Witness the incredible world of mega engineering, heavy lifting technology, and modern construction machinery in this jaw-dropping documentary compilation. From Mammoet’s giant PTC super cranes lifting thousands of tons, to the assembly of the massive SGC-120 ring crane, every operation demonstrates the extreme precision and power behind today’s largest industrial projects. Watch advanced automatic rebar packing machines streamline steel production, see the complex demolition of a giant tower crane in Tokyo, and explore the construction of high-speed railway switches deep inside the Gotthard Base Tunnel. The video also features the future Samuel Oschin Air and Space Center, home of the legendary Space Shuttle Endeavour. This documentary showcases crawler cranes, heavy equipment, industrial automation, railway engineering, mega construction projects, and the teamwork required to build the future. If you love engineering documentaries, construction technology, giant machines, and extreme industrial operations, this video is for you.
Timeline
0:11 — Mammoet PTC Super Crane & Heavy Lifting System 1:58 — Automatic Rebar Packing Machine in Steel Factory 5:17 — CC8800 Boom Booster Crane Assembly Process 7:14 — Final Safety Inspection Before Heavy Lifting 9:01 — Tower Crane Demolition Begins in Tokyo 10:32 — Giant Crane Jib Removal Operation 12:05 — Tower Mast Sections Dismantling Process 21:49 — Samuel Oschin Air & Space Center Construction 22:52 — Gotthard Base Tunnel Railway Switch Installation 31:29 — SGC-120 Giant Ring Crane Mega Assembly
This video showcases a variety of high-capacity industrial engineering feats, focusing on advanced heavy-lifting machinery, automated construction systems, and complex dismantling operations. It highlights the precision and coordination required for projects ranging from the assembly of giant ring cranes to the installation of high-speed railway components in challenging environments.
What hidden engineering transforms empty ground into massive infrastructure and towering steel
structures that reshape the future before our eyes? Mammoet's new generation of Platform Twin
Crane, or PTC, represents one of the most powerful lifting systems ever developed for
super-heavy construction projects. The Advanced PTC 142 hundredths and PTC 210 cranes are specially
designed to handle enormous industrial components with lifting capacities reaching up to five
two hundred tons. The cranes use a unique containerized design allowing rapid transportation
and assembly anywhere in the world. Despite their massive size they require only a compact working
footprint of 45 or 55 meters while still providing full 360 degree slewing capability.
Their engineering allows them to operate in extreme environments
from freezing arctic regions to hot desert conditions even during strong winds or minor
earthquakes. One of the greatest advantages of the PTC system is its ability to remain in a
single position while covering an entire construction site, greatly reducing relocation
time and improving efficiency. The twin boom configuration increases stability during heavy
lifts while redundant drive and control systems enhance operational safety. Some models can lift
up to three 200 tons to heights of 120 meters demonstrating the extraordinary power of Mammoet's
modern super crane technology. The Automatic Rebar Packing Machine is an advanced industrial
system designed to organize, align, and bundle reinforcing steel bars with high speed and
precision. In modern steel plants handling large quantities of rebar manually is difficult. Time
consuming and unsafe. Therefore this automatic machine plays an important role in improving
productivity and reducing labor requirements. During operation finished steel bars are transferred
onto the packing line through a roller conveyor. The machine automatically detects the length and
position of each rebar and arranges the bars into neat layers. After enough bars are collected the
system pushes them together to form a compact bundle. Hydraulic or mechanical clamping devices
hold the steel tightly in place while automatic tying units wrap steel wires around the bundle at
several positions. The entire process is controlled by an intelligent automation system that ensures
accurate counting, stable alignment, and consistent bundle size. Sensors continuously monitor the
movement of the bars to prevent misalignment or jamming during operation. Once the bundle is
secured the machine transfers it to the discharge section where it can be lifted by cranes or
forklifts for storage and transportation. Compared with manual packing methods the automatic rebar
packing machine greatly increases efficiency and production capacity. It also improves workplace
safety by minimizing direct human contact with heavy steel bars. In addition the machine produces
uniform and tightly packed bundles making loading and shipping easier and more reliable. With its
combination of automation, precision, and heavy-duty performance the automatic rebar
packing machine has become an essential piece of equipment in modern rebar manufacturing plants.
