The new layout is finally under construction! I pause a moment to reflect on 8 construction and design lessons I have learned from previous layouts that I am incorporating into the new design.
0:00:00 Introduction 0:01:00 Modular Bench Work 0:03:05 Make The Layout Fit The Budget 0:05:13 Get The Trains Running! 0:06:13 Change Your Direction 0:08:28 Stub-End vs. Double-Ended Yard 0:09:30 More, Smaller Control Panels 0:10:18 Keep The Underside Clear 0:11:30 Conclusion
***NOTE - My apologies for the audio quality in this video. I am still unpacking from the move and have not found all of my regular equipment yet. The microphone on my backup camera is not as good as my usual equipment. Thanks!
Toy Train Tips And Tricks is a channel devoted to the operation, repair, history, and collecting of classic 3-rail O and O27 gauge trains made by Lionel, Marx, K-Line, Menards, and other manufacturers.
Hello again, this is Mike with Toy Train Tips and Tricks.
And today we are looking at a very exciting blank slate, the beginning of the new railroad.
The first bench work is up and ready to go.
And so before I get into the nuts and bolts of laying track and such,
I thought it would be good to just stop for a moment and look at some of the
elements of design that I'm putting into this layout.
That I have lessons that I've learned from both the previous layout and others.
Things that I'm keeping, things that I'm changing and why.
And so to help you as you go about designing your next railroad.
And so the first lesson I've learned is the value of modular construction.
The previous version of the layout, the house that we moved into,
we figured that we were probably only going to be in that house for say five to seven years.
And so knowing that I was going to be tearing down a layout and moving,
I wanted something that I could pick up and move pretty easily.
So as a result, all of the bench work, rather than being in a traditional large open grid,
or actually with the around the walls set up, rather than doing shelf brackets and things like
that, I built modular tables 30 inches wide because I was doing a shelf layout.
And between up to 69 inches long, sometimes shorter depending on what I needed in a particular spot.
So these individual tables, all with their own legs, all with their own substructure.
So it was overbuilt from the beginning.
But what I found was when moving to the new house,
not only was it easier to take it apart because I used a lot of bolts
to construction rather than screws and nails, I was able to take the tables apart.
And my original plan was to take them legs and all, but I found here at the new house,
the floor plan didn't allow for going around the corner with the legs on.
So I did have to remove the legs.
But having that tabletop and that superstructure all set and ready to go,
all I had to do was put legs back on and then reconfigure the tables
to the shape of the new layout, which you're seeing here.
This is four tables from the original layout, four original shelves,
reconfigured into one large table space.
So I can't emphasize enough that this, while the initial construction
used more wood and were more complex than most,
it has paid off in the short amount of time it has taken me
to get up and running with new bench work on this railroad.
The second design consideration was not to make the layout too large.
It is always tempting for modelers to take up every inch of available space with the layout.
And as you can see with my floor plan here,
I have a lot of available space here in the basement of the new house.
However, I have to consider my budget as far as both
my financial budget and my time budget and not bite off more than I can choose, so to speak.
So while I could have dove right into construction of a huge around
the walls layout or a huge middle of the room layout,
I've decided to go with something a little more modest and still bigger than the previous layout,
but it's not going to fill the whole basement.
I'm still leaving areas of the basement
for use of a music room and a workout room and a large workbench area.
And maybe later on, I will expand into those areas,
especially after my twin teen boys move out of the house here in a few years.
But right now, with my time budget,
including the aforementioned twin boys, my work responsibilities and such,
I just don't have time to devote more than three or four hours a week to the model railroad.
Maybe someday when I'm retired, I can devote more like 30 to 40 hours a week to it.
But right now, with that limited budget,
I'm looking for something that I can manage something smaller.
So keep that in mind that while we all want to have the warehouse size monster layout,
be reasonable with expectations as far as how much time and how much money can you actually devote
to your model railroad at the time, and that will help you with your planning.
Next is the concept of get the trains running fast.
So part of this idea of the modular bench work and also making it small enough to be manageable
is get something going quickly to keep boredom from setting in.
In this case, I have this table ready to go.
