The Insane Engineering of the B 2 Bomber Full Manufacturing Process Explained
Truck Alpha, you are clear on the left. Truck Bravo, easy back, easy back.
Leveling off at Angels 45.
Confirm, all systems green.
Today, we will see the full process of making the B-2 Bomber.
Okay, slide it forward 3 millimeters. 3 millimeters confirmed.
Checking the overlap now.
Check the alignment pin on section 4.
Pin engaged. Pressure looks good.
Set to 250. Confirmed.
Okay, bring it down slowly. Watch the starboard side gap.
Holding steady. Looks good to seat.
Bring it down slow. Hold it right there.
Little bit to the left. Easy now.
Hydraulics engaging. Ease it forward 3 millimeters.
3 millimeters forward. Confirming alignment pin entry.
Bolt 170 verified. Moving to the next sequence.
Sequence confirmed. Initiating torque on 171.
Hold it right there. Is the alignment good?
Confirmed. Securing the bolts now.
Alright team, engaging sequence 4 now.
Pressure set. Starting bolt sequence.
Alright, keep pulling the primary flight control bundle.
Watch that bolt head pass through.
Securing section A now.
The installation of the B-2's fly-by-wire flight control computers
marks a critical stage, ensuring the components are secure.
Alright, bring her down easy. Watch the clearance on the right.
Steady, steady. Looks good.
Alignment confirmed. Lowering engine.
Hardware engaged. Torquing sequence initiated.
Alright, bring her down another 6 inches.
Easy now.
Holding steady on my mark. Looks good.
Hand off on mount 4. Hand off on mount 6.
Mount 8 is reading 450. Verified.
All mounts secured.
Bring it down 5 millimeters.
Coming down slowly.
Alignment check is green. Starting the seal compression.
Watch the alignment pins on your side.
They're engaged. Locking it down now.
Okay, ease it forward on the track. Steady now.
Holding steady. Beginning the lift sequence now.
Lift system's engaged. Approaching the bay.
Verify pressure on the primary line.
Connection looks good. Initiating final sequence.
Check the alignment on your side.
Looks good. Drive the pin?
Roger that.
Lower 2 inch and hold. We are making contact on the port side.
Holding steady. Alignment looks nominal.
Initiate lift sequence on the rotary launcher.
Confirming alignment on the starboard mounts.
Rotation test commencing now. Clear the bay doors.
Easy now. Coming up slowly.
A little to the left. Steady.
Clear on this side. Mounting pins aligned.
Alright, bring it down 5 more inches.
Watch the starboard actuator.
Torque is good on the forward straps.
Okay, confirming group 3 left outer wing is secured.
We have green on the alignment grid. Moving to position.
Copy that. Watching the starboard clearance now.
Integration check complete on bus 7.
Confirmed. All parameters nominal.
Clear on the left side.
Clear. Bring it down slowly.
Bring it down slowly. Watch the seal.
Pressure holding steady at 50 psi.
Roger that. Verify the backup system is online.
All systems are green across the board.
Integration test successful. We are good to proceed.
Nose gear down and locked.
Main gear sequence complete. We show 3 green.
Steady speed Tau Captain. We have 3 feet of clearance on the left wing tip.
Roger that. Coming out slowly. All green.
Truck Alpha, you are clear on the left.
Truck Bravo, easy back, easy back. Hold.
Roger that. Grounding established.
Fuel state approaching 95,000 pounds.
Confirming flow rates are stable.
Walk around complete. Confirming integrated flight and engine control check.
Affirmative. All surfaces responding correctly. Fuel state matches manifest.
Strap in complete. Masks on. Oxygen check.
Checked. Console power engaged. Avionics stabilization confirmed green.
Ground cockpit. Chalks away and external power disconnected. Cleared to taxi.
That angel's 45. Confirm. All systems green.
If you like this full process, please like, subscribe to our channel, and let us know in the comments how you liked our video.

