Battling the Snow- Japan's Northern Railways - Japan Railway Journal

Japanese Culture
97 followers
57 Video Views·Apr 9, 2026
Get the inside scoop how trains are kept on track all winter by resilient railway workers in Japan’s snow country.
Welcome to Japan Railway Journal. I'm Hiro Ueno.
Today, I'm at Echigo Tokimeki Railway's Myoko Kogen Station.
The railway runs through Niigata Prefecture, one of the heaviest snowfall regions in Japan.
In January and February, snowplows are deployed on a daily basis,
and planned service suspensions are also carried out to allow staff to clear the snow.
And here at this station in particular, located in the mountainous area,
large amounts of snow build up on the station platforms and rooftops.
When snow reaches about 1.5 meters, workers begin removing it from the station roofs.
And during snow removal, some train services are temporarily suspended,
and teams of around 30 to 50 workers carry out the task simultaneously.
If the snow is not removed, falling snow can pose a danger to people below,
and the excessive weight may also damage the structure of the roof itself.
In today's program, we're going to take a closer look at the efforts of Northern Railways
in managing heavy snowfall.
Located along the Sea of Japan coast,
Niigata Prefecture is one of Japan's heaviest snowfall regions.
Including conventional lines and the Shinkansen,
16 railway lines operate within the prefecture, where for nearly four months each winter,
the railways are devoted to battling the snow.
Among them, JR East's Niigata branch office oversees 13 lines.
In the harsh winter months, it implements countermeasures
such as snow plows and snow melting systems in order to maintain services.
This is the Joetsu Shinkansen, which connects Tokyo and Niigata Prefecture.
Between Niigata Station and the prefectural border,
sprinklers have been installed along approximately 75 kilometers of track to melt the snow.
When the system detects snowfall, it automatically sprays warm water
heated to about 10 degrees Celsius on the track, melting the snow before it can accumulate.
Before the snow season, inspections are carried out.
Workers adjust the sprinklers, check temperature settings, and remove any rust or dirt.
This boiler heats the water to about 10 degrees Celsius before it's sprayed on the tracks.
This pump collects the sprayed water and circulates it back through the system.
The Joetsu Shinkansen has a lot of tunnel sections that are less affected by snow.
There are about 28,000 sprinklers installed at a distance of about 6 meters.
Before the snow accumulates, the sprinklers melt the snow by spraying warm water.
Thanks to these measures, the Joetsu Shinkansen,
which has been in operation for more than 40 years,
has yet to experience a major delay caused by snow.
While the Shinkansen is well equipped to handle snow,
conventional lines that run deep into mountainous areas require a wide range of measures,
including snow clearing vehicles and manual removal.
In January and February, when snowfall is heaviest,
sudden snow can outpace removal efforts,
sometimes forcing trains to stop at intermediate stations and disrupting operations.
In January 2018, during heavy snowfall,
a train carrying 430 passengers came to a halt between stations and was unable to move.
With no alternative means of transportation available,
even if they could get off the train, the passengers couldn't go anywhere.
As a result, they stayed inside the train for more than half a day.
JR East's Niigata branch took the incident seriously
and strengthened its countermeasures against heavy snow.
This is the operation control center of JR East's Niigata branch office in Niigata.
The branch oversees approximately 680 conventional train services each day.
More than 100 employees work around the clock to keep the trains running safely.
At facility maintenance control,
real-time awareness of snow conditions along the lines is essential for timely removal.
To achieve this, staff monitored video feeds from
159 cameras installed mainly at unmanned stations,
along with detailed data provided by a weather forecasting company.
If a major cold wave is expected,
services are suspended in advance to ensure there's enough time to clear the snow.
This is the Echigo-Yuzawa Area Center,
which is responsible for snow removal operations on the Joetsu line.
Shortly after 8 a.m.,
with forecasts and other information from facility maintenance control,
a meeting is held to plan the following day's snow removal operations.
Participants discuss when and where to deploy each snow plow
based on weather data and operational conditions.
Once decided,
the plan is relayed back to facility maintenance control.
At today's meeting,
they decide to deploy a large, state-of-the-art snow-clearing vehicle,
the EN-R1000.
As its name suggests,
the EN-R1000 is powered by a 1,000-horsepower engine.
It can blow snow up to 50 meters away from the tracks
and clear the equivalent of 1,510-ton containers of snow in just one hour.
The 25-meter-long EN-R1000 is equipped with heads at both ends,
combining a snow plow mode to push snow aside
and a snow blower mode to blow away accumulated snow.
Depending on conditions,
switching between the two can be done in just one minute.
The snow plow's wings can be adjusted according to track conditions,
pushing snow to either the right or the left.
At around 3 a.m.,
preparations begin for its deployment.
Inside the depot,
a thorough inspection is carried out.
On this day,
it is scheduled to operate on the 38-kilometer section of the Joetsu Line
from Koide Station to Echigo-Yuzawa Station.
At 3.30 a.m.,
the supervisor, driver, and machine operator board the EN-R1000.
After safety checks with the control center,
the points are switched to the main line,
and the EN-R1000 departs.
Operating in snow plow mode,
it pushes snow to the sides of the tracks.
Before entering tunnels and level crossings,
the EN-R1000 has to retract its wings.
This is controlled automatically by an onboard system
that receives position data from the tracks in real time.
The system also issues an audio alert to the crew.
This system ensures the wings are retracted in time,
even when visibility is poor due to heavy snow.
As the train nears Echigo-Yuzawa Station,
snowfall intensifies,
adding to the heavy snow covering the tracks.
