What Does It Take to Operate a Steam Train

The Age of Rail
4 followers
2 Video Views·Sep 4, 2025
At the Ffestiniog and Welsh Highland Railway, manager Stephen Greig is ensuring that all goes to plan in the opening of the new station at Caernarfon.
Behind the scenes of three preserved steam railway lines - the South Devon Railway heritage line, the Ffestiniog and Welsh Highlands Railway and the Great Central Railway.
The Age of Steam.
Made in Britain, it was one of the greatest technological breakthroughs
the world had ever seen.
The train powered Britain's rise to the summit of imperial power,
and it changed everything,
from the food we could eat to the work we could do.
Born in the 1830s, the Age of Steam lasted 130 years,
and then was gone.
But today, as the rest of the world powers towards the future...
Folks, on the track.
..a network of 22,000 volunteers and 4,000 staff,
like station managers,
signalmen,
engineers
and drivers,
are working together on 130 heritage lines
carrying eight million of us every year.
To see the sight, the sounds and smells, the steam, the coal, everything.
It's all there.
Wonderful.
This is the story of the people
who are keeping our railway heritage alive.
For them, the Age of Steam never ended.
This is Steam Train Journeys.
It's 6am at Boston Lodge train depot on the Welsh Highland Railway.
22-year-old sports scientist and trainee fireman Megan Smith
is preparing locomotive NG143 for the day ahead,
under the watchful eye of Cedric Lodge.
You all right there?
Yeah.
I'm filling up just enough so we can get to Bedgelig,
and once we get to Bedgelig, we'll fill up the water again,
so we've got plenty of water, plenty of steam.
The Welsh Highland Railway
runs 25 miles from Caernarfon in the north, down to Porthmadog,
where it joins the 13-miles-long Ffestiniog,
which has wound its way down from Blynei in the east.
Megan left home two hours ago just to get covered in oil and coal dust,
and her family, for one, are delighted.
We're all members on both the Welsh Highland and the Ffestiniog Railway,
so we just come here, you know, probably...
Family's probably been on the train maybe twice already this week,
and it's only Wednesday.
Coming here is a very nice break to my sport,
and going back home for a little bit is a nice break from here,
so it's a really, really nice balance.
I can kind of...
When I've got time at university, time to spare,
I come here, which is a really nice thing to do.
Megan is on day two of a 10-day assessment,
and her job this morning is to get this steam engine
up to a good operating pressure of 170 pounds per square inch
before she and Cedric can start today's journey.
Well done. Whoa, whoa, whoa.
My aspiration for most trainees is to give them the go,
let them handle the shoveling and do it for real.
At the end of today, Cedric will assess Megan
on every aspect of her ability to fire up and maintain a steam engine.
And if he's not happy, he can fail her.
I have to keep an eye on the steam.
Now, we can ease the blower down.
I work it to seven o'clock.
Let me show you. That's off.
Yeah.
That's on.
You don't need to be winding it back and forth all the time.
A loco has a safety valve that ensures excess steam can escape safely.
But it's steam that could be used as power,
and wasting it is a black mark for any self-respecting fireman.
If it blows off, well, it blows off.
I won't allow that.
Well, I'll try it again.
I'll try it again.
It only went off once yesterday.
That was because I was shoveling the coal on.
Starting in Porthmadog, today's route is a six-hour round trip,
carrying 300 passengers, a total distance of 50 miles.
One of a fireman's key roles is being an extra pair of eyes and ears.
Looking out, keeping a good lookout,
is probably one of the most important things over and above firing.
Megan?
Two yellows.
White light.
Cloaks on the truck.
The journey from Porthmadog to Carnarvon is easy for a powerful loco.
But seven miles into the journey, the track begins to climb,
with an average gradient of one in 43,
which means Megan must anticipate the needs of the engine.
It's all about the balance between the fire,
when the driver's going to accelerate, decelerate,
balancing how much steam, except there's just so much...
It's just a balancing game, a balancing act that I can't quite yet get.
Don't worry about the doors. Leave them open.
Megan's first duty is to the fire and keeping it well-fed.
Back-breaking work for an experienced fireman.
