Hauling the World's Biggest Mining Loader Across Australia!

Machine Unlimited
4 followers
I have ALWAYS wanted to see Australian heavy haul. Thanks to Centurion, Komatsu Australia, and BMA, my dream finally came true on our last visit!
First, we visited Komatsu Australia to learn about the build process for the country's biggest mining machines.
And once completed, Centurion heavy haul teams take over to load each machine for hauling into the Bowen Basin.
Finally, thanks to BMA, we saw the team drop this massive WA1200 loader off for its final build at the Caval Ridge Mine, where it's now helping to supply the world with steelmaking coal.
#machine #Equipment #HeavyMachinery
In this video we're going to do a ride along with Australian heavy haul pro
Centurion to see what it takes to move the world's largest mechanical drive
mining loader from the workshop to its new coal mine home.
Welcome to the town of Mackay, located in Queensland, Australia.
While it may not have the nightlife of Sydney or the reefs of Cairns,
this town is the home base for one of Australia's most important regions, the Bowen.
The Bowen Basin is not only Australia's largest coal reserve,
but the largest producer of steelmaking coal worldwide.
No steelmaking coal, no steel. And no steel, no modern life.
The scale of the operations here is hard to comprehend.
You can drive for hours and pass nothing but one mining operation after another,
all owned and operated by the world's biggest mining companies.
But rather than the mining, today we're focusing on heavy haul.
I've watched Australian heavy haul videos online since high school,
always struggling to believe they could move such enormous machines on narrow roads
in remote places. So when I was planning our latest visit,
my first call was to Centurion, one of Australia's undisputed haulage experts.
But before we hit the road, we started at Komatsu's Makai workshop first thing on day one
to learn more about the machine build process and the star of our show, the WA-1200 loader.
It is Tuesday morning at about 7am. We're here in Makai, Queensland.
This is a Komatsu 1200 loader, one of the biggest loaders in the world.
This machine has been built here over the past few weeks and now is set to travel tomorrow
to a mine outside of Moranba, Queensland, about 185 kilometers from here.
But before we get to the whole transportation process,
we thought we'd start here at Komatsu's Makai shop to show you a little bit more
about the machine itself and how they build them before they send them to the customers.
So can you explain, this is built in Japan. Yes.
And then it goes, it ends up in Brisbane. Yep.
And then from Brisbane, it comes to Makai. Yep.
By truck or by boat? Comes to Makai by truck.
So they put all the pieces on truck, they send it up the coast to here.
Yep. And then what are you all doing here?
Yep. So as you can see, the loader comes in piece parts. So we've got the rear frame with the engine
and transmission module in it and then the front frame and all the individual parts, cab,
props, boom, the front and rear axle assemblies. So we essentially build it up and then we do a
base build, but then we add in the customer requests for safety compliancing for mining.
Sure. Generally about a 10 week build.
10 week build. Yep.
Okay. And then there's a more finished one out back.
Yep. So we can...
Yeah, let's look at that one.
It looks way bigger when it's on tires and all put together.
Absolutely.
What are some of the specific modifications you have to do?
Okay. So we need to install a fire suppression system.
Yep. Which is that?
Well, it's actually not on this one yet.
Okay.
You'll see on the one that we're about to load the three red bottles at the back.
I see.
So that's the fire suppression when if there's a fire in the engine bay,
the operator can hit the actuator and then that will extinguish that.
What's the white tank for?
That's the oil reserve tank for the engine.
The oil reserve tank?
Yep.
Okay. And then I know this is an Australian specialty, the e-stops.
They do come standard from factory on the machine.
Yeah.
Okay. And this, if I were to hit this, it shuts the machine off?
Correct. Yeah.
And since it's such a big machine, they're at a few different points.
I think there's four on the ground level and then there'll be one in the cab.
Okay. So in the 10 week process, this is like six weeks in roughly?
Yeah, this is about six weeks.
All right. So you still have quite a bit of work to do.
Yeah.
I see.
The ROPS isn't on, obviously.
Yeah. A fair bit of work to go on this one still.
So then let's go to the stripped machine now.
Yep.
The third machine on site. That's about as big as tires get, huh?
Pretty well, yeah.
So this machine, it's been here for the full 10 weeks.
Yep.
You've built it.
You've brought it to Australian mining standards.
You've brought it up to customer standards.
Yep.
You've painted it.
Yep.
You've tested it.
And now is the disassembly process.
Yep. Correct.
So you want to take just enough off of this for transport.