Now, this is about a third of the actual finished layout that I have designed,
but laying track here on this board will give me opportunities to get trains running so that
when I have 15, 20, 30 minutes, when I want to devote some train time,
I'll be able to come down, slap something on the rails and get moving
rather than coming down looking at unfinished bench work
and looking at a one or two hour project to move into my next stage.
Oftentimes, when we have those roadblocks, it leads to disinterest in the layout.
It leads to burnout.
We find that we can't have these little moments of
enjoyment that help keep us motivated to construct the layout.
So get running fast and you can always expand later if you have the time and the budget.
Now, regarding the track plan, the biggest thing that I was lacking and the thing that I missed
while operating my previous layout was since it was a narrow shelf, it was only 30 inches wide,
all the way around the room, there was really no way that I could work in a functional reversing
loop into my track plan and still have the yards and the switching and the two main lines that I
wanted. And I thought that was going to work out for me because I still had two main lines.
I still had a large yard and other things to occupy my interest, but I find that I really,
really miss the availability of being able to reverse the trains without physically taking
the locomotive and caboose and flipping them around and moving the train around.
So making accommodations for reversing loop was a priority in this layout.
And as you can see in this diagram, I actually have a double reverse loop planned for this.
And that's actually the section that I'm working on first is this quasi loop with
double reverse loops inside. And that brings me to the idea of working in stages. So in this early
stage, the portion that's on this table is a simple loop with double reverse loops with a
crossover in the middle. However, in the ultimate plan, instead of this being a loop, each side
will actually be part of a different main line and the connecting curves will only be used for
the reversing operations. So in this stage, I can operate the layout one way, but later on,
I can incorporate the same track, but use it in a totally different way.
So that's part of working in stages. As the layout expands, the track may be used differently
than it does in the early stages, but still going back to getting the trains running
and also working in stages. So keep that in mind with your track plan to have a way
to get those trains running for the entire track plan is laid out and constructed.
Another major change for this track plan versus my old layout is in the yards. In my previous layout,
I used double ended yard that had access from both main lines, and I thought that was going
to provide me with plenty of operation and it did. But the downside is having to put the turnouts on
both ends reduces the amount of cars that you can work with in the yard so that some of the tracks
were pretty much unusable as far as for keeping trains. However, in this layout, by using my double
reverse loops, being able to change the directions of the trains, I'm going to use stub-ended yards,
which give me one, greater car storage, and two, it's less complex because I'll use half as many
turnouts and half as many uncoupling tracks. The wiring will be less complicated and I will have
longer tracks for more car storage. Another change I intend for this railroad versus the
last is in the wiring. My previous layout, I had one central control panel for the entire layout.
The problems I ran into was as I changed things or as I added new tracks, I had to rearrange
everything on the control panel. Also, it made the wiring runs longer, which meant I had to use
more wire, which is more expensive. And so in this case, since I'm working in stages, my plan is for
each of the small stages to have its own control panel area. So smaller, less complicated panels
with shorter runs of wire. In the end, this will mean I can have more people operating the layout
in the same space, but at the same time, it shouldn't cause a problem for me when I'm running
solo because I can pre-set the controls for what I want to do. The last change that I'm making to
this railroad involves storage. On the previous layout in the previous house, storage was at a
premium. So one of the things that I did was to install shelving underneath each and every table
of the layout. This allowed me to store more items underneath the layout out of the way and
increased our overall storage for the household. The disadvantage of that was that it made wiring
very difficult for my large and old frame to climb onto a shelf in order to run wiring
underneath the layout. So on this railroad, one, we have a larger house. We do have more space to
accommodate this, but the area underneath the layout, yes, I will store boxes and such underneath
the railroad, but not on any type of permanent shelving. If I do install any shelving, it will be
movable so that I can get under the table completely for wiring operations and such
and not have to become a contortionist. So there it is, lessons that I learned from the last layout
and previous layout changes that I'm making as I'm designing this one. And so I hope this
information is useful to you as you go about designing your next layout or your first layout,
as the case may be. And when we come back next time, we are going to start laying the track
and we'll talk about methods and madness for working with tubular tracks, specifically 027,
why I use it, how I use it, and some tricks for better electrical connections and such. So working
with 027 track will be the topic of the next episode of Toy Train Tips and Tricks. Until then,
if you have the trains to run, keep those trains running. And if not, well,
let's get those layouts started so that we can run them too. So until next...