00:00 Intro 03:06 Meet Miguel 04:21 Insulating the edges 08:56 First insulation block test 13:22 Second insulation block test 16:24 Getting materials 18:19 Making a whole lot of blocks 22:30 Bottom floor planks 24:34 Shoehorns 25:24 Insulation in 29:04 Top floor planks 30:41 End result
[Music]
5 years ago, we bought this abandoned
piece of land to try to find another way
of living. And since then, we've been
building our base camp, regenerating the
land, and trying many approaches and
materials to build more sustainable.
And we also document what we do so that
we can all learn from it.
This week, we're going to do the floor
inside the granite ruin. It's going to
be amazing. There's going to be natural
building. There's going to be mud. It's
going to be fantastic. So, welcome to a
new project cam video.
[Music]
Okay, just a small recap. We found this
granite ruin when exploring the land.
And last year, we renovated it, digged
the bottom floor, rebuilt the walls, and
put a temporary floor.
Finally, we made the roof. So, the house
has now two stories. Our next step is to
replace this temporary floor with a
permanent one. And we will also create
our own floor insulation for the first
time. Not so sure how it's going to go,
but let's see. All right. First step
when we move the floor is that we take
all of these out, put them to clean, and
then back in.
[Music]
In the previous update, you saw us
starting to build a roof extension, but
at the same time, we were working in the
interior. So, through the video, you'll
notice both timelines overlap.
[Music]
So, what's going to happen for the floor
is that we're going to reuse
these ones. That was the temporary
floor, but this time we're going to put
them inside like on the bottom from the
bottom. Then, it makes sort of like a
frame with a bottom for us to slide in
through the insulation that we're going
to do homemade.
But first, we will clean the planks we
took out and leave them aside for later.
[Music]
We're done with the floor.
Joke. No, we just took out the floor and
now we can actually get started on the
work. And the first thing we want to do
is to fill the wall, the hole between
the granite wall and the structure. This
these gaps here. And to do that, we're
going to use cork. It's leftovers from
the previous work we had done before. So
we're really using those plank and
shredding them or using them as they are
and stuffing them in between.
So something like that. The cork is
going to come in here. Right, Miguel? Oh
yeah.
By the way, this is Miguel and he's
helping us mostly also for all of this
construction.
He's our insulation master.
[Music]
During COVID, I decided to leave the
city and its overwhelming pace. The idea
was to learn how to build my own house
out of natural materials. To do so, I
converted my van, traveled through
France, met a lot of people in
construction sites, and lot a lot on
sustainable architecture. Beforehand, I
was a muralist for 10 years, and get to
work on a bunch of cool projects.
I got bored by the use of chemical
paint, which is a real ecological issue.
The discovery of clay as a construction
material was a turning point in my life.
I heard from project camp through my
brother and decided to step into this
adventure together. To me, project camp
is a good way to show that we can
collectively build a better living. In
the near future, I would like to become
a professional builder in natural
construction and find a piece of land to
start a community project.
But now, let's go back to work.
So this is what our leftover looks like.
And we put them
beef
in between.
[Music]
We stuffed all the cork and now they're
holding in place by themselves, but we
really want to secure them. And to make
sure that it's in place, we're going to
put a lime
mortar here to really make sure that it
creates a good transition with the
structure and that the cork cannot fall
out.
[Music]
Miguel
is rewetting the wall as we speak.
Miguel appearance. I'm here. And for me,
I'm going to start on the lime mortar.
So, we will make a natural lime mix,
same as we did when we made the walls
for the ruin and update 125.
You can also find more information about
proportions and materials in the
research module.
Okay, let's try on the wall.
Follow me.
It has to stick. It has to stick on the
wall.
Not enough.
[Music]
There's number two.
Oh yeah. Way better.
Perfect.
That's
[Music]
why down
So yesterday I finished to plaster the
three top holes with a plaster made of
lime and sand. So now that's the result.
Want to seal
here between the rafter and the lime. So
the hair could not pass. The surface has
to be rough like it is so it will be
easier for the next coat to adhere. So
it's done for today and uh we will let
it dry over the weekend.
