Starship Flight 10 scheduled but something Bad happened! NASA Nuclear Reactor Coming|Space Weekly #9 === 00:00: Intro 00:48: Flight 10’s new launch window 04:24: B16 and B12’s movement === #greatspacex#elonmusk#spacex#nasa == Advertisers who want to place ads on our channel, please contact the email manager: [email protected] === SpaceX Starship SN Be the first to sponsor us Thank you. https://www.patreon.com/GreatspaceX?fan_landing=true === Starship Flight 10 scheduled but something Bad happened! NASA Nuclear Reactor Coming|Space Weekly #9 SpaceX has confirmed the Flight 10 launch window following a successful engine test. Ship 37 appears set for more testing, while B12 and B16 have been moved—though B16 won’t attempt a catch. In Florida, infrastructure work continues, and NASA has begun planning a nuclear reactor for the Moon. Let’s dive into this week’s top stories on Great SpaceX. Starship Flight 10 scheduled but something Bad happened! NASA Nuclear Reactor Coming|Space Weekly #9 Starship Flight 10 now has a launch window—but with Ship 37 still in testing, readiness remains uncertain. Meanwhile, Booster 12 may soon be retired, closing a key chapter in Starship’s development. We’re now well into the first half of August, and that puts us right up against Elon Musk’s recent estimate for Starship Flight 10—originally predicted for mid-August. However, up until now, all those estimates have been just that: projections without a firm date or specific launch time. Thankfully, we finally have something more concrete. The official launch window has been narrowed down, thanks to a Local Notice to Mariners (LNM) from the U.S. Coast Guard’s Navigation Center. This advisory outlines Super Heavy activity in the Gulf of Mexico off the Texas coast—directly correlating with SpaceX’s Starbase operations. Starship Flight 10 scheduled but something Bad happened! NASA Nuclear Reactor Coming|Space Weekly #9 According to this notice, Starship Flight 10 is currently scheduled to launch sometime between August 16 and August 22. The available hours remain centered around midday in Texas, which should provide ideal visibility for both stage separations and landings—especially valuable for public and analytical observation. However, this timeline does indicate that the launch window has slipped slightly beyond Elon Musk’s mid-month target, placing Flight 10 firmly in the latter half of August. But even that window could prove optimistic, depending on the remaining steps for Ship 37. Although the previous round of testing appeared largely successful on the surface—based on visible cues and standard procedures—internal data reportedly revealed an issue with one of the vehicle’s Vacuum engines. That complication led SpaceX to perform a full engine swap, a process that involves extensive verification, recalibration, and eventually a repeat of static fire testing. ---- We use images and content in accordance with the YouTube Fair Use copyright guidelines: https://www.youtube.com/intl/en/about/copyright/fair-use/ Any questions about copyright please send us via Gmail: [email protected] To be resolved, thank you.
SpaceX has confirmed the flight 10
launch window following a successful
engine test. Ship 37 appears set for
more testing while B12 and B16 have been
moved, though B16 won't attempt a catch.
In Florida, infrastructure work
continues and NASA has begun planning a
nuclear reactor for the moon. Let's dive
into this week's top stories on Great
SpaceX. Starship Flight 10 now has a
launch window, but with S37 still in
testing, readiness remains uncertain.
Meanwhile, B12 may soon be retired,
closing a key chapter in Starship's
development. We're now well into the
first half of August, and that puts us
right up against Musk's recent estimate
for Starship Flight 10, originally
predicted for mid August. However, up
until now, all those estimates have been
just that, projections without a firm
date or specific launch time.
Thankfully, we finally have something
more concrete. The official launch
window has been narrowed down thanks to
a local notice to Mariners from the US
Coast Guard's navigation center. This
advisory outlines Superheavy activity in
the Gulf off the Texas coast directly
correlating with SpaceX's Starbase
operations. According to this notice,
Starship Flight 10 is currently
scheduled to launch sometime between the
16th and the 22nd of August. The
available hours remain centered around
midday in Texas, which should provide
ideal visibility for both stage
separations and landings, especially
valuable for public and analytical
observation. However, this timeline does
indicate that the launch window has
slipped slightly beyond Musk's midmon
target, placing Flight 10 firmly in the
latter half of August. But even that
window could prove optimistic depending
on the remaining steps for ship 37.