For a novice, very tough indeed.
The next station, Bedgalet, is the last chance to ensure
that the loco has all the coal and water it needs for the climb.
So, we've just arrived in Bedgalet.
We're not quite at the top of the gradient yet.
We've still got quite a bit of a hill to go.
So, it's all about, again, as we say all the time,
it's all about getting this fine balance with everything
to make the engine as efficient as possible.
And this water now will get us all the way to Carnarvon,
hopefully, fingers crossed.
You know, it's never a dull second.
You've got to be on your toes the whole time.
You can't really have a break at all.
Even when the engine's gliding,
you've still got to be watching everything.
Sometimes there's enough time to enjoy the view.
Sometimes.
All across the floor.
Light, light!
Carnarvon may be the terminal,
but for Cedric and Megan, it's just the halfway point.
In just three quarters of an hour,
they need to refuel, remove ash
and move the loco up to the other end of the train.
But in the midst of all that, something else is going on.
Hello.
Today is a big day for someone
who has devoted a lifetime to the railways.
Cedric, who is 80.
Thank you. Thank you very much.
What's that? What do we do? Blow it out?
What, all of it? I can't eat all of that.
Oh, thank you. Thank you.
While Cedric gets to blow out a lighter
and is given a slice of Victoria sponge,
a ravenous trainee finally gets her lunch.
I've trained a number of firemen or firewomen over the years
and it's a pleasure and an honour to see them now firing competently.
Lunch on the move.
155 miles away, in deepest Leicestershire,
is the Great Central Railway,
which runs for eight miles between Leicester North and Loughborough Central.
Every year, the Great Central Railway gets around 130,000 visitors
and one of its annual highlights is its Goods Galore Gala,
an opportunity for the public to see trains haul restored
and much-loved goods wagons as well as passengers.
Malcolm Holmes is in charge of choreographing this giant train ballet
in the Leicester North goods yard,
ensuring that the right wagons get hitched to the right locos.
Railways came into being, essentially, to move freight.
They were a fast and efficient way of shifting coal and other goods
from and between towns and cities.
The railway carried pretty much every conceivable sort of commodity
and you can see behind me, actually, a small variety of wagons,
wagons that would carry iron ore.
We've got wagons carrying lubricating oil, fuels in liquid form.
We take coal, steel products, absolutely anything.
Box vans could contain all sorts of commodities
from fish through to newspapers.
London no longer required to have cows for producing milk
because they could come from anywhere in the country
and it allowed fish to arrive fresh from the port
so that they could be served in the evening for dinner
whereas before, it simply wouldn't get there in time to be eaten fresh.
Before 1825, railways didn't exist.
20 years later, 30 million passengers were travelling on them
and by 1852, freight was the dominant income stream across the network.
Today, at £18 each,
enthusiasts can spend the day at Loughborough Central Station
watching now-empty wagons roll by.
And rolling stock manager Scott Manley's job
is to ensure that the five locos hauling mineral wagons,
wind cutters and box vans
stay out the way of other passenger services on the line.
After falling in love with Thomas the Tank Engine, aged three,
Scott is in his element.
It's my job to make sure the trains run on time,
everyone knows what they're doing,
they're in the right place at the right time
and everything's happening as it should do
and if anything goes off-plan,
it's my job to work out a plan B and sort it out and make it happen.
Today, we've got five goods trains in action
as well as the three passenger sets,
which is quite an achievement
because it shows a variety of different examples of wagons that were used
to move goods around the country.
Most early railways were built to move raw materials,
like coal, short distances from pit to river or seaport.
But as the network exploded in size through the 19th century,
everything from newspapers to fresh food
could be delivered to the remotest village
at almost unimaginable speeds.
We are today demonstrating we've got box van trains
which have moved a great variety of goods.
We've got ballast trains, we've got engineering trains.
So we've got a real variety of vehicles in use here
to demonstrate what would have ran across the country.
Fingers crossed it's going to be a nice, straightforward day
and everything's going to run on time.
Touch wood.
Central, this is Lufthansa departure for Leicester North.
On the Welsh Highland Railway,
trainee fireman 22-year-old Megan Smith
is responsible for powering loco number NG143.
