Volkswagen engine repair #kasemautoservice

KasemAutoservice
15 followers
Volkswagen engine repair #kasemautoservice #chain #engine #timing #bmw #n57 #new #vw #carenginerepair #automobile
starting to speak now, I'm starting to speak now, I'm starting to speak now, I'm starting
now, I'm starting to speak now.
I'm starting to speak now, I'm starting to speak now.
I'm starting to speak now.
Now we will try 5 from the back, we start with 5, 4, and we go to the front.
Of course, now we are setting the setting to the last.
Now we just need to reach the connection, that is, we tighten it.
We just need to close it to the last.
It is difficult to do this because these are tightened in the hour, so that our work is correct.
Of course, now that we have reached the nut, we tighten it in the hour.
How does the nut tighten?
We must first tighten all the nuts 65 Nm, then tighten them 90 degrees once.
Let's first tighten the clock 65 Nm.
We start here, and then we come to the first one.
Now that we have tightened 65 Nm, we must tighten it 90 degrees once.
Of course, guys, 90 degrees, I have previous videos and I explained to you how to do the degrees.
90 degrees, if we start from here, it ends here.
Okay?
A quarter of a turn.
Okay, guys?
Now we tighten it 90 degrees, and we are done with the degree.
Okay, guys?
We start here.
One, two, three.
Okay.
Now we have a sweet degree.
Okay, guys?
Okay.
As usual, as I explained in previous videos, the sharp is for the front if it is small or big.
Now we are putting the clock 30 Nm.
Now we tighten the nut 90 degrees.
Now this is how it is tightened.
This piece is also tightened 30 Newton, then 90 degrees, one time.
We put the clock 30.
Now it is tightened 90 degrees.
And this is how it is tightened.
We finished the first and the fourth, now we will install the second and the third.
Now we will install the second and the third.
Or we call it the front of the clock.
Of course, it is the first.
We have to get the clock first, then install this piece.
First, we get the presser, get the first clock and install it.
We get the first, then install the piece that is behind it.
Okay guys, stay with me.
First, we get the first clock.
This is the signal.
We have this presser.
The signal of the presser will come with this.
This is the signal.
I will show you the signal.
Is it clear?
I put it here.
We turn it a little bit.
We get this piece.
Now this is the first.
Okay, now we install the back piece.
Of course, now that we got the first, the front, now we install the piece.
Then we get the presser.
The presser of the front, we also get the first.
Now, after we put it down, we install the presser.
We get the first.
Okay guys, now let's tighten them.
Then we install the presser of the front.
Of course, now we installed the clock.
We got the first.
Now we have to install the second, which is on the signal.
Of course, this is a very sensitive piece.
It must be installed properly.
If it comes first.
Here.
I put it on.
This is the presser.
Now we press it a little bit.
A little bit, a little bit, a little bit, a little bit.
Until we get the place.
Okay guys.
Okay, now that's it.
Let's continue the engine.
Now that's it.
Okay, 100%.
But, for you to notice, this point.
It comes like this, opposite.
This is the first.
Okay guys, let's go.
Now, after we installed the engine.
We will install the balance.
The balance, this model guys.
It has no standard.
You have to install it and get the first of the balance.
This model has no standard at all.
I disassemble it and install it.
But I know the standards of it.
Now I will install it.
And I will show you the standards of it.
At the same time, when you disassemble this piece.
You make a standard of it.
How?
Of course, you always get the first.
Okay, now look here.
I got the first.
Okay, this is the balance.
I got the first.
Now, I install the balance.
And I get the first balance on installation.
And I will show you the standard of it.
How it should be.
But, in the future, if you have a balance.
Make a mark from you.
Get the first and make a dot or a line.
Or in the pen.
So, when you install it, it won't bother you.
I install the balance.
Okay, I will show you the standard of it.
How it should be.
Now, the standard of it is wrong.
This should be at the level of the engine.
Okay, now I will raise it a little bit.
I will rotate it a little bit.
I will put this tape here.
And I will put it in the direction of the engine.
Let's put it together.
Let me raise it a little bit.
Rotate it.
Like this.
Now, I raised it up.
Can you see the mark here?
It should be in the direction of the engine.
This is the first of the balance.
Because this model doesn't have a mark like BMW or Mercedes.
It doesn't have a barista.
Okay?