Although the previous round of testing
appeared largely successful on the
surface based on visible cues and
standard procedures, internal data
reportedly revealed an issue with one of
the vehicle's vacuum engines. That
complication led SpaceX to perform a
full engine swap, a process that
involves extensive verification,
recalibration, and eventually a repeat
of static fire testing. To support the
upcoming test, the suborbital stand has
now been reinstalled, and new umbilical
pipes have recently been fitted to the
test mount. This suggests that SpaceX is
putting the final touches on its ground
systems before bringing S37 back out for
a critical round of retesting. If all
goes well, we may see ship 37 return to
pad B for its second test campaign as
early as next week. The actual testing
is expected to be quick, possibly
completed in just one or two days,
especially if SpaceX decides to limit it
to a full engine static fire rather than
repeating all preliminary checks.
Assuming that the retest goes smoothly,
S37 will then be rolled back to Meabay 2
for final launch operations. These will
include detailed inspections, payload
integration, and the installation of the
flight termination system. That process
should take roughly 3 to four more days.
Only after all these steps are complete
can the ship be declared fully flight
ready and moved to the launchpad for
integration with E16. Speaking of
booster E16, its status remains
unchanged. It's standing by at the
launch site and is presumed ready to
support flight 10 once S37 is cleared.
But considering the current timeline for
S37's testing and final prep, the
earliest realistic launch date now looks
to fall somewhere near the end of
August. And frankly, that's still a
rapid return to flight. If we consider
how the program was delayed after the
S36 incident, despite the setback,
SpaceX has been pushing hard to maintain
momentum and minimize downtime while
still maintaining its usual rigorous
approach to flight safety and quality
assurance. Flight 10 needs to be a clear
success, not just to validate fixes made
since the last launch, but to preserve
the program's credibility and keep
NASA's HLS timeline on track. Now that
the official launch window is defined
and progress is becoming more visible,
it's time for predictions. Based on the
pace of testing, recovery, and
integration, my best guess for launch
day is the 21st. What's your prediction?
Drop it in the comments, like the video,
and don't forget to subscribe so you
don't miss the next big step in
Starship's journey to space. In addition
to ship 37, it is important to remember
that the timeline for Starship Flight 10
also depends on B16. However, its impact
on the overall schedule appears to be
less significant. This is largely
because B16 has already completed most
of its flight preparations. In the most
recent update on the morning of the 6th,
B16 was moved from the Mega Bay to the
rocket garden. After spending nearly two
months inside the Mega Bay undergoing
outfitting, the booster has now emerged
with a fully installed hot staging
assembly. Observers also noted that one
of its grid fins was rotated while it
was positioned outside the mega bay,
indicating that the grid fin actuation
system is in working order. What remains
uncertain at this point is whether the
flight termination system has already
been installed. If it has not, it is
still possible for that installation to
take place directly at the rocket
garden. Based on current signs, it seems
B16 will remain in this area rather than
return to Mega Bay 1 and will likely
move to the launchpad once the rest of
the vehicle stack is ready. In summary,
there is not much remaining work left
for B16. As a result, its presence is
unlikely to become a major factor in
delaying flight 10, unlike S37, which is
still undergoing several rounds of
testing and final checkouts. So now the
focus shifts to when exactly B16 will
make its next move toward the launchpad.
As for why SpaceX decided to relocate
B16 at this particular moment, that
answer also became clear. On the
afternoon of the 6th of August, shortly
after B16 arrived at the rocket garden,
B12 was observed moving in the opposite
direction, heading back into the mega
bay. This suggests that B16's move was
primarily to free up space for B12's
arrival. So, what does this mean for
B12? Currently, the chances of it being
reused are virtually non-existent. As a
result, whenever an older booster is
moved back into the mega bay, the most
likely outcome is that it'll be
scrapped. B12 holds a special place in
the Starship development timeline. It
was the booster used for flight 5, the
very first mission where SpaceX
attempted to catch the booster using the
tower's arms. This makes B12 a historic
and pioneering piece of hardware, one
that truly deserves to be preserved at
Starbase or possibly displayed in a
museum. It is unfortunate that B12 might
be dismantled. However, as a V1 booster,
it no longer matches the evolving needs
of Starship's future. Scrapping it
allows SpaceX to recover materials, free
up storage space, and reallocate
components toward newer, more advanced
prototypes. It is a cost-saving and
efficiencydriven decision, even if a
sentimental one. So, let us take a
moment to thank B12, the booster that
marked the beginning of Starship's
recovery and reuse efforts, a true
milestone in SpaceX's capture-based
landing technology. Returning to B16,
its relocation not only made space for
B12, but may also signal upcoming
developments. As of now, Mega Bay is
occupied by B12, B15, and B18. There's
still room for one or two more boosters
inside. Many observers are speculating
that this is a sign that the next
generation B19, a V3 prototype, will
soon be stacked. This makes sense as
SpaceX is rapidly approaching the end of
its V2 and V1 hardware flights. With
only two remaining vehicles in those
configurations, it is highly likely that
the first V3 launch could take place
later this year. B18 is nearly ready to
be stacked and ship 39 is already in the
Star Factory awaiting integration.