Yeah.
But you don't want to take it apart unnecessarily.
Exactly. So the transport company will give us the height that we need to work with.
And for this instance, it's the top of the fire suppression bottles at the rear.
Okay.
So anything over that needs to come off.
So that's why this one doesn't have a ROPS.
The cab's off.
All the front handrails are off.
I see. So even the front handrails would be over height.
Yeah.
And all of that is shipped separately and then put back on.
So there should be, there'll be two accessories trailers.
And then there'll be two trailers carrying the wheels out.
And then the boom will go out separately as well.
Okay.
They have built this entire machine here at the shop,
but to prepare it for transport, they've had to start to take it apart again.
So you'll notice there is no front end.
All of that has been removed.
There's no cab that's been removed for the sake of height.
And then there's obviously no tires.
The tires were taken off yesterday and all of that is transported separately.
So now all that remains is the machine itself
sitting on these enormous jack stands built specifically for the 1200 series loader.
Each 60 tons, 60 tons a piece can rest upon these four jacks.
And later this morning, the Centurion crew will show up here.
They'll slide their trailer underneath the loader.
They'll put the loader onto the trailer,
release the jacks, and it'll be ready for the journey.
After a great morning with the Komatsu Australia team,
we got word that the Centurion team would arrive soon to load the machine.
But before that happens, let's talk about some specs.
The Komatsu WA-1200 is the world's largest mechanical drive mining loader.
Powered by a 1,892 horsepower engine,
the completed machine weighs about 482,000 pounds or about 120 standard minivans.
It can wield a bucket with a maximum capacity of 46 cubic yards
and can dump at 21 feet in the air.
And it's hard to believe, but Komatsu makes an even bigger loader,
the WE-2350, although this monster is electric drive.
With that, the Centurion team has arrived.
Now it's time for the main program.
The heavy haul process Centurion just got here.
It's about 10 in the morning.
That is the trailer that's going to get our 1200 to the mine.
He's preparing it now.
He just widened the trailer.
He's lowering the trailer.
And in about 15 minutes, this trailer will be sliding underneath that loader.
We'll be putting the loader down on here, getting her all ready.
There we go.
The ramp's getting lowered down.
And once she's on there, she'll be ready for her journey first thing tomorrow morning.
Tire count.
11.
Okay.
So there's 11 axles with eight tires each.
So that is 88 tires, 11 axles just on the trailer.
And then the truck is another three axles with 16, another 18 tires.
So 88 plus 18, 98, 106 tires, if my math is correct, which is not likely.
With the trailer ready, it was time to position it under the loader.
Danny's the driver handling the big load while Matt's handling the supporting equipment.
So now you're lifting it up.
Yeah, I'll go lift it up now.
So I'll lift it up to that center pivot.
Do you see much of a strain in trailers?
No.
I mean, I've seen them in passing and I drool every time I do.
They're so much nicer.
So cool.
So he's using that remote that he explained earlier to raise the entire trailer
to put it into contact with the lowest part of the load, which is the loader's front end here.
They're going to get this set up.
And then they'll work on the back end.
They'll have to block the back end to make sure it's level.
I think this is going to be one of the coolest videos we've done to date.
I'm calling it right now.
Yeah.
What do you think?
The viewer?
Pretty cool?
So you're making sure it's level across the bottom?
What I'll do, that way the trailer sits straight.
So that way we've got even weight through.
You're not laying that one position right where the trailer can ugly bend.
These are good, easy to lay.
So I've got to get the...
I'd love to put rubber between all of them, but timbers I can't.
I've got to get this thing as low as possible for the height permit.
So I'll get that center pivot close to the deck and that determines our height.
Okay.
Then I've just got to block up under each axle of the seat.
Yeah, since that's the lowest point.
Yeah, it's the lowest point, yeah.
And it won't be...
I won't have any weight on that.
The accelerator just touching there.
That's good.
I've got the back touching first, which is good.
They're bringing the trailer.
That weight will go on the back first.
To pick up the weight of the machine.
Okay.
1200, loaded on the trailer, ready to go tomorrow.
Before we get to tomorrow, thank you so much to Komatsu Australia
for allowing us here at their facility, showing the entire process.
Now we are in the hands of Centurion.
We'll see you at 3 in the morning.
Oh boy, 3 a.m.
All equipment going into Australian mines needs to be Australian spec.
So before we head to the mines on this trip, we need to get our equipment up to compliance.
Someone's got to do it.
The hard work.
