Mass. Pike drivers warned of ‘very intense’ traffic delays during bridge replacement project

Boston 25 News
215 followers
26 Video Views·May 28, 2025
If you’re on the Mass Pike between exits 123 and 125 or the 95 in Newton and Weston, alternate routes are your best bet this weekend as MassDOT says a project is underway.
Find the full story on Boston25News.com: https://www.boston25news.com/news/local/middlesex-county/mass-pike-drivers-warned-very-intense-traffic-delays-during-bridge-replacement-project/ACS6EHL3IFFY7KTVQDUT4GKUBI/
Follow Boston 25 News on:
YouTube: https://www.youtube.com/@Boston25News
Facebook -- https://www.facebook.com/Boston25News
X -- https://x.com/boston25
Instagram -- https://www.instagram.com/boston25/
TikTok -- https://www.tiktok.com/@b25news?lang=en
Download the Boston 25 News app: https://www.boston25news.com/mobile-apps/
Major highway closure will impact
thousands of drivers in our area
starting this weekend. You're looking
live at the Mass Pike right now. That's
typical. But starting Friday night,
there will be lane closures between
exits 123 and 125 in Newton and Weston
in both directions. It's likely to cause
a major headache for anyone heading out
and around Boston this weekend. Boston
25 News reporter Ellie Morio is live
along 95 in Newton Nelly. They want you
to be like the scouts. Be prepared.
Yeah, that's right. I actually want you
to take in how sweet this traffic flow
is right now. It may not be like that
for long. Those lane closures and
temporary rail shutdowns will be
happening on two separate weekends.
Phase one, though starts Friday night at
9:00 p.m. So, if you're on the Mass Pike
between exits 123 and 125 or the 95 in
Newton and Weston, alternate routes are
your best bet. It's going to be hell.
Masdot says this will be a swift but
strategic project. It aims to replace
the I90 bridge over the MBTA railroad
and it will happen in two phases. Phase
one starts this weekend and those
closures and rail shutdowns will go
through 5:00 a.m. on Monday. Phase two
will be the demolition process of the
existing tunnel on the westbound side of
the turnpike. That will happen the
weekend of June 20th. Of course, it's
misery when especially when anything
goes down here in Boston with the
tunnels and stuff and trying to get
through here during a weekday is tough.
On the weekends, forget it. For commuter
rail riders on the Framingham Worcester
line, the MBTA is finalizing two key
shuttle routes. Framingham to Riverside
and West Newton to Kenmore. These will
be reliable alternatives during service
adjustments. But beware of bus travel
and potential traffic on detour routes
will likely increase your travel time
compared to the train. So there's really
a lose-lose situation here when it comes
to traffic. Deutsch tells me he owns a
travel-based mobility and stretch
therapy company which requires a short
window to get to and from each of his
clients. He says these lane closures may
now force him to take back roads. Back
roads are an option for me but and for a
lot of people, but it's still with back
roads, you're going really slow, you
know, and everybody else who's also in
traffic is also hitting the back roads.
Now, Masdot says it is working with
state and local law enforcement. Drivers
are encouraged to make time and have a
plan because if you don't, Masot says
you could be seeing about a 3hour delay.
You do not want to get stuck for that
long. Commuters, make sure that MBTA app
is also handy. We're along the 95. I'm
Ellie Murio for your local station,
Boston 25 News.