SpaceX needs to scale up production to
keep pace with the ambitious flight
schedule planned for 2026, a year that
could prove to be pivotal for Starship.
So, let us keep our eyes on the
production site in the days ahead.
Exciting developments are on the
horizon. Ship 37's full duration static
fire is done. Flight 10 can't be far
behind. After the rapid return to static
fire testing and the success of ship
37's single engine trial, SpaceX
prepared for its most significant ground
milestone in months, the full duration
six engine static fire. Though the
closure of local roads for this event,
scheduled quietly from 7:00 a.m. to 9:00
p.m. on August 1st, wasn't widely
publicized. It underscored just how
critical this test would be. Early that
morning, the familiar choreography
unfolded. The Raptor work platform
descended into place around ship 37,
then rolled back to clear the way.
Support crews activated the detonation
suppression system and inspectors sealed
off safety perimeters. By midm morning,
the giant chopstick cranes lifted into
position, ready to hold ship steady once
the burn concluded. At roughly 2 p.m.,
the first clouds of vapor drifted from
the tank farm. Liquid oxygen and methane
flowed through freshly inspected lines
on the orbital launch mount into ship
37's tanks. Though a few utility
vehicles made lastminute trips past the
pad, reflecting minor troubleshooting,
the fueling sequence proceeded without
hiccup. Steel frost rings delineated the
liquid oxygen fill level while methane's
telltale frosting crept across the lower
tank surfaces. The live stream cameras
even caught another flap exercise,
reminding viewers that attitude control
surfaces would play their part during
ascent. With fueling complete, the site
fell silent for a tense minute. Then,
water gushed from the massive deluge
nozzles beneath the pad. Within
heartbeats, six Raptor engines roar to
life, each one thrusting against the
dampened flame trench and sending shock
waves through the desert air. A plume of
smoke and dust billowed outward,
momentarily obscuring the booster before
clearing to reveal a steady simultaneous
shutdown after roughly 10 seconds.
SpaceX later confirmed on X full
duration static fire for the Starship
preparing for our 10th flight test. It
was a succinct victory lap. Ship 37's
engines and plumbing had performed
flawlessly. The new test stand and water
deluge system had withtood the harsh
thermal and acoustic stresses. And most
importantly, the groundwork was set for
flight 10 itself. In the hours that
followed, the post- test routine began.
Chopsticks lowered ship 37 gently onto
its transport stand. Then the crane
released. Ground crews fastened
inspection plates over each engine's
throat and exhaust, preparing the
vehicle for its slow trek back to Mega
Bay 2. Over the coming hours, S37 would
be stowed beneath the bay's roof where
technicians would pour over telemetry,
sample engine components, and ready the
ship for its next transformation. The
installation of avionics, payload
fixtures, and final heat shield touches.
Meanwhile, across the yard, activity at
Meabay 2 continued a pace. Early that
morning, after S37's cryo test, ship 38
had been rolled inside for its own
series of checks. With engines soon to
be installed and flaps already in place,
S38 is poised to follow its sister
vessel through cryogenic proof, static
fires, and ultimately a full launch
cycle. If all goes according to plan,
flight 11 could arrive barely a month
behind flight 10. Not far off, B16, the
super heavy core designated for flight
10, sat in its own workshop. After weeks
at the Star Factory for hot staging,
ring installation, and final plumbing
tweaks, B16 was wheeled back into the
bay. Teams ran inspections on its
methane transfer tube and grid fin
mounts before beginning mating
operations with ship 37's stack. Musk's
mid August launch target now felt within
reach. With static fires complete and
stacking underway, only pad
refurbishments and integrated dress
rehearsals remain. Returning to
Starbase, the success of ship 37's
static fire marks the transition from
ground tests to the final push, flight
readiness. Within days, we should see
the towering stack roll onto pad A for
system checkouts, tank pressurization
tests, and ultimately the countdown to
flight 10. If you're ready for that next
leap, declare it in the comments with
here we go. Then make sure you like the
video and subscribe to the channel.
