine they have a little tablet which gives them the ability to select, depending
on what product they're hauling, to dump in each grade or each product, because there's
a variety of products they produce here.
So the operator can come in on a 785, come out to the truck, pick which stockpile he's
going to dump in, and then that will actually give an accurate record back to this database
of how much material has been added over the course of the day to that stockpile.
So it's a telematics and production software that allows windstones to get an oversight
of what their haulage fleet and production fleet is doing on a daily basis, which in
mining everyone's got a different opinion of what's going to work better and what's
better and how should we mine and what not, but really data-driven decisions are the best
way to operate as a mining company, and that's what windstones has done.
So this is the weighing station.
So all the trucks that come in get weighed, and then once they get loaded they go through
a little wash bay there, so they're cleaned when they go on the roads, and then they get
weighed on the way out to see the amount of product they're taking from the site so the
site can track it.
But on a busy day, which is most days here at Panua, one truck will go in and out of
there every 37 seconds, so they do about 2.5 to 3 million tons per year out of this quarry,
so every 37 seconds a truck is going across that scale.
We're at the primary crusher here, it's a primary jaw crusher.
Panua runs a stockpile feed, because they found it's better to run their crusher at
80% full rather than have trucks dumping it, so it's either overfull or empty.
So we've got a WA-600 feeding it, that machine's equipped with smart quarry, so the advantage
of having that technology on that loader is one, there's an operation they get production
summary every day, so how many tons moved, cycle times, fuel burn, any fault codes, so
a bit of a telematics aspect.
Additionally, from a safety standpoint, in his screen he'll know when a truck, so a HT-785
is coming into his work area to dump, so he can always be aware of what trucks are coming
into his work area, so there's a bit of a safety factor built in as well.
But this is where rocks like this get turned into one of 43 different products they produce
here at Panua, so the WA-600 feeds it in right behind us.
These are the stairs on the 785s here at Windstones.
They're hydraulically powered, but it's just a safe way to access and egress the machine
without having to climb up and provide potential tripping and slipping, especially when it's
wet, so rain, they don't really get ice and stuff here, but pretty convenient.
So we're here in the cab of the 785 with Stephen, he's going to tell us about the Komatsu Smart
Quarry that's set up on the haul truck.
So the load is going to be under that digger over there that you first fill in.
So if we press that one there, that's that digger, he will load us with the material
that we click on, like that one, and say we're picking one of the levels inside the quarry,
RL 90, which we are doing now, and we pick rock, so we're picking rock there.
The system will put everything to the office, where did you get it from, who was loading
you, and where is the destination, and how much.
There's the tonnage, so we can load say 100 ton, so over here in the corner we have the
operator messages, they can send us messages, so you click on the message.
Pre-starts, pre-starts is when we start the vehicle up just before that, we go around
the vehicle and see everything is alright, if there's any faults you can record it, and
it's everything recorded on this.
Say for instance you need to stop for fueling, you press fueling, and the system will show
you the fueling, and it will tell the boss in the office, right that vehicle is not working
now, it's fueling.
So everything is ready for the user just to click and use and go.
Easy to learn?
Easy to learn, it's all like you see on the pad, and it just makes it so much easier,
no paperwork.
The Smart Quarry, or SQS for short, 775Gs also have it equipped, because you'll find
a lot of quarries they have kind of a mix match of equipment, it's not all Comatse,
it's not all Caterpillar, they run different brands of equipment, so the Comatse Smart
Quarry can be fitted on other brands of equipment, like the CAT 775G, as we'll see in a second.
But this is also another example, so the CAT 775s have Comatse Smart Quarry, the 395 is
also going to get a Comatse Smart Quarry, it's not fitted with it yet, but again it
just goes to show how that technology can be placed onto any brand of equipment.
Six and a half cubic meter bucket, leaf holes, but these look as full, these will actually
fit.
The best part about this machine, and this goes out to Ryan Neal of Caterpillar, is this
is a non-tier 4 395, so everything in Canada is tier 4, but this thing sounds as it should,
unrestricted, no emissions, how a 395 should be Ryan, take note, the New Zealanders know
how to do it.
So, roughly out of here each day they'll pull about 13,000 tonnes to feed the primary crusher,
so this is kind of a mixture, this is a bit of brown rock, but there's blue rock, which
is the grey wacky they mine here right below this.
So, this is the prime stuff that's used in construction all over New Zealand, everyone
who builds something, whether it's bridges, roads, schools, foundations for a home, uses
the blue rock, it's such a high quality.
That's it, turning big rocks like this into little rocks, here in New Zealand.
Five minutes last morning, we're here with Red Bull Powder Company, I'm not sure who
was first, Red Bull Powder Company or Red Bull the energy drink, anyway, we're here
with Red Bull Powder Company, they're doing a 30,000 tonne blast here at Hanua, they're
using 9 tonne of emulsion, they use Austin detonation to set it off, this is where the
rock begins its journey, right here in the quarry, blasted, hauled, crushed, sized to
different products, ends up anywhere all over the North Island.
Six, five, four, three, two, one, fire now.
Got a one full fire of local guy in China and it's out down this thing so far back here.
EC1250 at Hanua, it's down for a bit of maintenance today, it's the Dash 11 and it's running
the Matsu Smart Quarry set up, so it talks with the haul trucks and also talks with that
dashboard we looked at earlier today, but we'll go up inside the cab and have a look
at the SQS.
I dare not put my work boots in here because these are, get a close up of that, these are
some of the cleanest cabs I've ever seen, they've got carpet in here, look at that.
It's a good example of what you get when you get the Komatsu Smart Quarry, so each machine
that's equipped with it, so haul trucks, that WA600 and this EC1250 has a screen in the
cab, so this communicates back to that dashboard and relays all the production information
telematics and things like that, so interestingly enough this bucket's actually built by Jaws
which is an Australian manufacturer.
In Canada we have manufacturers like WBM, CWS, Bradkin, but this is what you see a lot
of over here in New Zealand because it's an Australian.
We're just doing some addition of some more wear parts, so these are heel shrouds, we've
got some teeth that are getting replaced, a couple side cutters, a couple wear parts,
so that's why the 1250's down today for maintenance, inconveniently when we visit, but nevertheless
we got up close with it to check it out, so since it's a super production machine it's
a little bit bigger of a bucket, or spade as we call them in Canada.