Under the watchful eye of 80-year-old Cedric Lodge.
So far, Megan has successfully kept the fire
producing an operating steam pressure of around 170 pounds per square inch.
But with just ten minutes before they begin their return journey
from here at Carnarvon, 25 miles back to Port Maddock,
Cedric isn't happy.
With it being a sort of a high day,
we lost concentration a little bit.
Yeah, I've got some too.
By the time I got back on after we'd hashed out,
the fire was just clinging on by its fingernails.
We weren't bad for pressure, but it wasn't brilliant.
So I had to pull it all back.
You can't hang around it.
Once you spot it, you've got to get onto it and deal with it.
And you can't suddenly put a whole load of coal on the fire.
That'll just deaden it and make it worse.
Letting it off, then.
So don't be tempted into bailing it all on.
Thanks to Cedric restoring the heat level,
it's vital Megan now keeps it there and gets the pressure back up.
Megan, I would say four more across the back
and two down each side, please.
Pressure gauge is coming round to the red line.
We've got two minutes to go, so everything's looking good.
The pressure gauge is now registering a perfect 175 psi,
enough to move this 62-tonne locomotive,
pulling ten carriages laden with 300 passengers
up and down steep hills, 25 miles back to Porthmadog.
Speed's off.
Rollers off. All systems go.
Perfect.
Now, we've got to climb for about a mile.
Then we go across Hendy Crossing, about five miles an hour.
From there on, it's level.
But the departure from Carnarvon can be a bit tricky.
The engine has all the food and water it requires
and shouldn't need any further refuelling.
I'm sick now after all this, James.
Now you tell me.
The same can't be said of Megan.
As Megan's assessment continues,
25 miles away on the Festiniog railway...
Phone control to tell them that we are doing a track inspection.
..another young trainee is under the spotlight.
23-year-old Ben Brotherwood is training to become a track inspector.
Next train down will be at 12.30.
That's if he passes his year-long apprenticeship.
Today, his supervisor, Alan Tomlinson, is keen to assess Ben's progress.
So try and do it, Ben, sort of every four sleepers.
So we've got to lift at four.
On the right hand rail.
You can see there are what we call dips in the line.
So we are just checking the level
to make sure that it's basically safe for trains and carriages to run on it.
40,000 passengers annually travel on these tracks.
Resulting in plenty of wear and tear,
like cracks, corrosion, warping and twisting.
Effectively, the twist is when you get a difference in the rail height
from left to right, so it's when that starts to develop over a series of sleepers.
So the issue is if you get multiple twists forming,
or if the twist is too big, the train will start rocking.
And if it rocks too much, there is a risk then that the train will fall off the track.
And, well, that is what we try and avoid.
And that's basically what our job is, to keep everything going.
Yeah.
OK, so we'll carry on, Ben.
Reassuringly for passengers, Alan and Ben are not alone.
And while track inspection is vital for the safety of passengers,
the safety of the inspectors is always on the line.
You've got to be really, really on top of the timetable,
where trains are, where you are,
because in a lot of places on the Festinog,
you would not be able to stand at the side of a track when the train comes through,
because you'd just die, basically.
Underneath every mile of steel rail are around 1,800 wood sleepers,
and Alan has just spotted a problem.
This sleeper is starting to split.
There's a few of them, actually.
But that's the worst one here, and this one as well.
So you've got to remember that that is something you keep an eye on as well.
Ben will need to report the damaged sleeper and ensure it's replaced.
He will also be assessed on his technical competence,
especially with a track gauge designed to measure track unevenness, or CANT.
It's a bit like a spirit level, this particular one's digital.
On a straight piece of track, there's no need to have any what we'd call CANT,
but on a curve, what we want to do is lift the outside rail to be higher than the inside rail,
so that allows the train to get round the corner a lot easier
and it stops the train trying to climb up the side of the rail.
But the CANT on a curved section of track must be precisely calculated.
Too much, and the train could derail.
So what we do is we measure what the CANT is on a particular bit of section of track,
sort of stick it into the inside, and then I'll get my reading up on here.
So in this case, I know there's 10mm lift on the outside rail compared to the inside rail.