That's awesome.
Now you're Australian spec.
That's going to be real safe with your wind now.
Now that the machine's on the trailer, it was time for us to rest up for an early morning.
We had a 3 a.m. start time to beat the mining traffic out of Mackay.
Okay.
Let's go see the big truck move a big thing.
What do you think?
Waiting time?
About 3.30?
And we need the police.
While waiting, Danny ran us through his beauty of a truck.
What we got here is T909, one of Kenworth's icons for Australia.
So a bit different to what you blokes in America got.
See how it's lifted here.
They lift that for the height to get out the heat, get their cab out the heat.
Same with air cleaners to get the air intake out of the dust.
So it's a beautiful truck to drive.
One of Kenworth's favourites here in Australia.
It's lovely to drive.
All come with a bull bar.
Another thing you don't have.
That's a bull bar, not a brush cutter or anything like that.
That's a bull bar, okay?
I mean, every truck out here has one of those.
A lot of trucks run in, say, Melbourne, Sydney and the coast, right?
You'll see trucks with B-doubles and got to keep the length under 26 metres.
Yeah, they'll go without them.
But it's been an Australian thing since I was a kid, mate.
It's part of having a truck in Australia, you've got to have a bull bar.
Yeah, the air cleaners too.
That's just very Australian.
Yeah.
Well, you don't have to have the extension pipe there.
A lot of blokes run the case raids out of the cities.
They have them down low, have the American look.
But for what they call extreme package, like in the dust,
that's why we've got the air conditioner on the roof there to get everything out the dust.
It's just to get out the dust, keep the cleaner air going.
And it looks cool too.
We've got the stain guard across the windscreen, which you don't have.
Yeah, it does look cool.
Yeah.
What's the range on that with that much fuel?
Well, in heavy haulage, OK, so I've got 1,950 litres.
But in heavy haulage, you don't have fuel mileage, you have fuel usage.
OK.
Depends on what weight you've got back there.
Look, I've got 88 tyres back there in that trailer.
So there's a lot of drag to see.
Yeah.
So we'll get close to one to one, like one kilometre going along the flat.
OK.
To the litre.
But pulling up the hills, pull up the hills,
we might as well get down about 400 metres to the litre.
It likes to do it.
But as you'll see going up the hill, they work hard.
And then you want to talk through the trailer as well.
Just a brief overview of the trailer.
OK, right.
It's a Drake 11 by 8.
As you've seen yesterday, it's a winding trailer.
Yeah.
Yeah, you wind it.
So 11 by 8, so eight axles across.
It's all hydraulic.
So as you see with the remote, me up and down with the remote.
We can run these trailers very low.
We can run these trailers down at 900.
We've got to do it at times to get under wires.
Coming out of Brisbane, we've got to run low
to get out on the bridges and things like that.
Such an easy trailer to use.
Simple, basic, but just reliable and good.
For this load, we've got it for the weight.
We've got to have our dolly in place for this load
because of the extra weight.
It makes me longer, so that's why we'll have police.
Because I'm over 35 metres long, I've got to have police anyway.
OK.
But you'll see me as we're going up the hill, we'll put another truck.
There's that one out there.
We'll put him on the front to help me pull up the hill.
So that truck?
Yeah, we'll hook the stiff bar to the bull bar.
Yeah.
I was wondering what that truck was all about.
Yeah, that's what that's for.
Because with the dolly and this much weight,
I won't get enough traction or weight down there to pull this up the hill.
Too steep a hill.
That's what he said.
And you have to go the wrong way in some areas.
One set of lights further down to Bakers Creek down here.
Yeah, well, what we'll do, we'll get to the intersection.
That set of lights is too low.
It's only 6.2.
So I'll cross through the intersection to the wrong side of the road
and miss the lights in the sand and miss the ones over there.
Go around, just go down the wrong side there and come back onto the bridge.
But let's just say like traffic lights.
I don't know, some traffic light's worth $30,000.
I feel like in Alberta, they have it set up where they can just,
they're like on a pivot.
That'd be handy.
They can swing the light out of the way.
Oh, that'd be handy.
For the heavy loads.
Yeah.
It's pretty slick.
Yeah.
So yeah, here they just normally lay them down.
So that'd be a good idea.
But this, because it's not wide enough.
Nah, this is easy.
Because it's only narrow, this is easy to load.
When you get ones like this at nine metres wide,
and that makes a lot of difference.
So sometimes people will not stop here.
Sure.