We'll always be right here tracking
every bolt, every ignition, and every
roll out as SpaceX forges ahead into an
unprecedented era of space flight. Well,
this isn't good. Ground tests for
Starship S37 are done, but unusual
activity at pad 1 suggests possible
issues. Could another test be coming,
and will it delay the launch? Currently,
S37 has been moved back into Mega Bay 2,
which usually signals that major testing
has concluded. In parallel, the OM or
orbital launch mount test system that
was used during the S37 static fires is
being dismantled. The test stand itself
is now being relocated to the Sanchez
site where it'll be kept in storage for
potential future use as a backup system.
What's more surprising, however, is that
new systems are not the only ones being
moved. Some unusual activity has
recently been spotted at pad 1. Most
notably, 15 out of the 20 booster hold
down clamps have been removed from the
OM. These clamp arms are critical
components designed to secure the
Superheavy booster during pre-launch
operations. According to standard
procedure, after a ship test is
completed, the pad is usually
refurbished in preparation for the next
mission. In this case, that would
involve bringing B16 to the pad for
integration. However, with the removal
of most of the clamp arms, B16 cannot be
placed on the launch mount unless those
systems are restored or replaced. That
suggests a disruption in the expected
flow of operations. And it raises a
critical question. Why would SpaceX
remove such essential hardware at this
particular stage? The most widely
discussed theory is that SpaceX intends
to conduct another round of testing with
S37. While the recent static fire tests
appeared successful to the naked eye,
there is speculation that the data
collected may not have met internal
performance benchmarks. Observers have
pointed out that the six engine static
fire test lasted just over 10 seconds,
which is much shorter than the one
minute tests performed on more recent
prototypes. This shorter duration
suggests that SpaceX may have been
aiming to verify specific performance
parameters without pushing the engines
to full operational limits. If this
theory is true, SpaceX might be planning
a more extensive test to explore engine
flexibility and endurance in preparation
for flight 10. However, this idea is
complicated by the fact that SpaceX has
already removed the test systems and
moved the stand to storage. In order to
retest S37, they'd need to reinstall the
testing infrastructure, transfer the
vehicle back onto the stand, and repeat
the procedures. That process would take
a considerable amount of time and
effort. If SpaceX does pursue this
option, it would likely delay Flight 10.
The timeline would have to account for
rebuilding the test platform, moving and
reintegrating S37, conducting the test,
and then returning it to Meabay 2 for
final checkouts and installation. This
entire sequence could take 1 to two
weeks given that the projected timeline
for flight 10 had originally targeted
mid August. Such a delay would almost
certainly push the launch window further
out. However, if an additional test
increases the reliability of the vehicle
and improves mission success, it might
be a worthwhile trade-off. In the latest
updates, SpaceX truly moved the test
stand back to the launch site. Some
vacuum engines were moved to Mega Bay 2,
so S37 may be tested again with new
engines, and they can increase the test
limit at the upcoming test. A second and
perhaps more grounded theory is that the
hold down clamps themselves are
undergoing maintenance. In this case,
SpaceX may have identified a mechanical
issue or wear and tear that requires the
clamps to be removed for inspection,
repair, or replacement. This explanation
is supported by the visible readiness of
B16, which appears to have completed its
installation process and is prepared for
rollout. If the clamp removal is purely
for maintenance, they can be reinstalled
once repairs are complete, allowing
operations to resume without a
significant schedule impact. Under this
scenario, the launch schedule for Flight
10 could still remain intact, especially
if the work is completed within a short
time frame. However, this would place
crater reliance on S37's performance
during its relatively short static fire
test. While previous Starship prototypes
have launched following similar short
duration tests, the standard in recent
months have shifted towards longer full
duration engine burns, especially now
that the flame trench is operational and
capable of handling the stress of longer
firings. So, what do you think is going
to happen? Will SpaceX test S37 again
before flight 10? Let me know with a yes
or a no in the comment section down
below. Then, be sure to like the video
and subscribe to our channel to stay
uptodate on every milestone in SpaceX's
incredible development journey. While we
are on the topic of Starship, let us
shift our attention to Florida. The
expansion of Starship operations to the
east coast has been in discussion for
several years and now we are seeing real
progress on that front. SpaceX has
active plans for two key locations,
launch complex 39A or LC39A and Space
Launch Complex 37 or SLC 37. At LC39A,
construction is already well underway. A
new Starship launch tower has been built
at the site and the orbital launch mount
is currently undergoing renovations.