The assembly of the boom booster system for the CC8800 crawler crane began with the preparation
of the massive lattice boom sections on a large open construction yard. For the BSSL120M configuration
workers carefully arranged the boom components in sequence on temporary supports. Heavy crawler
cranes and auxiliary lifting machines were positioned around the site to assist with the
installation process. First technicians connected the lower boom sections using large steel pins and
hydraulic locking devices. Each joint was inspected carefully to ensure precise alignment before
lifting operations continued. After the base sections were secured additional lattice segments
were gradually added one by one to extend the structure. During this stage workers installed
lifting cables, connection brackets, and reinforcement members required for the boom
booster system. Next the boom booster mast was assembled separately near the crane. Large crawler
cranes lifted the mast sections into position while crews secured them with pins and braces.
Once completed the booster structure was connected to the main boom using powerful pendant lines and
heavy-duty rigging equipment. The additional support system increased the rigidity of the boom
and improved the crane's lifting performance for extremely heavy loads. As the assembly progressed
the giant boom slowly rose from the ground in a controlled lifting operation. Several assist
cranes worked simultaneously to stabilize the structure while hydraulic systems controlled
the movement angle. Workers continuously checked the tension of the cables and the alignment of
lattice sections to prevent deformation during erection. After the full 120 meter BSSL boom
configuration was completed operators installed the final hoisting components and reaved the wire
ropes through the pulley system. Counterweight systems were then positioned on the crane body
to balance the enormous boom assembly. Finally engineers performed detailed safety inspections
and functional tests before the CC-8800 boom booster system was declared ready for heavy
lifting operations on large industrial construction projects. The demolition of the tower crane at the
construction site of the future Keisei Oshiage station front building was carried out over two
intense days from May 26 to May 27, 2015. The entire operation was carefully recorded in a
video showing the complex process of dismantling one of the tallest and most important pieces of
equipment on the project. Because the tower crane had been used throughout the building construction
its removal marked one of the final major stages of the site work. Before the dismantling work began
the surrounding area was secured with safety barriers and warning signs. Workers inspected
the crane structure, checked lifting equipment and prepared the mobile cranes that would assist in the
demolition process. Since the tower crane stood high above the building every step had to be
carefully planned to avoid accidents or structural instability. Communication between the rigging crew
crane operators and supervisors was extremely important. Early in the morning the first stage
of dismantling started at the top of the tower crane. Workers climbed to the upper machinery
platform and disconnected electrical systems, cables and auxiliary components. Smaller sections
such as maintenance rails, ladders and guard panels were removed first. These parts were
attached to lifting slings and slowly lowered to the ground by an assisting crane. Although the
time-lapse video shows the movement quickly each lift required precise positioning and constant
monitoring. After the preliminary components had been removed attention shifted to the long
horizontal jib. The jib was one of the largest sections of the crane and required a carefully
balanced lifting procedure. Workers attached multiple wire ropes to stabilize the structure
before loosening the connecting pins. The supporting mobile crane gradually took the
weight of the jib while the crew disconnected the final attachment points. Once released the
enormous steel section was slowly rotated away from the tower and lowered toward the ground.
Workers below guided the load carefully to prevent swinging. The counter jib at the rear of the crane
was dismantled next. Before the section itself could be removed the heavy concrete counterweights
had to be detached individually. Each counterweight was lifted away one at a time to reduce the load
on the structure. The removal sequence was extremely important because an incorrect balance
could place dangerous stress on the crane mast. After all counterweights had been safely lowered
the rear jib section was disconnected and transported down in a similar manner.
With both jib sections removed the upper slewing unit became exposed.
This assembly contained the operator's cab, motors, gears, and rotating mechanism. Workers
disconnected hydraulic and electrical connections before attaching lifting equipment to the central
frame. The mobile crane then slowly lifted the entire upper assembly away from the mast.
The operator's cab, which had once overlooked the entire construction site, was carefully brought
down to the ground after years of service at high elevation. Following the removal of the rotating
unit the demolition team focused on the mast sections. The tower crane mast consisted of
large steel lattice segments stacked vertically and connected by high-strength bolts. Starting
from the top workers detached one mast section at a time. Each section was secured by lifting chains
before the bolts were removed. The assisting crane supported the weight while the segment
was separated from the remaining tower. Afterward the steel frame was lowered carefully to the ground
staging area. As the dismantling continued the height of the tower gradually decreased. The
time-lapse recording clearly showed the crane slowly shrinking against the skyline of Tokyo.
Even though the video compressed the operation into only a few minutes the actual work required
many hours of coordination and repeated safety inspections. Workers constantly checked wind
conditions because strong gusts could create dangerous movement during lifting operations.
The demolition process also required careful positioning of the support cranes operating below.