Yeah, as you'll see, sometimes you won't get trucks won't stop here at times.
So I might start up and get some lights going.
All right.
And I'll put my flags on, I'll put my bloody lights on.
Sweet.
In a way, we've got our flags on anyway, so I'll get all the lights on them.
And we'll have a toolbox of them.
Troy, we'll get going.
Sounds good.
Morning, Troy.
How are you, mate?
Yeah, all good.
Yeah, so we're only 5.8 wide.
Yep.
Yeah, permits are 6.5.
Yeah.
Yeah, 6.4 to the top of the fire suppressions.
Police has arrived.
As you can see, he's measuring the load to confirm the measurements.
They just got 6.4 metres tall, which is pretty tall, but actually not super tall.
I think the permit has 6.6 on it, so it just needs to be below permit.
What's the total length?
39 metres.
Yeah, 39.
6.4 wide.
5.2.
So now I just got to check the red jays and check license.
Too good.
Okay.
All right, right on.
So 5.2 metres wide, 6.4 tall, 39 long.
And without any fanfare, the 186 kilometre journey to BMA's Caval Ridge mine began.
Centurion wasted no time leaving town,
and we were soon in the complete darkness of the surrounding sugar cane fields.
The only time we could catch up was when the convoy slowed for low utility lines,
where an expert crew propped them up and out of the way for the huge load to pass under safely.
After about an hour of driving out of town,
we were now on the main thoroughfare for the region, the Peak Downs Highway.
And we weren't the only big load out here.
785.
Now for the morning's biggest challenge,
the hill leading up into the Bowen with grades exceeding 10%.
This is when Danny pulled off to meet the second Centurion truck,
which he'd hook up to for extra power up the hill.
I took my brand new drone out for a few images in the darkness, until...
Well Aaron, what are we going to do?
While tragic, there was no time for a rescue mission,
as Centurion was off again in only 15 minutes,
with their two Kenworths screaming up the steeper grades.
After holding up traffic for a while, the trucks pulled off again at the top to unhook,
as Danny could complete the remainder of the journey with only his one rig.
The second rig would grab the machine's stands and other parts,
which we'd need for the unloading.
By 7am, the convoy pulled into the bustling metropolis of Nebo,
for a quick sausage roll breakfast.
Now that the sun was coming up, we could capture the scale of the operation.
Since we only had a day for the mission,
our convoy let a few other Centurion trucks hauling mining truck trays pass,
and we continued.
What's coming Aaron?
Wow.
With such beautiful light, we took full advantage of capturing the haulage action
from both the ground and the air, using our one remaining drone.
By 9am, we darted ahead to reach the mine before Danny and company arrived.
Now I was afraid this is where the video would end,
because securing mining company permissions is a little tricky,
but fortunately, we got a hold of the folks at BMA and they said,
come on out!
They were happy to have us, so fortunately, we can capture the end of the journey.
Here it is.
Once officially on site, we drove to the build pad,
where the Komatsu crews would work for the following few weeks
to assemble and thoroughly test the loader.
Our timing was perfect,
as that's when the loader arrived for the final few meters of its journey.
So as you've seen, the loader went on the trailer.
Makai drove this morning from Makai to here, BMA, Capital Ridge mine site.
This is the build pad where the loader will be built by the Komatsu team over the coming weeks.
The final step in the process is getting that loader back on the ground
without that trailer involved.
What they're doing here, this other truck pulled up with the accessories,
those jack stands, the four we saw yesterday, or you've seen earlier in this video,
were on that truck driven to Makai as well.
That telehandler is now positioning those four jack stands underneath the loader.
They're working on one side to start.
You can see the trailer has been lifted up, scooted up this way first.
They're going to slide those jack stands underneath.
They're going to line them up.
They're going to bolt them together so that all four jack stands will be underneath the loader.
And then once that is squared away,
Danny will be able to take the chains off the machine,
lower the trailer down, drive it out the same way it got underneath.
And that machine is here, is ready for a build,
and then we'll be off to work in just a few weeks time.
So that's what's going on here,
is watching them position these and then it'll be time to get out of here.
While they're getting that squared away,
just wanted to shout out the sponsor of the vlog, Ariat, here in Australia.
Check them out for not just footwear, but workwear.
At this point, this is one of my favorite videos we have ever done.
However, because we are recording and editing this video months after we shot it,
the loader is at work and BMA was kind enough to send us some footage of it doing what it does.
So before we're done with the video, enjoy some crispy loader footage.