It also tells me what the actual track gauge is.
So in this instance, it's 602mm.
So that allows me to see if there's any points where it's a bit too wide.
Like painting the fourth bridge, track inspection is always and forever.
And Ben would appear to be on the right track.
We'll carry on, Ben, and we'll do from here now down to where we started,
and that's your track inspection done.
OK, sounds good.
The Goods Galore Gala on Great Central Railway in Leicestershire
is a chance for hundreds of passionate steam enthusiasts
to enjoy the sights and sounds of the wagons
that used to haul coal, fish, meat, oil, mail and newspapers.
Today, running up and down eight miles of track.
And in the cab of locomotive 48624 is fireman Alan Pakes.
Driving a freight train is probably a more skilful job than driving a passenger train,
because when you have a passenger train,
every vehicle on the train has a brake system on it,
so that working the brake is a lot easier.
This train we're working today,
the only brakes on the train are on the loco and on the brake van at the back,
with the guard,
and the skill of stopping large freight trains with just the engine brake
is far, far...
It's a far higher skill level than stopping passenger trains,
where everything's got a brake on.
But driving a train is not like driving a car.
Braking suddenly can have immediate consequences behind you.
Everything with a freight train is calculated well in advance,
because of the fact you are on a reduced brake force,
so you can't react suddenly.
So the driver's thinking half a mile, a mile in front.
But Alan is not only anticipating stopping times,
he's just as concerned about lunch times.
Two sausage rolls, two Cornish pasties.
That's the silver foil, and you just turn them over,
because they're lying on the...
That's the steam manifold, which is where there's the steam in there,
the top of the gauge frame is steaming there, so they're warm.
So it's a bit like a manually operated low-tech rotisserie.
Turn them two or three times, and they'll be beautifully warmed through.
At the other end of the 48624 is volunteer Steve Bradley,
a farmer by day.
Today, he's a brakesman and lookout.
Says we're approaching Skiff and Eyre signals and that sort of thing.
Keep a good eye out, really, in this case.
Make sure nobody tries to get near the train,
and Skiff and Eyre's crossing at the end of the platform
to make sure nobody tries to come across the front.
You have to know so much about what to do in case of emergencies.
You use 90% of your knowledge, 10% of the time.
I do this because I enjoy St George's Railway,
so I enjoy being a guard.
I enjoy the... step-backing time, I suppose you could call it.
The guard at the rear of the train is its eyes and ears,
but above all else, has one indispensable function.
I'm just applying a little bit of handbrake,
just so the brakes apply just enough to keep the couplings quite taut,
so we don't bounce when we come to a stop.
As the train pulls into the goods yard,
these particular wagons have served their purpose.
Steve must ensure the brakes are securely on,
then uncouple the wagons from the brake van and the loco.
Before he heads off, in search of the next batch,
he and Alan will be hauling.
The South Devon Railway runs for six miles,
from Buckfast Lea along the River Dart to Totnes Riverside.
From day one of the railway's existence, safety was an issue.
On September 15th, 1830,
William Huskinson fell in front of Stevenson's Rocket
during the opening of the Liverpool-Manchester Railway,
and was killed.
Ever since then, it became clear
that without some order imposed on the growing network,
chaos would ensue.
And that means signals.
Which, in turn, meant signalmen.
Today, the six-mile South Devon Railway
has a total of five signal boxes.
And after 40 years' experience on the railways,
what volunteer signalman David Bridges doesn't know about signals
probably isn't worth knowing.
The generic nickname for railway signalman is Bobby.
Very often, drivers to this day
will actually address a signalman as Bobby.
This goes back to the earliest days of the railway,
when, before we even had a signalman,
the original signalling was performed by actual sworn police constables,
who would display hand signals to trains,
telling them whether or not it was all right for the train to proceed.
The Regulation of Railways Act in 1889
was in response to the chaotic free-for-all across the UK network.
Its aim was to standardise signalling, points and brake systems.
And David's job is to ensure
that all those systems function in harmony at all times,
to guide each train safely to its destination.
It is an art. Some may say a dark art.
It is. It's a very logical way of working.