Large mobile cranes were stationed beside the building extending their telescopic booms high
into the air. Operators had to maintain exact lifting angles while avoiding nearby structures
and temporary construction equipment. Signal personnel on the ground used radios and hand
signals to coordinate every movement. Precision was essential because many of the steel sections
weighed several tons. During the dismantling process one unexpected incident occurred when a
small component partially detached unexpectedly. Although the issue was limited it demonstrated
the risks involved in tower crane demolition. Workers immediately responded by securing the area
and stabilizing the suspended section before continuing operations. Safety procedures and
quick reactions prevented the situation from becoming more serious. The event highlighted
how dangerous crane dismantling can be even with detailed preparation. As more massed sections
were removed the remaining lower tower became easier to access. Workers standing on temporary
platforms disconnected bolts and guide connections while the lifting cranes supported each segment
from above. The removed sections were transported to a storage area where they were organized for
loading onto transport vehicles. Some components would later be reused on other construction
projects while damaged or worn parts would be inspected and refurbished. The foundation
section at the base of the crane remained until the final stage of the operation. Once the upper
massed sections had been dismantled crews detached the remaining lower structure from the embedded
support frame. Heavy lifting equipment raised the final steel components from the rooftop construction
and lowered them safely to the ground. At this point the skyline above the building site was
completely clear showing that the tower crane had been fully removed. After the main demolition work
ended workers continued with cleanup operations around the site. Temporary lifting gear, steel
cables, rigging blocks and safety barriers were removed. The construction zone was inspected
carefully to ensure that no loose materials remained. Trucks arrived to transport the
crane sections away from the site. The once dominant crane had now been reduced to organized
stacks of steel components waiting for relocation. The time-lapse footage captured not only the
technical complexity of the demolition but also the remarkable coordination of the construction
crews. Every movement depended on teamwork between operators, signalers, riggers and supervisors.
Because tower cranes are assembled in stages during construction dismantling them requires
reversing the entire installation process with equal precision and care. One mistake during
dismantling could damage nearby structures or endanger workers on the site. The operation
also demonstrated the importance of heavy lifting technology in modern urban construction.
In crowded city environments such as Tokyo tower crane dismantling must be completed within limited
space while minimizing disruption to surrounding roads and buildings. The use of powerful mobile
cranes, specialized rigging equipment and experienced personnel allowed the project to
proceed efficiently despite the challenging conditions. Over the course of two days the
giant tower crane that had once dominated the construction site disappeared piece by piece.
What had served as a critical machine for lifting steel, concrete and building materials throughout
the project was finally removed after completing its role. The demolition marked the transition
from heavy structural construction toward the final stages of the building project. In the end
the dismantling of the tower crane became a fascinating example of engineering precision,
safety management and coordinated teamwork. The time-lapse recording transformed a long and
difficult operation into a dramatic visual sequence allowing viewers to witness the
complete removal of a massive crane from the skyline in only a few minutes. Although the
process appeared smooth on video it represented countless hours of planning, technical skill and
careful execution by the demolition crew. The California Science Center is entering a new era
with the construction of the Samuel Oshin Air and Space Center, the final major phase of its
long-term master plan. Designed to inspire curiosity and science learning the new facility will greatly
expand the museum's educational mission and nearly double its exhibit space. At the center of the
project stands the legendary Space Shuttle Endeavor displayed in a dramatic launch configuration
nearly 20 stories tall. Since arriving in Los Angeles Endeavor has captured public imagination
and attracted millions of visitors. The new center will feature interactive galleries, historic
spacecraft, aircraft and immersive STEM experiences. Supported by the philanthropic community this
ambitious project is expected to become an international landmark and a crown jewel of
science education. Inside the Gotthard base tunnel the installation of the high-speed railway switches
began with detailed planning and strict dimensional control. Because each switch section was nearly 95
meters long and weighed between 130 and 140 tons it was impossible to transport the complete
structure into the tunnel as a single piece. The components therefore had to be divided into
several sections and moved individually over a distance of more than 20 kilometers from the
assembly area to the installation point. Every movement followed an exact schedule because any
delay would affect the entire construction program and generate enormous additional costs.
Before transportation the complete switch was first assembled in the switch factory.
Every sleeper was unique, numbered individually and assigned to a precise position. Workers checked
each element carefully because even the smallest mistake would prevent the rail system from fitting
correctly later. The teams understood that the switch had to be installed with accuracy
down to fractions of a millimeter. If the final measurements did not meet the required tolerances
the entire structure would have to be removed and rebuilt. After delivery to the preparation area
the switch sections were unloaded and pre-assembled over a period of two days.
