Our annual Lionel O Gauge Christmas traain layout has become a highlight of our family celebrations, with everyone in the family lending a hand with some part of construction and decoration. And visitors look forward to seeing the display when they visit - it’s always a hit. So come along as we build my 2024 Christmas layout - on this episode of Toy Train Tips and Tricks!
**As an Amazon Associate and a member of other affiliate networks, We may receive commissions on qualifying sales generated from the links on this channel.***
Toy Train Tips And Tricks is a channel devoted to the operation, repair, history, and collecting of classic 3-rail O and O27 gauge trains made by Lionel, Marx, K-Line, Menards, and other manufacturers.
In America, toy trains and Christmas have become irrevocably linked in our cultural psyche.
Like turkey and Thanksgiving, like peanut butter and jelly, like Laurel and Hardy,
they simply go together. And it has been this way almost from the beginning of electric trains in
the early 20th century. Here in the 21st century, the tradition continues, even in my own household.
For five or six weeks every winter, the trains are permitted to wander from their
subterranean lair into the regular living quarters for an annual Christmas display.
And while this display may look quite impressive, it can be built in a matter of hours. And if the
layout scenery items are acquired little by little, year after year, there is very little
cost involved. Best of all, the whole family can participate in the setup and decorating of the
layout. And of course, running the trains too. So come along as we build my 2024 Christmas layout
on this episode of Toy Train Tips and Tricks. Hello again, this is Mike. And on this episode
of Toy Train Tips and Tricks, I will take you step by step through the construction of our
annual family Christmas layout. There's nothing wrong with setting up your layout on the floor.
I've done it many times myself. But once again, we have a new puppy in the house,
so elevating the layout is the best course of action. Lest I come home one day to find a scene
from a 1950s sci-fi movie next to the Christmas tree. In previous years, the layout has been
supported by the family foosball table, but that is now gone. I considered purchasing a pair of
sawhorses as quick and easy support system, but I instead chose this pair of lateral file cabinets.
I seldom need access to the contents, so it's not a problem to use them as my layout base.
I already had these on hand, so my construction budget so far is zero. For the layout base,
I once again used a surplus set of bifold doors. These were in the basement when we moved into the
house, and they're not in use, but they make a great support system for a portable layout,
so I kept them around. Check your area building thrift stores, such as a Habitat for Humanity
Restore, for inexpensive used doors. They don't have to look great. So far so good,
and still at zero cost. The next step was to bring all of the Christmas storage totes out
of the basement and put up the Christmas tree. There! Now we are ready to concentrate on the
Now, I did need to spend some money. I purchased a pack of white styrofoam panels to serve as my
scenery base. The foam looks like snow on the ground. It reduces the noise a bit,
and while somewhat firm, it is still easy to install scenery by pushing items into the foam.
I might have made do with last year's foam, but I had used up some of those pieces on other
projects throughout the year, so a new batch was in order. This package set me back around
$12 including tax. I cut the panels to fit on the door with about 3 inches of overhang
on every side to give a little more room for scenery. Once the panels were cut to fit,
I taped the seams together to keep them from sliding around, and I turned the entire foam
structure over. This year's platform was a bit narrower than last year's because the
poles on the foosball table gave me extra room on the sides. As a result, I needed to change my
track plan and village layout this year. But the narrower platform also gave me the opportunity to
try out some K-Line Super Snap track that I was given last year. K-Line marketed this track in
the late 1990s and early 2000s. It is fully compatible with regular O-gauge tubular track,
but comes with extra ties and a blackened center rail. Plus, the ties snap together, similar to
Lionel's Fast Track and MTH's Realtracks, so it connects well without the need for steel pins,
and it stays together very well. The Super Snap lock-on section is also a re-railer,
which is a nice touch. To power the layout, I'm using a K-Line Power Chief from the early 2000s,
and has been a bulletproof performer for me over the years. Ironically, this item is one of the
reasons that K-Line no longer exists. It utilized some of Lionel's technology under the hood.
In any case, connections could not be easier. Simply run a wire between the black and red
variable voltage posts on the transformer to the similar posts on the lock-on. I pushed the wires
through the foam from underneath to make them less conspicuous, and the transformer is also
mounted under the table on a storage tote. Then, it was time for a test run. My Christmas locomotive
is a Beep by Readymade Trains. Unfortunately, RMT no longer manufactures these. I was able to pick
this one up for less than $50 when they were cleaning out the last few models out of their
warehouse. Besides its Christmas colors, the little locomotive is very quiet, and its twin-can motors
can pull a ridiculously long train. The quiet running is a plus this year, as the room has
become more of a family use area, and not just a kid's rec room. I also lit out the Ceramic Village
in a basic configuration. My wife purchased these at Kmart on an after Christmas clearance back in
1991. There are many different makes of village buildings available, and many can be found at
reasonable prices at flea markets, swap meets, and even antique shops. This village has little
collector interest, and I see these buildings on our local antique mall priced in the $15 to $20
range per building on a regular basis. Once I figured out where the buildings would go,
I needed to accommodate the cords for the electric lighting. I dug a trench in the foam
at the back of the layout to make room for a multi-plug outlet for the light bulbs.