These developments show that SpaceX is
preparing the site for future Starship
missions in earnest. In terms of
planning, a major milestone was achieved
last year when the environmental impact
statement for Starship launches from
LC39A was released. That report outlined
a target of up to 44 Starship launches
per year from this historic pad.
Recently, the effort has taken another
step forward. The FAA has officially
announced the release of the draft
environmental assessment for Starship
activities at LC39A. The new document
maintains the same annual launch target,
but provides greater detail regarding
infrastructure and operational areas.
Notably, it introduces more specific
names for new systems and designated
zones within the launch complex. It also
outlines access restriction areas that
will be be enforced during testing,
launching, and landing activities. This
transition from environmental impact
statement to an environmental assessment
shows that specific work is now in
motion. Regulatory agencies will begin
conducting actual surveys and
assessments on site. The process
includes a public review phase which
will remain open for comments until the
29th of September of this year. The FAA
has also scheduled public meetings for
late August and early September to
gather further input. Once the comment
period ends and any revisions are made,
the FAA will publish the final
environmental assessment. This final
document will give the green light for
construction and launch operations to
proceed at LC39A.
Once that approval is secured and
Starship's operational capabilities at
the site are confirmed, full-scale
facility work and launch preparations
can begin. A promising future lies ahead
for Starship in Florida. If all goes
smoothly, we may soon witness Starship
launches from the legendary Kennedy
Space Center, a site long known as the
mecca of aerospace innovation. As
preparations for Starship's 10th flight
continue, SpaceX has confirmed the
Superheavy booster will not be caught
this time. So, so why skip the catch
attempt? In a bold move, NASA has also
announced plans to build a nuclear
reactor on the moon, a major step toward
powering future missions and permanent
bases. Flight 10 of SpaceX's Starship
program is likely just a couple of weeks
away, and preparations are accelerating
on all fronts. The latest developments
at the launch site have introduced some
unexpected twists, including the
reinstallation of a key system at pad 1.
This system had previously been
dismantled following a successful round
of tests with S37, but is now back in
place. The surprise return of this
hardware strongly suggests that SpaceX
intends to test S37 again. The test
stand has already been transported back
to the launchpad and lifted into
position at top the orbital launch
mount. Meanwhile, over at the production
site, there have been there has been
notable change involving the Raptor
vacuum engines. One of the vacuum
optimized Raptors appears to have
encountered a problem during the
previous round of testing, prompting
SpaceX to swap it out. This kind of
issue detection during the ground test
phase is actually a positive
development. It allows engineers to
address problems early, preventing more
serious complications during flight.
This is especially important now given
that Starship has faced issues in three
separate launches so far this year. As a
result, the ship segment will receive
close scrutiny in the leadup to flight
10. As of now, no official schedule has
been announced for S37's next movement
or test. However, it's unlikely to take
long to reinstall the test rig and
secure the newly installed engine. With
that in mind, another round of static
fire testing could take place later this
week. Based on community feedback and
recent observations, it now seems likely
the full engine test will last only
around 10 seconds rather than the minute
long duration previously expected. The
shorter duration is due to limitations
in the pad one water deluge system which
lacks the capacity and design of a
traditional flame trench used for
extended firings. In contrast, B16
designated for flight 10 alongside S37
has been relatively quiet following its
hot staging event and transferred to the
mega bay. It's currently unclear whether
this booster has had its engines
installed yet or if any final upgrades
have been completed. However, activity
is starting to pick up. The booster
transport stand has been moved into the
mega bay, indicating that B16 may soon
be rolled out to the rocket garden. This
move could either be for final
outfitting or to free up space inside
the mega bay for stacking upcoming
boosters. As flight 10 approaches, more
answers about B16 and S37 will soon come
into focus. For now, attention is
turning toward what we can expect from
the mission itself. According to recent
internal sources, SpaceX has decided not
to attempt catching B16 on this upcoming
flight. This decision is both logical
and somewhat surprising. On one hand, it
makes sense to continue testing landing
techniques in the ocean as was done with
B10 and B9 before it. On the other hand,
B16 is a brand new booster and scrapping
it after a single use might appear
wasteful. However, the reality is that
flight 10 will serve as an important
technical milestone, focusing on several
complex landing maneuvers. These include
the active landing flip immediately
after stage separation, a descent at a
higher angle of attack, and a landing
attempt using only two engines. Each of
these objectives presents a high degree
of difficulty and increases the risk of
mission failure. Removing the variable
of a catch attempt simplifies the
mission and allows SpaceX to concentrate
fully on gathering data from these
experimental landing techniques. To
support these efforts, several
modifications are being made for the
landing flip maneuver. Adjustments are
likely being made to the hot staging
ring to accommodate the aerodynamic and
control changes needed. The descent at a
steeper angle will test the booster's
structural strength and the resilience
of critical subsystems. Performing a
landing with just two engines will place
extra demands on the engine systems
reliability and control, especially
under conditions of repeated ignition
and shutdown. It's very likely that B16
underwent reinforcement and thorough
inspections during its time in the Mega
Bay, and this level of attention will
continue right up until launch day.
