This is the first episode in a new series following the construction of a small, but very stylish, vacation home for one of our clients. We are calling it The Modern Mountain Getaway, and it features vaulted ceilings, a huge wall of windows, and lots of outdoor space for the owners zen garden! In this series, we will highlight building techniques, building codes, order of operations, cost, building materials and tools used, and also even talk about the problems we run into during the build! This is going to be good fun.. And the best part is that you can rent this home for your own mountain getaway when it is complete!! For anyone interested... i will be making a set of plans available for purchase very soon (VERY CHEAP)!
We are building this home on a budget of course, so we will also be discussing how we choose materials (and designed the house) with the budget in mind! This is a huge part of any build, and one that I think is overlooked in many YouTube videos.
Episode 1 is all about the first day "on site." We have to find existing infrastructure, position the home on the site, mark and square up the foundation and set reference pins, dig the footings, set grade pegs, and install steel in the footings. Not bad for a day!
AI Generated·May contain errors
Video Summary
AI Generated
Eric Perkins introduces the \"Modern Mountain Getaway,\" a 1,050 sq ft custom home in Bryson City, North Carolina. This first episode covers the critical initial phases of construction, focusing on site preparation, locating existing utilities, laying out the foundation, and digging and reinforcing the footings to ensure a stable build.
Hey guys, I'm Eric Perkins. Welcome to the first episode in a very exciting series
that we're going to do following the construction of a home from
start to finish, every step. We're calling this home the
Modern Mountain Getaway and it's located in beautiful Bryson City, North Carolina.
Let's get going. Okay, let's check out this house. This is a 1,050 square foot
custom home. That means it's for a client. 750 square
feet is on the main level which will be a stained concrete slab.
There's also a 300 square foot loft with a bath and a mechanical room.
The house faces south and features large vaulted ceilings,
huge view windows, and lots of outdoor space. This is it.
First scoop.
Well, it wasn't quite that easy. Let's start over.
I spent most of the morning probing around for an existing septic system.
There was a house here before but the county did not have a good record of
where the thing was. After a while, I was just lucky enough to
find this. A little piece of pipe sticking out of
the ground. I followed it and it led to the old septic tank.
That was a major save right there. And it was worth the effort. We actually
had the house laid out across the top of the septic tank which would have been
bad news. I had my septic man, Chris Dietz, look
over this tank and make sure it was in good working order which it was
thankfully. Then we followed the outlet to a
distribution box which led to the leach field lines which we also had to trace
down to make sure they weren't under the
house which they were. Man, this house was laid out in the wrong spot to start
with. In order to find the exact location of
these leach field lines, we used a locator.
This is a two-part operation. One person feeds a snake into the line that has a
locator on it while the other person traces it from
on top of the ground and marks it with some marking paint.
I got to try this for a while and it wasn't as easy as I thought it was going
to be. These guys are pros and they know it.
Right there. That takes some practice. It's not as easy as it looks actually.
Yeah, take a look at what that looks like. Saves a lot of probing.
Yeah. Wow, all right. He's got a little line on that.
Looks like a little key fob for your truck almost.
Cool. All right, we've located that line. Now we're going to mark
six feet off the line because five feet is the minimum and we
actually don't have much room on this property
so we need every bit we can get. A foot extra just to be safe
from all this septic stuff and we can actually start
laying it out. We started laying out this foundation by setting one corner,
one pin to start with, and then we were able to pull diagonals along with a
straight measurement with long tapes to get all the other corners. Now this
is a fairly small simple house and that's why I'm doing this series about
it. Every step will happen a little faster
than on a big project. All right, 41, 2, and 3 16ths right there.
Pop it in. Inside. Yep.
Yep. Once we had all of the corners square and pinned, we pulled some
reference locations and instead of using batter boards in
this case, we just used some 2x4 stobs with a T25 deck screw in the top.
This is a really flat site and not a complicated foundation
so this was a great way to save a little time. Also the track hoe can run right
over these things when he's digging without tearing them up like a batter
board. Our next step was to mark the outside of the actual footings.
Now this is five inches outside of our pins because our pins mark the actual
foundation. Since we're using a 20 inch wide bucket,
we're going to end up with five inches of the footing sticking out
both sides of the foundation. Oh, got your fingers.
Which is eight inches wide. This property has a bamboo forest on it and it was
cleared about a week ago. Now it's 12 feet tall again. I bought a
machete today. Now that everything was laid out and
squared up, it was time to actually dig the footings. This is the fun part.
I love watching machines operate. I'm not very good at it but Chris is
really good. My job was to run this laser reader
and make sure he was digging to the right depth as we dug along.
You don't want to dig deeper than you need to because you're just going to end
up dumping extra concrete in there. If you're
wondering how I figured out how deep to dig, I simply went 12 inches down from
the lowest point on this whole area. 12 inches down is the code here for
frost line. And I kept this rock. That's definitely
the state of North Carolina. Man, Chris did a really nice job here.
These footings are straight and perfectly level on the bottom.
Next I went around and probed the footings. Now the inspector will also do
this but I do it before he shows up to make sure every spot on these footings
is good enough to hold this house up. This will save you time and make you not
fail an inspection by the way. Next I reset the laser reader on the
grade pole eight inches higher than the bottom of the footings.
This will represent the top of the concrete in the footings.
After spreading out some grade pegs, in this case I used three eighths rebar,
I would just go around and tap them in until they're all perfectly level with
one another. And this is really important. I put
them about five feet apart. That way it's easy to get the concrete
level. If you ever tried to lay block on a
foundation that didn't have grade pegs set by laser,
I'm sorry. One time some guys did a footing for us and they used no grade
pegs at all. I watched them cut every single block
on the first row to get it done. It was miserable looking.
We also added two rows of number five steel to this footing
and it's not required by code around here but of course we do it anyway. It's
very cheap insurance to make sure that your foundation
is really strong. They have to overlap by two feet anywhere they join and you
simply tie them together with this steel wire.
Here's another really important step. Make sure to clip any roots or other
organic matter out of your footing. You don't want this stuff hanging in
and making a termite highway right into your house
or getting all in your concrete while you're trying to finish it.
Here's a look from the top of the hill. Chris actually adjusted the grading so
water would flow to the back of the site
and then off to the left. You don't want it running off the front because it'll
erode the fill. I also spent quite a bit of time on the
phone making sure that Duke Energy was going to come take these power lines
down. They run right across the top of where
the house is. We want to go underground and get rid of these things.
Thanks for watching our video today and make sure to check out this whole series
about building a house. It should really help you out if you're
doing your own project. Also keep an eye out for a related video that I'm putting
out on site planning. What you need to do to get your site ready.
It goes right along with this series. Thanks for joining us today.