Workers arranged the rails and sleepers exactly as they would later appear inside the tunnel.
This stage allowed the teams to confirm alignment and verify that all numbered parts matched their
designated positions. Preparation was considered essential because once the installation process
started underground there would be very little time available for corrections. A large Kirov railway
crane played the central role during transportation and installation. The crane moved each switch
section into the tunnel according to a minute-by-minute timetable. Every crane shift was
extremely expensive so delays had to be avoided at all costs. The switch consisted of five major
sections and the teams calculated a fixed travel time for transporting each component from the
preparation area to the installation site. Workers coordinated continuously with crane operators,
rail specialists and supervisors to maintain the schedule. As each section approached the
installation zone the teams paid close attention to clearances inside the tunnel. Some parts of the
switch were up to 4.5 meters long in critical areas leaving little space between the component
and surrounding structures. Workers monitored both sides carefully to ensure that the switch
did not strike the tunnel walls or overhead equipment during movement. Safety procedures
were extremely strict because the massive steel components could easily injure workers if handled
improperly. When a section arrived at the correct position the crane slowly lowered it onto temporary
support systems. Workers guided the piece carefully into place using bars and manual adjustments.
Even a deviation of only two millimeters was considered significant. The crews repeatedly
measured the alignment checking left, right, height and track gauge dimensions. If necessary
they pushed or shifted the rails slightly before tightening the fasteners. Experienced track workers
supervised every movement because this level of precision required exceptional skill and
concentration. After one section had been positioned workers prepared the tunnel floor for the next
component. Rails were temporarily moved aside, wooden supports were placed and the working
surface was cleaned and leveled. The process was highly manual and depended on traditional railway
construction methods rather than automated machinery. Each newly installed section reduced
the stress level among the workers because successful positioning confirmed that the
measurements were correct. The switch components were initially aligned approximately during
placement but a much more detailed survey followed before concreting. Survey teams performed fine
measurements to verify that the entire switch geometry matched the design exactly. Once the
final inspection confirmed that the alignment was correct access to the switch area was restricted
so that no one could accidentally disturb the structure before concreting operations began.
Concrete installation inside the tunnel required another series of specialized procedures. Engineers
modified the concrete mixture by increasing the sand content in order to improve workability and
stability. A dedicated concrete laboratory inside the tunnel tested the mixture continuously.
The teams understood that concrete behavior could change quickly underground.
If the mixture became too fluid it could not be compacted properly and would lose its required
strength. For this reason the concrete was approved for use only after laboratory technicians confirmed
that the consistency and composition were correct. During pouring operations workers used immersion
vibrators to remove trapped air from the concrete. This process ensured proper compaction around the
rails, sleepers and supporting structures. After vibration crews performed surface finishing
operations to create a smooth and even track bed. The surface also had to maintain the correct
transverse slope so that water could drain away instead of collecting around the rails inside the
tunnel. Once the concrete hardened welding crews connected the rail sections into a continuous
rail system. The welders carefully joined the rails to eliminate gaps and create a smooth
running surface for high-speed trains. The switch tongue, one of the most important components of
the entire structure, required especially careful handling. This movable rail section determines the
direction that trains will follow through the switch. Some tongue sections measured 27 meters
in length and weighed around 30 tons, making transportation and positioning particularly
dangerous. Workers approached these operations with extreme caution and remained constantly aware
of the hazards created by the heavy suspended loads. The beginning section of the switch demanded
the highest precision of all. The sleepers and rails had to align perfectly because once the
massive components had been lowered into place, moving them again would be extremely difficult.
Teams therefore performed repeated inspections before giving final approval. Every measurement,
every fastening point and every rail position was checked again to guarantee that the switch met the
strict standards required for high-speed railway traffic. Throughout the entire installation process
the workers combined engineering precision, manual craftsmanship and strict coordination.
Step by step the enormous switch sections were transported, positioned, measured, concreted, welded
and finalized deep inside the Gotthard base tunnel until a complete high-speed railway
switching system was successfully constructed underground.
The assembly of the Sarans SGC-120 giant ring crane begins long before the first component
arrives at the construction site. Engineers first prepare a massive working area large enough to
support the crane's 45 meter ring footprint and the assembly of its enormous 130 meter main boom.
The ground must be leveled and reinforced to withstand the tremendous pressure created by
the crane structure, counterweights and support equipment. After the site is secured, transport
convoys begin delivering hundreds of crane components including ring sections, boom segments,
crawler units, lifting cables, hydraulic systems and counterweights. The first stage of the assembly
process focuses on constructing the circular ring foundation. Large steel ring sections are
carefully lifted into place by crawler cranes and connected together with heavy-duty pins and bolts.