These tests, though they may not result
in a recovered booster, are laying the
groundwork for much more efficient and
successful flights in the near future.
For example, perfecting the active
landing flip and high angle descent will
help conserve fuel, extending the range
and utility of Starship missions.
Mastering two engine landings will give
SpaceX the flexibility to complete a
landing even in the event of an engine
failure. These advances will eventually
make catch attempts more viable,
reducing risks and increasing
reusability. So, while B16 may not be
recovered, it will play a vital role in
pushing the Starship program forward.
Its contribution will help pave the way
for the next generation of vehicles and
recovery systems. Looking even further
ahead, the decision not to attempt a
catch with B16 also marks a step toward
the long anticipated B3 era. So keep an
eye on all the upcoming developments and
continue supporting the Starship
program. If you're excited for flight
10, type 10 in the comments, like the
video, and subscribe to our channel so
you can stay up to date with every step
of SpaceX's bold journey toward making
life multilanetary. Now, let us turn our
attention to one of NASA's boldest and
most ambitious ideas for the moon. The
construction of a nuclear reactor.
Beyond the goal of returning astronauts
to the lunar surface, NASA has long been
focused on building sustainable
infrastructure that will support
long-term human exploration. As those
goals begin to move closer to reality, a
new and highly ambitious plan has
emerged under the leadership of NASA's
interim administrator Shawn Duffy.
According to a recent report from
Politico, NASA is preparing to release a
directive outlining a roadmap to build a
100 kilowatt nuclear reactor that will
one day operate on the surface of the
moon. This proposed reactor would be a
significant upgrade to the 40 kowatt
fish power system that NASA and its
partners have been developing for years.
The goal is to launch and deploy the
system by 2030. To make this vision a
reality, NASA is expected to begin
soliciting proposals from private
companies and research organizations
across the space and energy industries.
This nuclear initiative is part of the
Artemis program, NASA's flagship mission
to return humans to the moon and
eventually establish permanent outposts
on the lunar surface. However, providing
reliable power for a base on the moon
presents unique challenges. Unlike
Earth, the moon experiences extremely
long nights with each lunar night
lasting the equivalent of about 14 Earth
days. During that time, solar power
becomes unreliable or even unusable for
maintaining life support,
communications, and scientific
equipment. This is where nuclear power
becomes not just an option, but a
necessity. But this project is about
more than just power. It also carries
strategic implications. China in
collaboration with Russia is
aggressively pursuing its own lunar
program through the International Lunar
Research Station or ILRS. Their plan
includes landing humans on the moon and
building a permanent base of their own.
To maintain its leadership in space
exploration, NASA must not only match
China's pace, but stay one step ahead.
Advanced technologies like nuclear
reactors could provide the US with a
crucial strategic advantage in this new
space race. Nuclear energy has numerous
benefits in this context. It provides
high output, longduration power and does
not rely on the availability of natural
lunar resources in the early stages of
base development. However, there are
also serious challenges. Designing,
building, and safely operating a reactor
in space is no easy task. It will
require advanced technical expertise,
rigorous safety standards, and careful
planning for transport, deployment, and
long-term maintenance on the moon. Even
so, NASA appears confident that the
benefits outweigh the risks. This
project could be a gamecher for deep
space exploration and future missions
beyond the moon. Of course, none of this
will be possible without first
establishing a sustained human presence
on the lunar surface. That is where
Artemis comes in. Step by step, NASA is
laying the foundation for a permanent
foothold on the moon. As these critical
milestones unfold in the years ahead, we
will be watching closely. Stay tuned.
This has been Kevin with Great SpaceX.
Don't forget to like this video and
subscribe if you haven't already to stay
uptod date with yours truly on the
latest milestones in SpaceX's journey.
Thank you so much for watching and
always remember, curiosity, imagination,
and inspiration will follow you so long
as you keep looking up.