Our equipment is very fail-safe.
Points are a way of getting the train to go one way or another.
In the early days of the railway,
the points worked on individual levers, as on the ground,
but that was found to be unsafe,
and there were incidents and many accidents because of that.
So the interlocking frame was invented.
And the interlocking frame is quite simple, actually,
although quite complicated mechanically.
In an interlocking frame system, the points and signals are connected.
The system is designed to ensure
that it's impossible to raise a signal to proceed unless the route is clear.
Signals and points are interlocked with each other,
so the points must be in the correct position
before a signal can be pulled.
If I try to clear the wrong signal,
then the lever will actually be physically locked in the signalling frame.
So the system makes sure that I am not going to try and pull the wrong lever.
And at the same time, once a signal has been pulled,
the points cannot be moved in front of or under a train.
This means, once the point is in position,
all the other levers are deadlocked in place
until the train has safely passed over it.
Any set of points on a main line must have a separate locking mechanism,
which is actually locked physically on the ground
and is also locked within the signal box
to ensure the points cannot move under a train.
And as if to perfectly illustrate the point, or points,
the 1117 sails serenely and safely past.
Sunny day, isn't it?
Oh, it'll be lovely when the rain stops.
Yeah.
Thanks to the hard work and dedication of enthusiasts,
the once dormant Festiniog railway today carries 40,000 people annually.
And by connecting to the Welsh Highland Railway,
there are 40 miles of track in constant use,
which means lots of work for track supervisor Alan Tomlinson
and his maintenance crew.
We found a sleeper that needs changing, Rich.
So if you could ring Control, tell them what we're doing and where.
Yes, certainly. No risk.
Hello, Control. This is P-Way.
We'll be on the mineral line changing a sleeper in Minn Fos.
I'll phone you when we're off the track.
An earlier inspection with trainee Ben Brotherwood
has revealed a dangerously rotten old wooden sleeper.
But with another train now just a few miles away,
Alan and his team need all the speed and polish of a Formula One pit crew.
So if we could change this, get this out quickly
and then put a plastic one instead of it.
Yeah, OK.
I'll get the lights on it now. Yeah, crack on, lads.
On network rail, 200,000 wooden sleepers
are replaced with concrete ones each year.
But on the Festiniog, they've got different ideas.
Nobody clips out, screws up.
The team's first job is to unscrew the bolts of the chairs
or brackets attached to the sleeper.
OK, jack it up.
Lovely.
Next, they must jack up the rails,
which then allows the old sleeper to be loosened and removed.
Just taking the chairs off the sleeper so it's easier to get out.
And then we'll slide it out this way.
Trouble is with these, they've been here so long, they'll split easy.
Told you.
He's too strong for his own good.
Lovely, that was no problem.
They're so old, some of them, they've just split and deteriorated
because of the climate they've been in for so long.
Although plastic sleepers have been available for a few years,
fire safety fears prevented them being adopted wholesale.
Not anymore.
Made from recycled car bumpers, old coffee cups,
plastic bags and computer cases,
these sleepers are slowly replacing wood and concrete.
They have a life of, I think, a guaranteed life of 100 years.
They can then be taken back and recycled again.
They're great because they're a lot lighter and easier to work with as well,
so we're happy.
They're easier to drill,
because obviously when you're putting the chairs or your plates in,
it's drilled and screwed in.
And they're just much easier to work.
And plastic has another advantage.
Unlike wood, it expands and contracts more evenly,
ensuring rails stay level and more accurately aligned.
With the next train due any minute now,
and ballast shoveled back into any remaining gaps,
it's surely time for you-know-what.
OK, lads, nice one. Brilliant.
That's tea then, isn't it?
The Welsh Highland Railway runs for 25 miles
between Caernarfon and Porthmadog.
And today, in locomotive NG143,
trainee fireman Megan Smith is being assessed by older hand Cedric Lodge,
who is watching to see if she's able to keep the steam pressure
at the right level over the last three and a half miles of today's trip.
We've just left Port Croesus Nation.
This is the last token section before we leave Porthmadog.
So, we've got a good fire, we've got the fire we want,
we've got the water we want, we've got the steam we want,
and now it's just the last final stretch into Porthmadog back home.