Workers precisely align every section to ensure that the ring remains perfectly leveled.
Since the SGC-120 rotates on this ring structure during lifting operations,
even a small misalignment could affect stability and performance.
Technicians inspect each connection before moving to the next stage. Once the ring base is completed,
crews begin installing the crane's support structures in central frame.
Massive steel columns are raised and attached to the ring one by one.
Temporary support cranes hold the sections steady while workers secure them into position.
Hydraulic and electrical systems are gradually connected during this phase
so that the crane's operating mechanisms can later function correctly.
The assembly requires constant coordination between riggers, crane operators, welders and
engineers. After the central structure is installed, attention turns to assembling
the crawler assemblies and rotating platform. Heavy crawler cranes carefully position these
components around the ring. Workers then install the slew system that allows the crane to rotate
smoothly while carrying enormous loads. Every hydraulic line, electrical cable and control
connection is tested repeatedly during installation. Because the crane is designed
for extremely high lifting moments while maintaining limited ground pressure,
each component must be positioned with exceptional accuracy.
The next major phase involves assembling the enormous main boom.
The 130-meter boom cannot be lifted as a single piece, so it is assembled horizontally on the
ground in multiple sections. Large crawler cranes bring each boom segment into position
while technicians connect them together using giant steel pins. Workers then install internal
reinforcement members, lifting cables and connection brackets along the entire boom structure.
The process takes considerable time because every joint must be perfectly aligned to withstand the
forces generated during lifting operations. Once several boom sections are connected,
auxiliary cranes slowly extend the boom assembly further across the preparation yard.
Additional sections are added one after another until the complete boom reaches its full length.
Engineers continuously measure alignment and structural deflection throughout the process.
Any small deviation must be corrected immediately before the next section is installed.
The boom assembly alone occupies a massive area on the ground due to its extraordinary length.
After the boom structure is completed, crews begin installing the back mast and rigging systems.
Large steel pendants, wire ropes and tensioning components are attached carefully to distribute
lifting forces evenly throughout the crane structure. Workers use smaller cranes and
elevated work platforms to access connection points high above the ground. Each cable is
tensioned according to precise engineering calculations. This stage is critical because
the stability of the entire crane depends on the correct distribution of loads between the boom,
mast and counterweight system. The installation of the counterweights is one of the most
challenging parts of the assembly process. A large crawler crane is required to lift
and position the enormous counterweight blocks, each weighing approximately 100 tons.
One by one, the 36 counterweights are carefully installed onto the rear structure of the SGC-120.
Operators move slowly and precisely because even small swinging movements could create
dangerous stresses during installation. Workers secure every counterweight before the next one
is added. As more counterweights are installed, the crane gradually gains the balance needed for
heavy lifting operations. With the main structural components assembled, crews begin connecting the
lifting systems. Massive wire ropes are reaved through giant sheaves positioned along the boom
and mast. The hoisting drums, hydraulic power systems and winches are then connected and
tested. Technicians carefully inspect every cable path to ensure proper alignment and smooth
operation. Because the crane is designed to lift loads exceeding 3,000 tons, the hoisting system
must operate flawlessly under extreme tension. Once the mechanical installation is completed,
the boom is gradually raised from the ground into its operating position. This operation requires
exceptional coordination between multiple support cranes and the assembly team. The boom is lifted
slowly while engineers continuously monitor structural loads and movement. Temporary supports
are removed step by step as the boom reaches higher angles. The process may take many hours
because safety checks are performed repeatedly throughout the lift. After the boom reaches its
final position, the crane undergoes extensive inspection and commissioning procedures. Engineers
verify the alignment of the ring, boom, mast and counterweight system. Hydraulic pressures,
electrical systems and control functions are thoroughly tested. Operators then conduct a
series of operational checks including rotation tests, hoisting movements and controlled lifting
simulations. Every movement is carefully monitored to confirm that the crane performs according to
design specifications. The final stage of the assembly process involves load testing the
completed SGC 120. Heavy test loads are gradually lifted to verify stability and lifting performance.
During these tests, engineers monitor structural deflection, cable tension and ring movement.
Once the crane successfully completes all testing procedures,
it is declared ready for operation. Only after this long and highly coordinated assembly process
can the Giant SGC 120 begin performing heavy lifting tasks on major industrial
and offshore construction projects.