But with its powerful 1,000-horsepower engine,
the EN-R pushes ahead without slowing.
Another EN-R1000 passes in the opposite direction.
Snow removal appears to be proceeding smoothly on both tracks,
ahead of the first trains.
About two and a half hours later,
the EN-R1000 arrives at Echigo-Yuzawa Station.
It has cleared the way in time for the first train of the day.
Tasks where snowplows and machines cannot be used,
such as clearing snow from platform roofs and overhead wires,
still rely on manual labor.
Patrolling the tracks is essential in the winter months.
On electrified sections,
snow falling from overhead wire structures
can strike the front of trains and potentially break windows.
Workers armed with insulated shovel-ended poles
patrol the tracks and clear the snow.
Removing icicles inside tunnels is also vital.
On this day, they are working to clear the tunnels in the mountains
between Echigo-Nakazato Station and Tsuchitaru Station on the Joetsu Line.
After the train passes, work begins.
Confirming that it's safe,
nine workers walk along the tracks to the site.
This work is carried out between train operations.
About 100 meters inside a tunnel, icicles are found.
Water seeping from the tunnel walls freezes,
forming large icicles like these.
Using 5-meter-long insulated poles fitted with wooden hammers,
they knock the icicles down.
If this ice were to fall,
it could break train windows and damage pantographs.
Ice adhering to overhead wires is also carefully removed with hammers.
Over four hours, the workers walk 8 kilometers,
removing icicles in three tunnels.
At level crossings and surrounding areas,
snow that cannot be fully cleared by snowplows
often needs to be removed manually.
If snow accumulates on barriers, they may fail to lower.
Road surfaces within crossings must also be cleared by hand
to prevent vehicles from becoming stuck and pedestrians from slipping.
This section of the operation control center
handles the safety of each railway line.
Normally staffed by two people,
in winter, three to four staff are assigned
to ensure snow removal proceeds safely.
Snow-clearing vehicles may be dispatched during the day
depending on conditions,
so the controllers maintain constant communication
with drivers and snow removal crews,
confirming positions to ensure safety.
This is the snow removal line.
It's marked so that the snow removal crew can see where they are.
There's a mark here that says,
the red line is clear.
This is the block that blocks the train from entering.
In this way, JR East's Niigata branch
maintains a 24-hour snow removal system
to respond to sudden heavy snowfall.
We've seen a range of snow countermeasures
used on railways in some of the heaviest snowfall regions.
Ryo, what did you think?
Well, one thing that I was impressed was the systems for Shinkansen,
which is actually more than 40 years old now,
but still working very successfully
to prevent trains from being delayed on the Shinkansen lines.
And on the other hand,
all those members of staff working for the conventional lines,
their works are really impressive, aren't they?
Yes, they are.
You know, through our on-site reporting,
I was impressed by just how the efforts
and the decisions of the people who are working there are.
You know, they're facing the snow every day.
Yes, indeed.
You know, depending on the condition of the snow
or the position on the track,
they have to do things manually.
So, somebody has to see it,
somebody has to, you know, decide on it,
and somebody should work on it.
So, all those works are really important
to maintain the operation of the trains.
That really makes sense.
Next, let's take a look at how Sapporo streetcars
clear snow using a long-standing method.
Sapporo is Japan's northernmost major city.
The city's streetcar operates on an 8.9-kilometer loop line.
In this heavy snowfall region,
operations are sustained by rotary broom snow removers
known as sasara streetcars.
Sasara refers to the bamboo brushes
used to sweep away the snow.
This method suited to Hokkaido's light, powdery snow
can only be seen in Sapporo and Hakodate.
Every October, the sasara brushes are installed.
The sasara streetcar was invented in 1925
by Sapporo streetcars' engineers.
Bamboo is highly flexible,
allowing the snow to be swept away
without damaging the asphalt or the rails.
Before dawn, the sasara streetcars get to work.
The five sasara vehicles that run on the Sapporo streetcar line
are managed by a six-person crew.
It takes two people to operate one vehicle,
one to drive, the other to operate the sasara.
At 4 a.m., the sasara streetcar departs.
On early morning runs,
crews inspect tracks and overhead wires,
removing any accumulated snow.
On this day, snow began to fall at around 5 a.m.,
so snow removal was required.
After about two hours,
the entire line is inspected,
and the sasara streetcar returns,
having cleared the way for regular streetcars
to begin service.
Upon returning, operators immediately check monitors
displaying conditions at stops across the city.
They head out again.
The snow, which began falling at 5 a.m.,
shows no sign of stopping,
and removal is deemed necessary.
To ensure safe operations,
sasara streetcars are dispatched every time snow accumulates.
On calmer days,
operators prepare replacement brushes
fastening bamboo sasara to wooden poles with nails.
Each train requires 16 brushes.
As they are replaced two to three times each winter,
some 150 to 200 brushes are prepared
Thanks to the sasara streetcars,
which operate tirelessly day after day,
Sapporo streetcars are able to run throughout the winter
without major suspensions.
It was interesting to see snow being cleared
using bamboo brushes on Sapporo streetcars.
I mean, it was a fascinating approach.
Well, bamboo brushes may seem long-standing,
but in terms of removing snow
from streetcar tracks in Hokkaido,
that's actually a very practical and effective way.
Yes.
And also the early morning work was quite impressive.
Well, ensuring safety
before the first service in the morning departs,
well, I think we're again seeing
the dedication of members of staff,
which are something necessary
to make the operation in this kind of snowy regions possible.
I can't thank them enough for their hard work.
That's true.