It's been another exciting day.
It's never boring and the day has gone really, really quickly,
even though it's quite a long...
Even though it's quite a long line.
No, I'm feeling good.
Porthmadog marks the end of a six-hour, 50-mile round trip,
which, for the fireman, is an exhausting shift.
But NG143 needs to be parked in a siding for the night,
which means switching points.
On the first one.
Same with the second one.
And all I'm going to do is wave the driver forward.
No, no, it's going to say, stand back, just in case.
Cedric will be marking Megan on multiple aspects of today's performance
and the day isn't over yet.
The 61-year-old loco needs prepping for tomorrow.
First, the still-glowing coals must be removed, along with any ash.
So, we're just kind of getting rid of the fire at the moment.
So, this is a handy tool we have.
So, this connects to the grate and the fire
and it just kind of rocks it, encourages the embers to fall through,
but I'm only doing a light one at the moment.
By raking out the firebox,
Cedric is dislodging as much burned material as possible.
So, we're just waiting for Cedric now to finish pushing through the fire.
I'm just cleaning the remainder of the embers from the grate.
We've pushed the bulk of it through the bars
with the help of rocking the grate,
but we've got one or two hard bits, some might be clinker,
but it seems there are some bits of broken brick arch
which are quite hard.
And if they got stuck between the bars when you're rocking it,
you'd not be able to get the bars level again.
And that would mean that somebody tomorrow morning
would have to go into the firebox and clear them.
The raked ash and other material
has now collected in special pans below the firebox,
which is Megan's job to collect.
But perhaps she feels that Cedric hasn't been pulling his weight today.
I would go and get another barrow, but we don't have many left.
Because people have left them by the side.
Well, I've managed to find a space.
This is the bit where I usually fall over or end up in the barrow.
Oh, well...
You've got to run up. Good traction.
There you go.
You can tell you've done that before.
Although Megan has another eight days of training to complete,
they'll be elsewhere on the network,
which means her time with Cedric is over.
It's all gone extremely well.
I couldn't think of a better way of spending my 80th birthday.
I call myself the luckiest man in the world.
The Buckfastley signal box on the South Devon Railway.
Signalman David Bridges and his colleague Chris
are able to talk to an identical box just over three miles away
at Bishop's Bridge.
Normal communication between signal boxes
is done with codes on bells.
It goes back right to the very, very early days of the railway
before they had reliable telephones.
It's a system that works. We've kept it going.
This track is divided into two sections
and the bells tell the signalman where the train is and what it is.
So, we'll now hear a code...
2-1, that means train out of section.
That's Bishop's Bridge telling us that the train has got to Bishop's Bridge.
3-1 is a stopping passenger train.
On single track lines like the South Devon,
it's vital that only one train is using any stretch of track or section at a time.
To ensure this happens, there's a simple rule.
Whichever train has been given a key or token gets priority.
The Victorians introduced electric token machines like this.
Once a token has been put back into an identical machine
in the other signal box at Bishop's Bridge, it releases one here,
meaning the driver with the token knows he's the only one using the track.
So, the system is secure
because only one token can be out of the machine at one time.
No train can come from this end
and until that token has gone back into the machine at the other end,
then I cannot take another token out for a train to follow.
Grab the token.
These tokens must be physically handed to the train driver.
And today, that job falls to Dave's colleague, Chris Gaunt.
I'll examine the token to make sure it's the right one
for where they are going to.
And then, once they've got that, they know then
that they have got the authority to proceed to the next signal box.
Pull off, as we say in the trade.
And after a morning of points, signals and tokens,
David and Chris take a moment to reflect on the meaning of it all.
It's a strange old existence like that.
You spend a lot of time on your own,
quietly sitting in the corner, reading your book or whatever.
But at the same time, you are very much a part of a team with other signalmen.
Cattle, I think, Dave. Yeah, I think tea's probably a good idea now, yeah.
We've got to keep certain railway traditions going, haven't we, sir?
The trainee in the box, if the roll falls to me.
I think that rain's finally eating off, isn't it?