The tunnel portals were 3D printed from a design I found on Thingiverse last year.
There are several on the site from which to choose. I customized them with the words
Noel on one portal, and Yule on the other. Now it was time to add the mountain. Utilizing some
surplus pieces of styrofoam, including a few scraps from last year, I cut a long backdrop
behind the main buildings at the same height as the tunnel portals. I cut a few wedges in the
bottom to allow the electrical cords from the buildings to pass through. Then I cut similar
pieces for the perimeter of the mountain, plus a few support pieces to go inside the tunnel to
support the second level. I secured the foam pieces together using a variety of materials,
including wood toothpicks, clear Elmer's glue, and when I ran out of toothpicks,
finish nails did the trick. Simply push the picks or nails into the foam when desired,
no tools required. Then I cut the pieces to serve as the base for my second level.
With a narrower space to work with, I decided to move the skating pond up to the second level this
year. Start with a scrap piece of cardboard box, cover it with a sheet of aluminum foil,
then cut some scrap styrofoam in the shape of the pond, and place it over the cardboard and
foil base. Voila! A skating pond! Next I laid out my rubber cobblestone street.
This comes in rolls that I found at Walmart and Dollar Tree. The material likes to retain its
wound up state, but I found that soaking the rolls in hot water for a few minutes helps the
pavement lay straight. I secured the edges with a few light dabs of clear Elmer's glue,
and set weighted items on the roads until they dried. As promised in a previous video,
I added a Lionel automatic gate menu to the layout to provide some animation.
The accessory is wired to the constant voltage terminals on the transformer.
I did find that the original Lionel 153C contactor did not work well with the SuperSnap track.
I found a similar contactor in my parts box. I think it's an MTH model, and it works very well.
The spring adjustment has a much finer control than the Lionel model, and it seems to hold its
setting better than the Lionel versions too. To keep the shack from vibrating off the board,
and to reduce the noise a bit, I used Gorilla mounting putty at each corner of the shed.
Then I filled in the areas behind and around the buildings with fluffy buffalo snow. I also piled
it up loosely to make the mountains. I needed to secure the snow in a few places such as around the
tunnel portals with clear elver's glue. The rest is just piled up in place. I was able to recycle
all of this snow from last year's layout. Before I continue, if you're enjoying this video as much
as I enjoyed making it, please take a moment and like this video, subscribe to the channel,
and be sure to share it with your friends and neighbors. Let YouTube know that you enjoy this
kind of content, and leave a comment about your favorite Christmas layout. Now back to the video.
Then came the real fun, adding the people, trees, and details. There are a handful of
scale model figures on the layout, such as the ice skaters and skiers, who were produced by
Model Power in the 1990s. But the lampposts, benches, and most of the people were acquired
from Dollar Tree over the past three years. A few other figures, generally the larger scale people,
were gifted from friends and family as their own contributions to the layout.
And this is where the family participation really comes in. Let everyone use the figures to create
their own mini scenes on the layout, like the carolers of the train station, the snowball fight
near the school, and the skier who had a mishap on the mountain. Have fun with the display.
One of my sons found an old broken toy of some sort in his room, I think it was some sort of
Nerf gun, that still had functioning LED lights. We salvaged these and put them on the large
Christmas tree in the center of the village. Speaking of trees, these were also a community
project. I found many trees at Dollar Tree and Walmart, and a large bag was gifted to us by a
family member who found them on clearance after Christmas last year. To secure the trees and
figures, my go-to product was again the Grimma mounting putty. As for the rolling stock, most of
the cars were purchased on eBay as a great bargain last month, and you can see the video describing
these cars by following the link in the video description. The lighted cars with the presents
at Santa were assembled just like last year, using lights from Dollar Tree and attaching them to the
gondolas with Gorilla Putty. The presents were a Dollar Tree purchase. The Santa and reindeer were
an old cake decoration that's been in the family for decades. I also found a package of wreaths
and Hobby Lobby. One adorns the rear of the caboose, and another was added to the door of
the gatelet shack, again using Gorilla Putty. Since there's little reason to access the
transformer, the locomotive lacks horn and bells, I simply set the transformer on a good speed,
locked the reverse unit in forward, and simply turned the power of the train in the village on
and off with a remote control switch attached to the multi-outlet pack. The final addition of the
display was a light table skirt to hide the wiring transformer and storage boxes.
Our annual Christmas NEOD has become a highlight of our family celebrations, with everyone in the
family lending a hand with some part of construction and decoration, and visitors look forward to seeing
the display when they visit. It's always a hit, and I hope it's a hit with you. I hope you found
a few useful ideas for your own display from this video. Keep the trains running, have a Merry
Christmas, or whatever holiday you may celebrate, and we'll catch you next time with more toy train
tips and tricks!