We get the first one.
Then we install it.
But sometimes, what I do is
I get the first one before I remove the tape.
I mark it with the pen.
Or I put it here.
Then I mark it.
But I know the direction of it.
If you want to remove it,
You mark it here.
Then you install it.
This mark should be in the direction of the engine.
This is the first of the balance.
Now, we install the barista.
Then we tighten it.
After we tighten it, we install the oil pump.
Then we install the engine.
I repeat again.
If you want to remove the balance.
Okay?
Let's get the first one and mark it.
Mark it.
Mark it here, here, and here.
It doesn't matter.
The most important thing is that it should be in the direction of the engine.
If it's not installed correctly, it won't work.
The engine won't work.
Okay, guys?
After we install the oil pump,
We get the oil pump.
We install it like this.
We turn it.
Okay.
Then we close this valve.
There is a small valve.
We close it here.
Okay, guys?
Now, we installed the valve.
We close it to close the valve.
Okay, guys?
Now, we install the crankcase.
And that's it.
Peace be upon you.
Okay, guys?
As usual, like any engine,
As we did in the previous video,
We tighten it by hand.
Okay, guys?
The engine is here.
The way to tighten this engine is
62 KV
75 KV
103 KV
132 KV
84 PS
102 PS
170 PS
180 PS
The same way to tighten it now.
Okay?
35 NM
60 NM
90 KV
90-90 KV
10 minutes
Let's start with 35 NM
together.
We set the clock to 35.
As you can see,
It is written here
1, 2, 3, 4,
5, 6, 7, 8, 9,
10
Let's start with 1
2
3
4
5
6
7
8
9
60 NM
We finished 35 NM
60 NM
We set the clock to 60
60 NM
We start the sequence
as it is written here.
1
2
3, 4,
5
6
7, 8, 9,
10
Okay
After we tightened
35 NM
60 NM
Now we tighten 90 KV
Okay?
90 KV
As you know
It is a quarter of a turn
Let's start
Notice
When I tighten
When I tighten 90 KV
The NM is not important
You do not depend on the NM
You depend on the degree of rotation
60, 90, 100
It does not matter
We depend on the degree of rotation
Okay?
We tighten 90 KV
After 10 minutes
We tighten 90 KV
This is the last turn
We tightened 90 KV
After 10 minutes
We tighten 90 KV
After 10 minutes
We tighten 90 KV
After 10 minutes
Now we're going to install
The MEL SENTRY
The first is like the main
This is from the beginning
it has a direction
so you put it on the level here
it should be equal
here the letter is equal
and a dot up
now you can see the difference
you put 100 cm and tighten
you bring the water supply
you bring the second water
here
put it in the middle
like this
and turn it
now we brought the water supply
here
it should be here
like this
it should be in the middle
ok
but this is not important
it has a dot
here
it should be
like this
in the middle
ok
now we bring the water supply
and tighten it
like this
we bring the first from here
it should be like this
ok
you see
here
you put any thick piece
you see
like this
now we tie it like this
so it won't move
ok
when we tie it
it should be like this
like this
now we tighten it
like this
ok
now we put the cable
and bring the first
We'll get the first one here and we'll see if it's working or not.
It's not working.
We'll get the first one here and we'll see if it's working or not.
Let's turn the wheel.
Now let's search and get the first one.
Let's search.
There's a dot here.
Let's see the back.
We got the first one.
Look at the back.
It's 100% systematic.
Look at the back.
This is the center.
It's equal here.
We'll cut it up.
The dot below won't come with us.
We'll cut it up and it'll be equal.
Now we'll continue.
We got the first one.
If we get the first here, we'll have the back 100%.
There's a mark here.
We'll put a pin here.
It must be in the middle.
There are many ways.
I think this way is the easiest.
Let's advertise.
This is a carbon isolation.
A crystal isolation.
Okay?
I'll lower the meter a little.
Okay?
I will turn it a little, this is the first engine, I will turn on the signal, this is the first crank, let's get the first Nissan Trike, here we have a Nissan Trike that needs a small turn,
this is the first engine, after installing the exhaust pipe,
now we will close the exhaust pipe, you can close it or not, but it is better to close it and loosen it to give you a clear view,
now we have finished tightening the exhaust pipe, this is the FV engine that comes with 132 kv and 180 ps double turbo,
let's start the car,