A signalling system that relies on levers, pulleys,
semaphore and metal tokens may seem amusingly antiquated to us now,
but its introduction was a major improvement to rail safety.
I'll let Bishop's Bridge know the train's on its way.
130 years on from railway signalling being standardised
to modern computer-driven systems
handling thousands of track movements a day,
signalmen essentially do the same job,
keeping the passengers, trains and goods free from harm.
It's like a club and junch, isn't it?
All part of the excitement, isn't it, sir?
Brake's screwed down, it's unhooked there.
Today has been Great Central Railway's Goods Galore Gala,
and in the Leicester North Goods Yard,
Malcolm Holmes is in charge of all the wagons that arrive and depart.
Guard and brakesman Steve Bradley is back making sure
that Malcolm knows exactly which wagons are now out of service
before collecting their next ones.
But knowing where each wagon is, is an essential part of Malcolm's job.
What would have happened when freight was moved around in wagons like this
is that marshalling yards would have hundreds and hundreds of wagons
and they'd need to be shunted around, moved around into the right order
in order to go on from whoever produced them
to the customer or the destination, simply.
So it's a question of moving them around.
And on a heritage railway today,
we do a lot of moving around of coaches and of wagons for different purposes.
At first glance, a goods yard appears a sleepy, almost benign environment.
But wagons must be parked in a certain order
to allow the right loco to access the right wagons.
You can imagine being in a yard full of locomotives and wagons being moved around,
and they're heavy, it could be upwards of 20, 30 tonnes being pushed around a yard.
It's a very dangerous place to be if you get struck by one.
You haven't got many chances if you get hit by one of these wagons moving,
even at a slow speed.
Shunting has got a bit of a tragic history in my family
because my great-grandfather worked for the Great Western Railway in Swindon.
He was killed in a shunting accident.
So it's a reminder for me to be very careful when undertaking this kind of work.
With no signal boxes in the yard to switch the points, Malcolm's on his own.
I've been like this since the beginning of railways.
Brakes.
Alan and Steve, meanwhile, have re-hitched themselves to a new wagon train
and head back from whence they came.
And with a little help from one of his train-driving friends,
Malcolm must now gently shuffle the recently-delivered wagons
into the correct siding.
We've got brakes on a number of the wagons,
obviously to stop it rolling away.
The number of brakes on these sorts of wagons varies, really.
Some of them have got brakes fitted, automatic brakes.
Some of them don't.
This train is operating what we know as loose-fitted,
so that it doesn't have any brakes at all, apart from the guards van, the brake van,
hence why it's called a brake van, and the brake on the locomotive.
But each vehicle, each wagon, has its own brake to hold it in position.
When it's sat in the yard like this, to stop it rolling away.
This job would have been done by a shunter,
so it's actually the sort of job that I'm doing now, many years ago.
Certainly keeps you fit.
Happy that everything's ship-shape,
Malcolm and the driver start shunting away.
On the exit signal, you'll clear to draw forward into the head shunt.
Roger, stood over.
All vehicles are moving.
Hand signals are perfectly adequate in most circumstances.
In fact, it's still perfectly safe to control this entire movement using hand signals.
It just makes it easier and a bit safer using the radios.
The problem is when the driver loses contact with me,
particularly when the train's coming backwards, as you'll see in a moment,
because he can't see where the train's going, you're well clear.
Stop, stop, stop.
So I'm now changing the points so that the train can go back
into the siding that we now want it in.
Route set, you're clear to set back, set back.
Roger, stood over.
So you'll see me constantly repeating the same signal
so that he knows that I'm here and in control.
Set back, set back.
One wagon length to go.
Set back, set back.
Another six feet.
Four, three, two, one.
And that's perfect. Stop, stop, stop.
That's good. Train's out of position and out of the way.
And we didn't hit anything either.
And with the help of one shunting loco,
Malcolm has finally got every wagon exactly where he wants it.
Thank you very much, that's really helpful.
Yeah, so if you drive to exit signal and then, yeah, all yours.
Cheers.
It's very much like an orchestra, like a symphony,
conducting a symphony, having a railway working,
because every bit's got to happen at the right time,
otherwise, of course, it all falls apart.