So the first coat is dry and strong. I
will be able to finish the job today I
guess. So uh for that I will try to fill
in the gaps the remaining gaps we have
all around. And uh I will use the same
mix made of sand and lime. And also I
will use this kind of broken tiles I
found around the rune to fill in the
bigger gaps.
[Music]
there to fill the gap.
[Music]
He's an artist.
Okay, now we can go to the workspace to
start with our insulation journey. For
the insulation of the floor, we've
decided to build our own insulation
panels. They will be made of straw and
clay. We will introduce the mix from the
top to the bottom. The the mix will be
condensed. And after drying, we will see
which mix is the best.
[Music]
Here we will have one mix with one
ratio, another ratio, another ratio.
We will start mixing clay with water.
Many times with natural materials, it's
more a matter of feelings than an exact
number.
[Music]
The bubble tin must uh stay on the hand.
It makes like a glove
and it's beautiful. Yeah. But this one,
this mix has too much clay. So, we'll
add more water in it.
[Music]
too much again.
[Music]
So the first step to do the mix.
[Laughter]
[Music]
Okay, this is one kilo of straw. We're
going to split it in half and
mix it. Erit.
[Music]
So, we made the mix and left it to rest
overnight.
The next morning, we are ready to start
filling up the molds.
[Music]
All right.
Three, four days ago, we did our test
here and we did three different tests
with different ratios of clay. And now
it's time to see how they've been doing
in there.
Oh my goodness.
So first of all, thank you for this
Oscar.
How much water inside?
Okay. Well,
take a book. Yeah, it's a book. book of
as we can see the 8 kg of clay is not
really conclusive. This one is the 6 kg
clay is good but it's pretty heavy and
we have this one light the lighter one 4
kg of clay and I think we we can start
with this one and maybe do other tests.
So, our new try outs are 2 kilo of
liquid clay for 1 kilo of hay, 3 kilos
of liquid clay for 1 kilo of hay, and 3
and 1/2 kilo for 1 kilo of hay. If
you're having a hard time following,
remember that there is always the
research module you can go back to for
the hardcore number and the math. All
right, let's do this.
[Music]
[Applause]
[Music]
One of the challenges we already faced
during the test was the changing
weather. We had many rainy days which
slowed the drying, but still enough
sunny days to keep going. ready to get
dried. We leave them for at least a day,
but with the sun, it's going to go
really fast. We'll come back when
they're dry.
[Music]
Oh my god.
Little bit. This is 2 kilo of clay for 1
kilo of straw. And it's kind of squishy.
We can already draw some conclusion, but
we're going to wait that they dry all
the way to do that.
Let's see.
Okay, so we have a situation here. Uh I
don't have the video clip for that
results of the second test. So, I'm
going to find Miguel.
Hey, Miguel. Hey, we don't we don't have
the footage for the end results of the
second test of the clay. Really? No, you
know what is it? We did it. It's not
there. Come on. It was so fun. Okay.
Yeah, but uh we need to tell the people
what ratio you actually picked for the
bricks. Um I don't remember really. It
was um
maybe I will check in the the research
module. I think we it's written.
Wait, wait, wait.
Can we make our own insulation? Chapter
nine. The ratio was 1 kg of straw for 2
kg of liquid clay.
Fair enough. Good. Good. Then we can
continue. Let's go. So, yeah. Next thing
is doing the bricks.
Well, actually, we first need to get a
lot of raw material.
We are going to an abandoned brick
factory to get some clay.
[Music]
This is a great spot. We came last
season when building the stone walls of
the room. Lots of quality clay.
And we also need a lot of straw. So we
went to see a local guy, very friendly.
He even lended us his van to carry the
straw to camp. Okay, this is 300 kilo g
of straw.
Let's go.
To cover the floor of the ruin, we need
around 30 blocks. Each of it is 7 kg of
straw and 14 kg of liquid clay.
We also learned a bit from the first
test. We made some few upgrades and I'm
going to show it to you. First, we did
some holes perforations on the back
panel and on the bottom because we
noticed that the clay sometimes with the
compression has a bit of a hard time to
dry. So, we did that. And also, we have
those new
panels that are like the bottom of our
mold. So we made some holes
uh yeah holes at the bottom of the mold
and the holes are being covered by this.
So this will be the end of the mold when
we want to actually demold
uh our insulation panels. We just have
to push this up and it's going to come
out by itself.
Yep. Okay. Now we can start. We will
turn camp into a production line.
[Music]
We made the first batch and let it dry
for some days.
[Music]
Now it's time to do this all over again.
A lot of times
[Music]
we need to speed up. So, Miguel made
another mold to go twice as fast.
[Music]
[Music]
[Music]
All right. Welcome to insulation
paradise. So far, we're up to 12 full
panels of 90 cm. We think we might get
there in a week because now we have two
modes. So that's quite awesome.
[Music]
[Music]
Where?
[Music]
[Music]
[Applause]
So, we are done with our panels. They
are here. We did almost 30 pieces. And
now we will let them dry for maybe one
week before putting them uh in the room
in our floor. Uh meanwhile it's time for
us to clean all the area here. And um I
don't know. Everything is clean. It has
been really fast. So now we will pack
everything and store it into the
container. Let's go.
[Music]
What are you doing, Miguel?
I'm flipping the sides. I'm uh extending
the drying zone.
[Music]
It's been a long process. The drying
finally took 2 weeks. So, meanwhile, we
came back to the granite ruin to move
ahead with the floor.
We are in the bottom room and you know
exactly where we are. And today it's a
very big day because we're putting the
temporary floor right here. It's going
to be very simple, very efficient. We're
very motivated. Let's do this.
[Music]
When we took the planks from the top, we
marked them so we could replicate the
same pattern in the bottom. This way, we
avoid a lot of headache puzzling them
back.
[Music]
Done. But we are reaching now the tricky
part and this is uneven
and mysterious.
We are going to put them not here
but there
like that. So this is flush.
So Mik is taking some measurements.
Hey. Hey.
Uh, how much overlap do we need? Maybe
five. Okay.
[Music]
[Laughter]
[Music]
We're done with the floor. At least just
the bottom part. And it's a great use
because we're going to be able to put
the insulation that we've been making.
So, we're going to bring them here. And
with the tool that Miguel is doing right
now, we're going to insert the
insulation panels.
To make our two shoe horns, I will need
this metal sheets. These ones are
aluminum. I will have to do a couple of
folds and curve them in a way so it will
be easy to handle them and to put them
into the in between the beams.
[Music]
Heat. Heat.
[Music]
[Music]
Wow. Perfection. Perfection.
Let's go to check in the room. So
finally the moment we were waiting for
is here. We have our panels dry and we
have now to put them into the floor
beams. Those panels are more or less 45
cm and between the space between the
rafters the beams is different. Here is
38. You got 40 and sometimes 43. So,
we'll have to cut all more or less all
the panels to the dimensions.
[Music]
And here we have to put more straw bells
inside. Heat.
[Music]
Heat.
[Music]
Sometimes we had some gaps in between
the panels. So, um, we thought it was
useful to to fill them out with some
straw like this. That's why we have
different colors now. So, is this fresh
new and these ones are from the
insulation panel themselves?
[Music]
Heat. Heat. N.
[Music]
The floor is done.
Megan and Monique did an amazing job.
Everything is finished and sealed. And
fortunately, it's the weekend. So, give
us a bit of time to
let it breathe a little, get the dust
out of the way, settle, and we'll come
back to seal the floor with our amazing
basketball court, of course.
Okay, let me explain for the new
viewers. The planks we are going to use
come from a basketball court that was
dismantled in town. We've been using
them for more than 2 years and the
sawmill still has a lot
[Music]
Okay.
[Music]
Oh my god.
[Music]
So, it is the end of the day. The the
floor is freshly laid. It took us one
day to put all the boards together. Uh
it was a bit hard sometimes because of
the straw. We had some difficulties to
put all the boards uh into the grooves.
So anyway, now this step is done. We can
move to the next step. But that will be
for a future update. For now, we are
happy with the result.
It was a big try out for us and we still
need to see how it behaves over time.
All right, that was it for this video.
If you like what we do, you can support
us on Patreon. There you will find 4K
video, no ads, and also the videos one
week ahead. That's a pretty good deal.
But if you're just happy to cruise
along, feel free to stay on the YouTube
and see us making very cool things like
this roof that you might see next week,
for example.
See you next week, guys. Have an amazing
week. Cheers. Byebye.